(1) In this chapter, "structure" has the same meaning as it has in the Act.
Examples
1 a roadway or pathway
2 a ship or submarine
3 foundations, earth retention works and other earthworks, including river works and sea defence works
4 formwork, falsework or any other structure designed or used to provide support, access or containment during construction work
5 an airfield
6 a dock, harbour, channel, bridge, viaduct, lagoon or dam
7 a sewer or sewerage or drainage works
Note Terms used in this regulation have the same meaning that they have in the —ch 6
title="A2011-35">Work Health and Safety Act 2011(see —ch 6
title="A2001-14">Legislation Act, s 148). See also the dictionary, note 3.
(2) This chapter does not apply to plant unless—
(a) the plant is—
(i) a ship or submarine; or
(ii) a pipe or pipeline; or
(iii) an underground tank; or
(iv) designed or used to provide support, access or containment during work in connection with construction work; or
(b) work on the plant relates to work that is carried out in connection with construction work; or
(c) the plant is fixed plant on which outage work or overhaul work that involves or may involve work being carried out by 5 or more persons conducting businesses or undertakings at any point in time.
Note This chapter does not apply to the manufacture of plant (see s 289 (c) (i)).