(1) ASIC must take reasonable steps to ensure that copies of the current text of the following r elevant transitional instruments or requirements are available for inspection and purchase:
(a) each provision of an instrument mentioned in paragraph (b) or (c) of the definition of relevant transitional instrument or requirement in regulation 12.5.01 that is the subject of a determination or declaration under subregulation 12.5.02(1) or (2);
(b) each ASIC transitional standard.
(2) A failure to comply with subregulation (1) does not affect the operation of a r elevant transitional instrument or requirement .