New South Wales Consolidated Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Download] [Help]

GREATER TAREE LOCAL ENVIRONMENTAL PLAN 2010

- Made under the Environmental Planning and Assessment Act 1979
- As at 17 April 2020
- Reg 287 of 2010

TABLE OF PROVISIONS

   PART 1 - PRELIMINARY

   1.1.    Name of Plan
   1.1AA.  Commencement
   1.2.    Aims of Plan
   1.3.    Land to which Plan applies
   1.4.    Definitions
   1.5.    Notes
   1.6.    Consent authority
   1.7.    Maps
   1.8.    Repeal of planning instruments applying to land
   1.8A.   Savings provision relating to pending development approvals
   1.9.    Application of SEPPs
   1.9A.   Suspension of covenants, agreements and instruments

   PART 2 - PERMITTED OR PROHIBITED DEVELOPMENT

   2.1.    Land use zones
   2.2.    Zoning of land to which Plan applies
   2.3.    Zone objectives and Land Use Table
   2.4.    Unzoned land
   2.5.    Additional permitted uses for particular land
   2.6.    Subdivision--consent requirements
   2.7.    Demolition requires development consent
   2.8.    Temporary use of land
           Land Use Table
           Note
           Zone RU1. Primary Production
           Zone RU3. Forestry
           Zone RU4. Primary Production Small Lots
           Zone RU5. Village
           Zone R1. General Residential
           Zone R2. Low Density Residential
           Zone R5. Large Lot Residential
           Zone B1. Neighbourhood Centre
           Zone B2. Local Centre
           Zone B3. Commercial Core
           Zone B4. Mixed Use
           Zone B5. Business Development
           Zone B6. Enterprise Corridor
           Zone IN1. General Industrial
           Zone IN2. Light Industrial
           Zone IN4. Working Waterfront
           Zone SP2. Infrastructure
           Zone SP3. Tourist
           Zone RE1. Public Recreation
           Zone RE2. Private Recreation
           Zone E1. National Parks and Nature Reserves
           Zone E2. Environmental Conservation
           Zone E3. Environmental Management
           Zone E4. Environmental Living
           Zone W2. Recreational Waterways
           Zone W3. Working Waterways

   PART 3 - EXEMPT AND COMPLYING DEVELOPMENT

   3.1.    Exempt development
   3.2.    Complying development
   3.3.    Environmentally sensitive areas excluded

   PART 4 - PRINCIPAL DEVELOPMENT STANDARDS

   4.1.    Minimum subdivision lot size
   4.1AA.  Minimum subdivision lot size for community title schemes
   4.1A.   Subdivision of certain residential lots
   4.1B.   Exceptions to minimum subdivision lot sizes for certain split zones
   4.1C.   Exceptions to minimum subdivision lot size for land in Zone RU1 or E2
   4.1D.   Exceptions to minimum subdivision lot size for boundary adjustments
   4.2.    Rural subdivision
   4.2A.   Erection of dwelling houses on land in certain rural and environmental protection zones
   4.2B.   Minimum subdivision lot size for strata subdivision of residential or tourist and visitor accommodation in certain zones
   4.2C.   Erection of dual occupancies in Zone RU1
   4.3.    Height of buildings
   4.4.    Floor space ratio
   4.5.    Calculation of floor space ratio and site area
   4.6.    Exceptions to development standards

   PART 5 - MISCELLANEOUS PROVISIONS

   5.1.    Relevant acquisition authority
   5.2.    Classification and reclassification of public land
   5.3.    Development near zone boundaries
   5.4.    Controls relating to miscellaneous permissible uses
   5.5.    (Repealed)
   5.6.    Architectural roof features
   5.7.    Development below mean high water mark
   5.8.    Conversion of fire alarms
   5.9.    5.9AA. (Repealed)
   5.10.   Heritage conservation
   5.11.   Bush fire hazard reduction
   5.12.   Infrastructure development and use of existing buildings of the Crown
   5.13.   Eco-tourist facilities
   5.14.   Siding Spring Observatory--maintaining dark sky
   5.15.   Defence communications facility
   5.16.   Subdivision of, or dwellings on, land in certain rural, residential or environment protection zones
   5.17.   Artificial waterbodies in environmentally sensitive areas in areas of operation of irrigation corporations
   5.18.   Intensive livestock agriculture
   5.19.   Pond-based, tank-based and oyster aquaculture

   PART 6 - URBAN RELEASE AREAS

   6.1.    Arrangements for designated State public infrastructure
   6.2.    Public utility infrastructure
   6.3.    Development control plan
   6.4.    Relationship between Part and remainder of Plan

   PART 7 - ADDITIONAL LOCAL PROVISIONS

   7.1.    Acid sulfate soils
   7.2.    Flood planning
   7.3.    Earthworks
   7.4.    Airspace operations
   7.5.    Development in areas subject to aircraft noise
   7.6.    Development on land proposed to be acquired by the Council
   7.7.    Development for farm stay accommodation
   7.8.    Subdivision of land at Brimbin in Zone RU4
   7.9.    Subdivision of land at Brimbin in Zone E4
   7.10.   Use of land at 10, 34 and 44 Emerton Close, Cundletown
   7.11.   Essential services
   7.12.   Events permitted without development consent
           SCHEDULE 1
           SCHEDULE 2
           SCHEDULE 3
           SCHEDULE 4
           SCHEDULE 5
           SCHEDULE 6
           Dictionary


AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback