New South Wales Consolidated Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Download] [Help]

MID-WESTERN REGIONAL LOCAL ENVIRONMENTAL PLAN 2012

- Made under the Environmental Planning and Assessment Act 1979
- As at 1 July 2020
- Reg 374 of 2012

TABLE OF PROVISIONS

   PART 1 - PRELIMINARY

   1.1.    Name of Plan
   1.1AA.  Commencement
   1.2.    Aims of Plan
   1.3.    Land to which Plan applies
   1.4.    Definitions
   1.5.    Notes
   1.6.    Consent authority
   1.7.    Maps
   1.8.    Repeal of planning instruments applying to land
   1.8A.   Savings provision relating to development applications
   1.9.    Application of SEPPs
   1.9A.   Suspension of covenants, agreements and instruments

   PART 2 - PERMITTED OR PROHIBITED DEVELOPMENT

   2.1.    Land use zones
   2.2.    Zoning of land to which Plan applies
   2.3.    Zone objectives and Land Use Table
   2.4.    Unzoned land
   2.5.    Additional permitted uses for particular land
   2.6.    Subdivision--consent requirements
   2.7.    Demolition requires development consent
   2.8.    Temporary use of land
           Land Use Table
           Note
           Zone RU1. Primary Production
           Zone RU3. Forestry
           Zone RU4. Primary Production Small Lots
           Zone RU5. Village
           Zone R1. General Residential
           Zone R2. Low Density Residential
           Zone R3. Medium Density Residential
           Zone R5. Large Lot Residential
           Zone B1. Neighbourhood Centre
           Zone B2. Local Centre
           Zone B3. Commercial Core
           Zone B4. Mixed Use
           Zone B5. Business Development
           Zone IN1. General Industrial
           Zone IN2. Light Industrial
           Zone IN3. Heavy Industrial
           Zone SP1. Special Activities
           Zone SP2. Infrastructure
           Zone SP3. Tourist
           Zone RE1. Public Recreation
           Zone RE2. Private Recreation
           Zone E1. National Parks and Nature Reserves
           Zone E3. Environmental Management

   PART 3 - EXEMPT AND COMPLYING DEVELOPMENT

   3.1.    Exempt development
   3.2.    Complying development
   3.3.    Environmentally sensitive areas excluded

   PART 4 - PRINCIPAL DEVELOPMENT STANDARDS

   4.1.    Minimum subdivision lot size
   4.1AA.  Minimum subdivision lot size for community title schemes
   4.1A.   Minimum lot sizes for dual occupancies, manor houses, multi dwelling housing and residential flat buildings
   4.1B.   Exceptions to minimum lot sizes for certain residential development
   4.1C.   Exception to minimum subdivision lot sizes around Zone B4
   4.1D.   Minimum lot sizes for certain split zones
   4.1E.   Subdivision of land in Zone RU1 for non-agricultural land uses
   4.1F.   Minimum lot sizes for certain land with split minimum lot sizes
   4.2.    Rural subdivision
   4.2A.   Erection of dwelling houses and dual occupancies on land in certain zones
   4.2B.   Dwelling houses on land in Zone RU4 Primary Production Small Lots
   4.2C.   Boundary changes for farm adjustments
   4.3.    Height of buildings
   4.4.    Floor space ratio
   4.5.    Calculation of floor space ratio and site area
   4.6.    Exceptions to development standards

   PART 5 - MISCELLANEOUS PROVISIONS

   5.1.    Relevant acquisition authority
   5.2.    Classification and reclassification of public land
   5.3.    Development near zone boundaries
   5.4.    Controls relating to miscellaneous permissible uses
   5.5.    (Repealed)
   5.6.    Architectural roof features
   5.7.    Development below mean high water mark
   5.8.    Conversion of fire alarms
   5.9.    5.9AA. (Repealed)
   5.10.   Heritage conservation
   5.11.   Bush fire hazard reduction
   5.12.   Infrastructure development and use of existing buildings of the Crown
   5.13.   Eco-tourist facilities
   5.14.   Siding Spring Observatory--maintaining dark sky
   5.15.   Defence communications facility
   5.16.   Subdivision of, or dwellings on, land in certain rural, residential or environment protection zones
   5.17.   Artificial waterbodies in environmentally sensitive areas in areas of operation of irrigation corporations
   5.18.   Intensive livestock agriculture
   5.19.   Pond-based, tank-based and oyster aquaculture

   PART 6 - ADDITIONAL LOCAL PROVISIONS

   6.1.    Salinity
   6.2.    Flood planning
   6.3.    Earthworks
   6.4.    Groundwater vulnerability
   6.5.    Terrestrial biodiversity
   6.6.    Location of sex services premises
   6.7.    Active street frontages
   6.8.    Airspace operations--Mudgee Airport
   6.9.    Essential services
   6.10.   Visually sensitive land near Mudgee
   6.11.   Temporary workers' accommodation
   6.12.   Development in a designated buffer area
   6.13.   Commercial premises on land in Zone B4 and known as Caerleon
   6.14.   Minimum subdivision lot size for community title schemes on certain land in Zone R5
           SCHEDULE 1
           SCHEDULE 2
           SCHEDULE 3
           SCHEDULE 4
           SCHEDULE 5
           SCHEDULE 6
           Dictionary


AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback