(1) Primary and secondary road setbacks The setback of a dwelling house and any attached development from a primary or secondary road must be at least--(a) in the case of a sealed primary road--(i) in Zones RU1, RU2, RU3 and RU6--50m, or(ii) in Zone RU4--30m, or(b) in the case of a sealed secondary road--10m, or(c) in the case of any unsealed road--50m.:
(2) Road setbacks--road widening proposals If the development is on a lot that is subject to a proposed road widening under an environmental planning instrument, a development control plan or section 88B or 195A of the Conveyancing Act 1919 , any road setback of a dwelling house and any attached development must be measured from the proposed boundary with the road.
(3) Classified road setbacks Despite any other setback specified in this clause, a dwelling house and any attached development must have at least the setback from a classified road of--(a) if another environmental planning instrument or a development control plan applying to that lot specifies a setback for those circumstances--the setback specified by the other instrument or the development control plan, or(b) the setback specified by subclause (1),whichever is the greater.
(4) Side setbacks The following buildings must have a minimum setback from a side boundary of 10m--(a) a dwelling house,(b) a carport or garage,(c) a balcony, deck, patio, pergola, terrace or verandah,(d) a cabana, cubby house, garden shed, gazebo, fernery, greenhouse or shed.
(5) Rear setbacks The following buildings on a lot (other than a lot that only has 3 boundaries) must have a minimum setback from the rear boundary of 15m--(a) a dwelling house,(b) a carport or garage,(c) a balcony, deck, patio, pergola, terrace or verandah,(d) a cabana, cubby house, garden shed, gazebo, fernery, greenhouse or shed.
(6) Public reserve setbacks Despite any other setback specified in this clause, a new dwelling house and any attached development must have a setback of at least 3m from a boundary with a public reserve.
(7) Setbacks from watercourses A dwelling house and any attached development must have a setback of at least 40m from the bank of any perennial watercourse identified on a 1:50,000 topographical map published by Spatial Services in the Department of Finance, Services and Innovation.
Note : Clause 3D.14 contains certain exclusions from, and exceptions to, the setbacks in this clause.