New South Wales Consolidated Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Download]
[Help]
WALGETT LOCAL ENVIRONMENTAL PLAN 2013
- Made under the Environmental Planning and Assessment Act 1979
- As at 17 April 2020
- Reg 373 of 2013
TABLE OF PROVISIONS
PART 1 - PRELIMINARY
1.1. Name of Plan
1.1AA. Commencement
1.2. Aims of Plan
1.3. Land to which Plan applies
1.4. Definitions
1.5. Notes
1.6. Consent authority
1.7. Maps
1.8. Repeal of planning instruments applying to land
1.8A. Savings provision relating to development applications
1.9. Application of SEPPs
1.9A. Suspension of covenants, agreements and instruments
PART 2 - PERMITTED OR PROHIBITED DEVELOPMENT
2.1. Land use zones
2.2. Zoning of land to which Plan applies
2.3. Zone objectives and Land Use Table
2.4. Unzoned land
2.5. Additional permitted uses for particular land
2.6. Subdivision--consent requirements
2.7. Demolition requires development consent
2.8. Temporary use of land
Land Use Table
Note
Zone RU1. Primary Production
Zone RU3. Forestry
Zone RU5. Village
Zone R1. General Residential
Zone R5. Large Lot Residential
Zone B2. Local Centre
Zone IN1. General Industrial
Zone SP1. Special Activities
Zone SP2. Infrastructure
Zone SP3. Tourist
Zone RE1. Public Recreation
Zone E1. National Parks and Nature Reserves
Zone E4. Environmental Living
PART 3 - EXEMPT AND COMPLYING DEVELOPMENT
3.1. Exempt development
3.2. Complying development
3.3. Environmentally sensitive areas excluded
PART 4 - PRINCIPAL DEVELOPMENT STANDARDS
4.1. Minimum subdivision lot size
4.1AA. Minimum subdivision lot size for community title schemes
4.1A. Minimum subdivision lot size for strata plan schemes in Zone RU1
4.1B. Minimum subdivision lot sizes for certain split zones
4.1C. Minimum subdivision lot size for certain land at Lightning Ridge
4.2. Rural subdivision
4.2A. Erection of dual occupancies, dwelling houses or secondary dwellings on land in certain rural, residential and environment protection zones
4.2B. Erection of rural workers' dwellings in Zone RU1
4.3. Height of buildings
4.4. Floor space ratio
4.5. Calculation of floor space ratio and site area
4.6. Exceptions to development standards
PART 5 - MISCELLANEOUS PROVISIONS
5.1. Relevant acquisition authority
5.2. Classification and reclassification of public land
5.3. Development near zone boundaries
5.4. Controls relating to miscellaneous permissible uses
5.5. (Repealed)
5.6. Architectural roof features
5.7. Development below mean high water mark
5.8. Conversion of fire alarms
5.9. 5.9AA. (Repealed)
5.10. Heritage conservation
5.11. Bush fire hazard reduction
5.12. Infrastructure development and use of existing buildings of the Crown
5.13. Eco-tourist facilities
5.14. Siding Spring Observatory--maintaining dark sky
5.15. Defence communications facility
5.16. Subdivision of, or dwellings on, land in certain rural, residential or environment protection zones
5.17. Artificial waterbodies in environmentally sensitive areas in areas of operation of irrigation corporations
5.18. Intensive livestock agriculture
5.19. Pond-based, tank-based and oyster aquaculture
PART 6 - ADDITIONAL LOCAL PROVISIONS
6.1. Earthworks
6.2. Flood planning
6.3. Development on river front areas
6.4. Airspace operations
6.5. Development in areas subject to aircraft noise
6.6. Essential services
6.7. Location of sex services premises
6.8. Tourist opal mines
SCHEDULE 1
SCHEDULE 2
SCHEDULE 3
SCHEDULE 4
SCHEDULE 5
SCHEDULE 6
Dictionary
AustLII: Copyright Policy
| Disclaimers
| Privacy Policy
| Feedback