New South Wales Consolidated Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Download]
[Help]
WATER SHARING PLAN FOR THE CENTRAL COAST UNREGULATED WATER SOURCES
2009
- Made under the Water Management Act 2000
- As at 1 July 2019
- Reg 346 of 2009
TABLE OF PROVISIONS
PART 1 - INTRODUCTION
Note
1. Name of this Plan
2. Nature and Status of this Plan
3. Date of commencement
4. Water sources to which this Plan applies
5. Management Zones
6. Amendment of this Part
6A. Extraction management unit for these water sources
6B. Understanding the rules in this Plan
7. Interpretation
PART 2 - VISION, OBJECTIVES, STRATEGIES AND PERFORMANCE INDICATORS
8. Vision, objectives, strategies and performance indicators
9. Vision
9A. Acknowledgement
10. Objectives
11. Strategies
12. Performance indicators
PART 3 - BASIS FOR WATER SHARING
13. Basis for water sharing
14. Climatic variability
15. (Repealed)
16. Flow reference points
17. Flow classes for these water sources
PART 4 - PLANNED ENVIRONMENTAL WATER PROVISIONS
Note
18. General
19. Planned environmental water
20. Access rules for these alluvial sediments
PART 5 - BASIC LANDHOLDER RIGHTS
21. Basic landholder rights
22. Domestic and stock rights
23. Native title rights
24. Harvestable rights
PART 6 - BULK ACCESS REGIME
25. Bulk access regime
PART 7 - REQUIREMENTS FOR WATER UNDER ACCESS LICENCES
26. Requirements for water under access licences
27. Share components of domestic and stock access licences
28. Share components of local water utility access licences
29. Share components of major utility access licences
30. Share components of unregulated river access licences
30A. Share components of aquifer access licences
31. Changes to share components
PART 8 - RULES FOR GRANTING ACCESS LICENCES
32. Rules for granting access licences
32A. Granting of access licences as a result of controlled allocation
PART 9 - LIMITS TO THE AVAILABILITY OF WATER
Division 1 - Long-term average annual extraction limit
33. General
34. (Repealed)
35. Volume of the long-term average annual extraction limits
36. Variation of the long-term average annual extraction limit
37. Assessment of the long-term average annual extraction limit
38. Compliance with the long-term average annual extraction limit
Division 2 - Available water determinations
39. Available water determinations
40. Available water determinations for domestic and stock access licences
41. Available water determinations for local water utility access licences
42. Available water determinations for major utility access licences
43. Available water determinations for unregulated river access licences
43A. Available water determinations for aquifer access licences
PART 10 - RULES FOR MANAGING ACCESS LICENCES
Division 1 - General
44. Rules for managing access licences
Division 2 - Water allocation account management
45. Individual access licence account management rules
Division 3 - Sharing surface water flows on a daily basis
46. Sharing surface water flows on a daily basis
47. Total daily extraction limits
48. Assignment of the TDEL to categories of access licence
49. Unassigned TDEL
50. Granting of unassigned TDEL
51. Individual daily extraction limits for access licences
52. Adjustment to TDELS and IDELs
53. Administrative arrangements for managing access to daily flows (approved groups)
54. Amendments to this Plan for the purpose of sharing of surface water flows on a daily basis
55. Access to the Very Low Flow Class in these Water Sources
PART 11 - ACCESS LICENCE DEALING RULES
56-61. (Repealed)
61A. General
61B. Conversion of access licence to new category
61C. Assignment of rights dealings
61D. Amendment of share components dealings (change of water source)
61E. Amendment of extraction component dealings
61F. Assignment of water allocations dealings
61G. Interstate access licence transfer and assignment of water allocation
61H. Nomination of water supply works dealings
PART 12 - MANDATORY CONDITIONS
Note
Division 1 - General
62. General
Division 2 - Access licences
Note
63. General
Division 3 - Water supply work approvals
Note
64. General
64A. Water supply works authorised to take water from these alluvial sediments
65-68.
PART 13 - RULES FOR GRANTING OR AMENDING WATER SUPPLY WORK APPROVALS
Division 1 - Rules applying to the granting or amending of water supply work approvals for water supply works that take surface water
69. Granting or amending water supply work approvals
70. Runoff Harvesting Dams
71. In river dams
Division 2 - Rules applying to the granting or amending of water supply work approvals for water supply works that take groundwater
71A. General
71B. Rules to minimise interference between water supply works
71C. Rules for water supply works located near contamination sources
71D. Rules for water supply works located near groundwater-dependent ecosystems
71E. Rules for water supply works located near groundwater-dependent culturally significant sites
71F. Replacement groundwater works
Division 3 - Rules for the use of water supply works used to take groundwater
71G. Rules for the use of water supply works located within restricted distances
PART 14 - SYSTEM OPERATION RULES
72. Release rules from local water utility storages
PART 15 - AMENDMENT OF THIS PLAN
73. Amendment of this Plan
74. Review of ongoing monitoring and investigations outcomes
75. Amendment of flow classes, planned environmental water, share components and daily extraction limit provisions
76. Amendments due to floodplain harvesting
77. Amendments for stormwater harvesting
78. Amendments in relation to Schedule 2 (Very Low Flow), Schedule 2A and mandatory conditions
79. Other
SCHEDULE 1
SCHEDULE 2
SCHEDULE 2A
SCHEDULE 3
SCHEDULE 4
SCHEDULE 5
APPENDIX 1
APPENDIX 2
APPENDIX 3
AustLII: Copyright Policy
| Disclaimers
| Privacy Policy
| Feedback