Queensland Consolidated Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Previous] [Next] [Download] [Help]

WORK HEALTH AND SAFETY REGULATION 2011 - REG 225

Scaffolds

225 Scaffolds

(1) This section applies in relation to—
(a) a suspended scaffold; and
(b) a cantilevered scaffold; and
(c) a spur scaffold; and
(d) a hung scaffold; and
(e) any other scaffold from which a person or thing could fall more than 4m.
(2) The person with management or control of a scaffold at a workplace must ensure that the scaffold is not used unless the person receives written confirmation from a competent person that construction of the scaffold has been completed.
Penalty—
Maximum penalty—60 penalty units.
(3) The person with management or control of a scaffold at a workplace must ensure that the scaffold and its supporting structure are inspected by a competent person—
(a) before the scaffold is used; and
(b) before use of the scaffold is resumed after an incident occurs that may reasonably be expected to affect the stability of the scaffold; and
(c) before use of the scaffold is resumed after repairs; and
(d) at least every 30 days.
Penalty—
Maximum penalty—60 penalty units.
(4) If an inspection indicates that a scaffold at a workplace or its supporting structure creates a risk to health or safety, the person with management or control of the scaffold must ensure that—
(a) any necessary repairs, alterations and additions are made or carried out; and
(b) the scaffold and its supporting structure are inspected again by a competent person before use of the scaffold is resumed.
Penalty—
Maximum penalty—60 penalty units.
(5) The person with management or control of a scaffold at a workplace must ensure that unauthorised access to the scaffold is prevented while the scaffold is incomplete or unattended.
Example—
danger tags and other warning signs
Penalty—
Maximum penalty—60 penalty units.



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback