WORK HEALTH AND SAFETY REGULATION 2011 - REG 315E

Risk assessment and control measures for civil construction work and housing construction work

315E Risk assessment and control measures for civil construction work and housing construction work

(1) This section applies to construction work that is—
(a) civil construction work; or
(b) housing construction work.
(2) If a person conducting a business or undertaking uses a control measure—
(a) if the control measure is a hoarding—it must comply with the requirements for a hoarding under section 315F (6) (a) and (b) ; or
(b) if the control measure is perimeter containment screening—it must—
(i) comply with section 315I ; and
(ii) if it is designed to stop objects falling on persons from a level of a structure—be erected along each part of a structure from which an object could fall in the adjoining area during the work; or
(c) if the control measure is a catch platform—it must comply with section 315J ; or
(d) if the control measure is a gantry—it must comply with the requirements for a gantry under section 315K ; or
(e) if the control measure is a closure of the adjoining area—it must be used in compliance with the requirements for a closure under section 315M .
Penalty—
Maximum penalty—60 penalty units.