Queensland Consolidated Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Previous] [Next] [Download] [Help]

WORK HEALTH AND SAFETY REGULATION 2011 - REG 477

Removing friable asbestos

477 Removing friable asbestos

(1) A licensed asbestos removalist removing friable asbestos must ensure, so far as is reasonably practicable, the following—
(a) the asbestos removal area is enclosed to prevent the release of respirable asbestos fibres;
(b) subject to subsection (3) , negative pressure is used;
(c) the wet method of asbestos removal is used;
(d) subject to subsection (3) , the asbestos removal work does not commence until the air monitoring is commenced by a licensed asbestos assessor;
(e) air monitoring is undertaken during the asbestos removal work, at times decided by the independent licensed asbestos assessor undertaking the monitoring;
(f) any glove bag used to enclose the asbestos removal area is dismantled and disposed of safely.
Penalty—
Maximum penalty—60 penalty units.
(2) A licensed asbestos removalist must ensure that any enclosure used in removing friable asbestos is tested for leaks.
Penalty—
Maximum penalty—60 penalty units.
(3) Subsections (1) (b) and (1) (d) do not apply if glove bags are used in the class A asbestos removal work.
(4) The licensed removalist must not dismantle an enclosure for a friable asbestos removal area until the removalist receives results of air monitoring, showing that the recorded respirable asbestos fibre level within the enclosure is below 0.01 fibres/ml, from—
(a) if the friable asbestos is removed from domestic premises—the licensed asbestos assessor who undertook the air monitoring; or
(b) in any other case—the person who commissioned the class A asbestos removal work.
Penalty—
Maximum penalty—60 penalty units.
(5) The licensed removalist must ensure that an enclosure for a friable asbestos removal area is dismantled in a way that, so far as is reasonably practicable, eliminates the release of respirable asbestos fibre.
Penalty—
Maximum penalty—60 penalty units.
(6) The person who commissioned the removal of the friable asbestos must obtain a clearance certificate from a licensed asbestos assessor after the enclosure for the friable asbestos removal area has been dismantled.
Penalty—
Maximum penalty for subsection (6) —60 penalty units.