WORK HEALTH AND SAFETY REGULATIONS 2012 - REG 301

301—Safe work method statement—copy to be given to principal contractor

A person conducting a business or undertaking that includes carrying out high risk construction work in connection with a construction project must, before the high risk construction work commences, ensure that a copy of the safe work method statement for the work is given to the principal contractor.

Maximum penalty:

            (a)         In the case of an individual—$3 600.

            (b)         In the case of a body corporate—$18 000.

Expiation fee:

            (a)         In the case of an individual—$432

            (b)         In the case of a body corporate—$2 160.