(1) The design of every stormwater drainage system to the point of discharge on an allotment must be approved by the relevant building surveyor.
(2) The report of the relevant council indicating the location of the point of discharge from an allotment either within the allotment or at the allotment boundary must be obtained in relation to an application for a building permit for the carrying out of building work that includes a stormwater drainage system.