ALUMINA REFINERY (MITCHELL PLATEAU) AGREEMENT (TERMINATION) BILL 2015

                      Western Australia


Alumina Refinery (Mitchell Plateau) Agreement
          (Termination) Bill 2015

                          Contents

        Part 1 -- Preliminary
   1.   Short title                                                  2
   2.   Commencement                                                 2
        Part 2 -- Alumina Refinery (Mitchell
             Plateau) Agreement Act 1971
             amended
   3.   Act amended                                                  3
   4.   Long title amended                                           3
   5.   Section 2 amended                                            3
   6.   Section 4 replaced                                           4
        4.       Ratification and operation of termination
                 agreement                                     4
        5A.      Cancellation of Temporary Reserve
                 5610H                                         4
        5B.      Termination of pending applications in
                 respect of Mitchell Plateau area              4
        5C.      Temporary prohibition on tenement
                 applications in respect of Mitchell Plateau
                 area                                          4
   7.   Fourth and Fifth Schedules inserted                          6
        Fourth Schedule -- Termination agreement
        Fifth Schedule -- Mitchell Plateau area
        Division 1 -- Description
        1.        Mitchell Plateau area                        14




                             113--1                                  page i
Alumina Refinery (Mitchell Plateau) Agreement (Termination) Bill 2015



Contents



              Division 2 -- Map
              Division 3 -- Coordinates

              Part 3 -- Mining Act 1978 amended
      8.      Act amended                                           20
      9.      Section 6 amended                                     20




page ii
                           Western Australia


                     LEGISLATIVE ASSEMBLY


Alumina Refinery (Mitchell Plateau) Agreement
          (Termination) Bill 2015

                               A Bill for


An Act to amend the Alumina Refinery (Mitchell Plateau) Agreement
Act 1971 to provide for the ratification of an agreement for the
termination of the Alumina Refinery (Mitchell Plateau) Agreement
and to provide for related matters, and to consequentially amend the
Mining Act 1978.



The Parliament of Western Australia enacts as follows:




                                                              page 1
    Alumina Refinery (Mitchell Plateau) Agreement (Termination) Bill 2015
    Part 1         Preliminary

    s. 1



1                          Part 1 -- Preliminary
2   1.       Short title
3            This is the Alumina Refinery (Mitchell Plateau) Agreement
4            (Termination) Act 2015.

5   2.       Commencement
6            This Act comes into operation as follows --
7             (a) Part 1 -- on the day on which this Act receives the
8                   Royal Assent;
9             (b) the rest of the Act -- on the day after that day.




    page 2
          Alumina Refinery (Mitchell Plateau) Agreement (Termination) Bill 2015
           Alumina Refinery (Mitchell Plateau) Agreement Act 1971        Part 2
                                                        amended

                                                                           s. 3


1          Part 2 -- Alumina Refinery (Mitchell Plateau)
2                  Agreement Act 1971 amended
3    3.       Act amended
4             This Part amends the Alumina Refinery (Mitchell Plateau)
5             Agreement Act 1971.

6    4.       Long title amended
7             In the long title delete "effect;" and insert:
8

9             effect, to ratify a further agreement for the termination of
10            the Agreement,
11


12   5.       Section 2 amended
13            In section 2 insert in alphabetical order:
14

15                  Mitchell Plateau area has the meaning given in the
16                  Fifth Schedule clause 1;
17                  pending application means a tenement application
18                  made, but not determined, under the Mining Act 1978
19                  before the day on which the Alumina Refinery
20                  (Mitchell Plateau) Agreement (Termination) Act 2015
21                  section 6 comes into operation;
22                  Temporary Reserve 5610H means the reserve of that
23                  designation created under the Mining Act 1904 and
24                  continued under the Mining Act 1978;
25                  tenement application means an application for a
26                  mining tenement under the Mining Act 1978;
27                  termination agreement means the agreement a copy of
28                  which is set out in the Fourth Schedule;
29




                                                                        page 3
     Alumina Refinery (Mitchell Plateau) Agreement (Termination) Bill 2015
     Part 2         Alumina Refinery (Mitchell Plateau) Agreement Act 1971
                    amended

     s. 6


1    6.          Section 4 replaced
2                Delete section 4 and insert:
3


4           4.         Ratification and operation of termination
5                      agreement
6                (1)   The termination agreement is ratified.
7                (2)   Without limiting or otherwise affecting the operation of
8                      the Government Agreements Act 1979, the termination
9                      agreement is to operate and take effect despite any
10                     other Act or law.

11          5A.        Cancellation of Temporary Reserve 5610H
12                     Temporary Reserve 5610H is cancelled by force of this
13                     section.

14          5B.        Termination of pending applications in respect of
15                     Mitchell Plateau area
16               (1)   Each pending application in respect of land wholly or
17                     partly within the Mitchell Plateau area is terminated by
18                     force of this section.
19               (2)   No action, claim or demand lies against the State, the
20                     Minister or any other person in respect of any matter or
21                     thing arising from the termination of a pending
22                     application under this section.

23          5C.        Temporary prohibition on tenement applications in
24                     respect of Mitchell Plateau area
25               (1)   In this section --
26                     relevant area means the Mitchell Plateau area or that
27                     area modified to the extent necessary to reflect any
28                     changes to the boundaries of land contiguous to that
29                     area resulting from survey or cadastral information.


     page 4
     Alumina Refinery (Mitchell Plateau) Agreement (Termination) Bill 2015
      Alumina Refinery (Mitchell Plateau) Agreement Act 1971        Part 2
                                                   amended

                                                                           s. 6


1        (2)   Despite anything in the Mining Act 1978, a tenement
2              application cannot be made during the designated
3              period in respect of land wholly or partly within the
4              Mitchell Plateau area.
5        (3)   For the purposes of subsection (2), the designated
6              period is the period --
7                (a) beginning on the day on which the Alumina
8                      Refinery (Mitchell Plateau) Agreement
9                      (Termination) Act 2015 section 6 comes into
10                     operation; and
11              (b) ending on the day fixed under subsection (4).
12       (4)   When the Minister is satisfied that the relevant area has
13             been reserved under the Land Administration Act 1997
14             Part 4 for the purposes of a national park and classified
15             as a class A reserve under that Part, the Minister must,
16             by notice published in the Gazette, fix a day for the
17             purposes of subsection (3)(b).
18       (5)   The day fixed must be the day after the day on which
19             the notice is published in the Gazette.
20




                                                                    page 5
     Alumina Refinery (Mitchell Plateau) Agreement (Termination) Bill 2015
     Part 2         Alumina Refinery (Mitchell Plateau) Agreement Act 1971
                    amended

     s. 7



1    7.       Fourth and Fifth Schedules inserted
2             After the Third Schedule insert:
3


4               Fourth Schedule -- Termination agreement
5                                                                        [s. 2]
6                                        2015
7


8                THE HONOURABLE COLIN JAMES BARNETT
9             PREMIER OF THE STATE OF WESTERN AUSTRALIA
10


11                                       AND

12


13             MITCHELL PLATEAU BAUXITE CO. PTY. LIMITED
14                          ACN 008 545 499

15


16                      ALCOA OF AUSTRALIA LIMITED
17                             ACN 004 879 298
18
19
20


          ALUMINA REFINERY (MITCHELL PLATEAU) AGREEMENT 1971
                            TERMINATION AGREEMENT

21
22
23
24
25
26                                [Solicitor's details]
27


     page 6
          Alumina Refinery (Mitchell Plateau) Agreement (Termination) Bill 2015
           Alumina Refinery (Mitchell Plateau) Agreement Act 1971        Part 2
                                                        amended

                                                                                s. 7


1    THIS AGREEMENT is made this              20th   day of   February       2015
2    BETWEEN
3    THE HONOURABLE COLIN JAMES BARNETT, MEc., M.L.A.,
4    Premier of the State of Western Australia, acting for and on behalf of the
5    said State and instrumentalities thereof from time to time ("the State") of the
6    one part
7    AND
8    MITCHELL PLATEAU BAUXITE CO. PTY. LIMITED ACN
9    008 545 499 of 123 Albert Street, Brisbane, Queensland and ALCOA OF
10   AUSTRALIA LIMITED ACN 004 879 298 of Corner Davy and Marmion
11   Streets, Booragoon, Western Australia (together called "the Company" in
12   which term shall be included their respective successors and permitted
13   assigns) of the other part.
14   WHEREAS:
15   A.       The State and the Company are now the parties to the agreement
16            dated 17 November 1971 which agreement was ratified by the
17            Agreement Act and subsequently varied or supplemented by
18            agreements dated 31 August 1972, 15 May 1973, 29 October 1985
19            and 29 August 2003, and which agreement as subsequently varied or
20            supplemented is referred to in this Agreement as "the Principal
21            Agreement".
22   B.       The State and the Company wish to terminate the Principal
23            Agreement in the manner and on the terms set out in this Agreement.
24   NOW THIS AGREEMENT WITNESSES:
25   1.       Definitions
26            In this Agreement subject to the context:
27            Agreement Act means the Alumina Refinery (Mitchell Plateau)
28            Agreement Act 1971 (WA).
29            Cape Bougainville Mining Leases means mining leases
30            80/47 - 80/60 (both inclusive).
31            LAA means the Land Administration Act 1997 (WA).
32            Mining Act means the Mining Act 1978 (WA).
33            Operative Date has the meaning given in clause 3(2).

                                                                            page 7
     Alumina Refinery (Mitchell Plateau) Agreement (Termination) Bill 2015
     Part 2         Alumina Refinery (Mitchell Plateau) Agreement Act 1971
                    amended

     s. 7


1             Right of Occupancy means the right of occupancy in respect of the
2             Temporary Reserve referred to in, and renewed pursuant to, the
3             Principal Agreement.
4             Temporary Reserve means Temporary Reserve 5610H.
5             this Agreement, hereof and hereunder refer to this Agreement,
6             whether in its original form or as from time to time added to, varied or
7             amended.
8       2.    Interpretation
9             In this Agreement:
10              (a)   clause headings do not affect interpretation or construction;
11              (b)   words in the singular shall include the plural and words in the
12                    plural shall include the singular according to the requirements
13                    of the context;
14              (c)   one gender includes the other genders;
15              (d)   a covenant or agreement by more than one person binds, and
16                    is enforceable against, those persons jointly and each of them
17                    severally;
18              (e)   a reference to a "person" includes a body corporate;
19              (f)   a reference to an Act includes the amendments to that Act for
20                    the time being in force and also any Act passed in
21                    substitution therefor or in lieu thereof and the regulations for
22                    the time being in force thereunder;
23              (g)   a reference to any document includes that document as from
24                    time to time added to, varied or amended and notwithstanding
25                    any change in the identity of the parties;
26              (h)   a reference to a clause or schedule is a reference to a clause in
27                    or schedule to this Agreement, and a reference to a subclause
28                    or paragraph is a reference to the subclause of the clause or
29                    paragraph of the clause or subclause as the case may be in, or
30                    in relation to, which the reference is made;
31              (h)   a reference to this Agreement includes all recitals, schedules
32                    and annexures; and
33              (i)   "including" means "including, but not limited to".



     page 8
          Alumina Refinery (Mitchell Plateau) Agreement (Termination) Bill 2015
           Alumina Refinery (Mitchell Plateau) Agreement Act 1971        Part 2
                                                        amended

                                                                                s. 7


1    3.       Ratification and operation
2    (1)      This Agreement, other than this clause and clauses 1 and 2, does not
3             come into operation except in accordance with subclause (2).
4    (2)      This Agreement, other than this clause and clauses 1 and 2, comes
5             into operation on the day on which it is ratified by an Act of the
6             Parliament of Western Australia (Operative Date) unless, before that
7             day, it terminates under subclauses (4) or (5).
8    (3)      The State must introduce in the Parliament of Western Australia
9             before 31 March 2015, or a later date agreed between the parties to
10            this Agreement, a Bill to ratify this Agreement and must endeavour to
11            secure its passage as an Act.
12   (4)      If by 31 December 2015 this Agreement has not been ratified by an
13            Act of the Parliament of Western Australia then, unless the parties to
14            this Agreement otherwise agree, this Agreement terminates on that
15            day and no party hereto will have any claim against any other party
16            hereto with respect to any matter or thing arising out of, done,
17            performed, or omitted to be done or performed under this Agreement.
18   (5)      The parties agree that if the Principal Agreement is otherwise
19            determined in accordance with its provisions on a day prior to the
20            Operative Date, then this Agreement shall also terminate on and from
21            that day and no party hereto will have any claim against any other
22            party hereto with respect to any matter or thing arising out of, done,
23            performed, or omitted to be done or performed under this Agreement.
24   4.       Termination of Principal Agreement
25   (1)      Subject to the remainder of this clause, the Principal Agreement is
26            hereby terminated with effect on and from the Operative Date and,
27            except as otherwise provided in this Agreement, neither the State nor
28            the Company shall have any claim against the other with respect to
29            any matter or thing in or arising out of the Principal Agreement.
30   (2)      Notwithstanding subclause (1), but subject to subclause (6), the
31            Company shall remain liable for any antecedent breach or default
32            under the Principal Agreement and in respect of any indemnity given
33            under the Principal Agreement.
34   (3)      Notwithstanding subclause (1):
35              (a)   on and from the Operative Date the Cape Bougainville
36                    Mining Leases shall continue in force only under and, except

                                                                            page 9
     Alumina Refinery (Mitchell Plateau) Agreement (Termination) Bill 2015
     Part 2         Alumina Refinery (Mitchell Plateau) Agreement Act 1971
                    amended

     s. 7


1                      as provided in this subclause, subject to the provisions of the
2                      Mining Act and, for the avoidance of doubt, shall cease to
3                      have the benefit of the rights and privileges conferred by the
4                      Principal Agreement;
5                (b)   in relation to each of the Cape Bougainville Mining Leases,
6                      for the period from and including the Operative Date up to
7                      and including the earlier of:
8                        (i)    the date of expiry of the current term of that mining
9                               lease; and
10                      (ii)    the date on which the companies comprising the
11                              Company at the date of this Agreement cease to hold
12                              greater than a 30% interest in that mining lease
13                              (where such interest may be held individually by one
14                              of those companies or by both of them in the
15                              aggregate),
16                     the holder of that mining lease shall not be required:
17                      (iii)   to comply with the expenditure conditions prescribed
18                              under the Mining Act that are applicable to that
19                              mining lease; or
20                      (iv)    to lodge a Form 5 (operations report-expenditure on
21                              mining tenement) in relation to that mining lease in
22                              compliance with the requirements of the Mining Act;
23                              and
24               (c)   in relation to each of the Cape Bougainville Mining Leases, if
25                     exploration or mining expenditure has been incurred in the
26                     relevant reporting period in relation to that mining lease, the
27                     holder of that mining lease must notwithstanding the
28                     reporting exemption contained in paragraph (b)(iv) file, or
29                     cause to be filed, as the case may be, the mineral exploration
30                     report required by section 115A of the Mining Act in relation
31                     to that mining lease at the times that would otherwise have
32                     been applicable (including whenever required under
33                     section 115A(2)(b)) if such exemption had not been granted,
34             and on application under section 103G of the Mining Act made within
35             3 months after the Operative Date, the State shall cause an
36             endorsement to be made in the register maintained under section 103F


     page 10
      Alumina Refinery (Mitchell Plateau) Agreement (Termination) Bill 2015
       Alumina Refinery (Mitchell Plateau) Agreement Act 1971        Part 2
                                                    amended

                                                                              s. 7


1          of the Mining Act that the provisions of this subclause apply to the
2          Cape Bougainville Mining Leases.
3    (4)   Within 14 days after the Operative Date the Company shall pay to the
4          State an amount of $760,000 to fund rehabilitation and other proposed
5          on-ground activities of the State within the area of land comprised
6          within the Temporary Reserve immediately before the Operative
7          Date.
8    (5)   Subject to subclause (6), on and from the Operative Date the
9          Company will indemnify and keep indemnified the State and the
10         State's employees, agents and contractors in respect of all actions,
11         suits, claims, demands or costs of third parties arising out of or in
12         connection with any work carried out by the Company pursuant to the
13         Principal Agreement or relating to its operations under the Principal
14         Agreement or arising out of or in connection with the construction,
15         maintenance or use by the Company or its employees, agents,
16         contractors, assignees or sublessees of the Company's works or
17         services the subject of the Principal Agreement or the plant, apparatus
18         or equipment installed in connection with the Principal Agreement.
19         This indemnity shall remain in force for a period ending on the date
20         which is 20 years after the Operative Date.
21   (6)   The Company is not liable to indemnify the State and the State's
22         employees, agents and contractors under subclause (5) or under the
23         Principal Agreement (as the case may be):
24           (a)   to the extent that the relevant action, suit, claim, demand or
25                 cost relates to activities or works carried out before the
26                 Operative Date by the State or the State's employees, agents
27                 or contractors (including activities or works funded by the
28                 Company);
29           (b)   to the extent that the relevant action, suit, claim, demand or
30                 cost relates to rehabilitation or other on-ground activities of
31                 the State undertaken after the Operative Date as contemplated
32                 by subclause (4);
33           (c)   to the extent that the relevant action, suit, claim, demand or
34                 cost relates to earthworks or ground disturbances, within the
35                 area of land comprised within the Temporary Reserve
36                 immediately before the Operative Date, relating to



                                                                         page 11
     Alumina Refinery (Mitchell Plateau) Agreement (Termination) Bill 2015
     Part 2         Alumina Refinery (Mitchell Plateau) Agreement Act 1971
                    amended

     s. 7


1                         exploration activities conducted pursuant to the Principal
2                         Agreement; or
3                   (d)   to the extent that the relevant action, suit, claim, demand or
4                         cost relates to third party use after the Operative Date of
5                         works, services, plant, apparatus or equipment constructed,
6                         operated or maintained by the Company within the area of
7                         land comprised within the Temporary Reserve immediately
8                         before the Operative Date, including the airstrip and the
9                         access road.
10          (7)   For the avoidance of doubt a reference to matters or things in, under,
11                pursuant to, conferred by or arising out of or in connection with the
12                Principal Agreement for the purposes of this clause includes matters
13                or things deemed to be so attributed to the Principal Agreement by
14                section 6 of the Agreement Act.
15      5.        Termination of Right of Occupancy
16          (1)   The Right of Occupancy shall be deemed to have been surrendered
17                with effect on and from the Operative Date.
18          (2)   The Company shall remain liable for any antecedent breach or default
19                of the conditions of the Right of Occupancy.
20      6.        Applicable law
21                This Agreement is to be interpreted according to the law for the time
22                being in force in the State of Western Australia.
23
24      EXECUTED as a deed.
25
26
27      SIGNED by THE HONOURABLE                            )
28      COLIN JAMES BARNETT                                 )    [Signature]
29      in the presence of:                                 )
30
31
32      [Signature]
33       Signature of witness
34
35
36      NICOLE JANE HENDERSON
37          Name of witness


     page 12
      Alumina Refinery (Mitchell Plateau) Agreement (Termination) Bill 2015
       Alumina Refinery (Mitchell Plateau) Agreement Act 1971        Part 2
                                                    amended

                                                                       s. 7


1    EXECUTED by MITCHELL PLATEAU                        )
2    BAUXITE CO. PTY. LIMITED                            )
3    ACN 008 545 499 in accordance with                  )
4    section 127(1) of the Corporations Act 2001 (Cth)   )
5
6
7
8
9    [Signature]                          [Signature]
10    Signature of Director               Signature of Secretary
11
12
13
14   PAUL GERARD ARNOLD                   ALFRED PATRICK GRIGG
15   Full Name                            Full Name
16
17
18   EXECUTED by ALCOA OF AUSTRALIA                      )
19   LIMITED ACN 004 879 298 in accordance               )
20   with section 127(1) of the Corporations Act         )
21   2001 (Cth)                                          )
22
23
24
25   [Signature]                          [Signature]
26    Signature of Director               Signature of Secretary
27
28
29
30   SIMON NICOLAS BUTTERWORTH            MELANIE KATHERINE BROWN
31   Full Name                            Full Name




                                                                   page 13
     Alumina Refinery (Mitchell Plateau) Agreement (Termination) Bill 2015
     Part 2         Alumina Refinery (Mitchell Plateau) Agreement Act 1971
                    amended

     s. 7


1                      Fifth Schedule -- Mitchell Plateau area
2                                                                                      [s. 2]

3                                Division 1 -- Description

4           1.         Mitchell Plateau area
5                (1)   In this clause --
6                      high water mark means ordinary high water mark at spring
7                      tides;
8                      point means a point on the surface of the Earth identified by
9                      a number on the map set out in Division 2.
10               (2)   The Mitchell Plateau area is the area of land bounded by --
11                       (a)   the straight line starting at the intersection of the
12                             high water mark and the straight line connecting
13                             points 1 and 2, and ending at point 2; and
14                       (b)   the straight lines connecting points 2 to 38; and
15                       (c)   the straight line starting at point 38 and ending at
16                             the intersection of the high water mark and the
17                             straight line connecting points 38 and 39; and
18                       (d)   the line along the high water mark starting at the
19                             intersection of the high water mark and the straight
20                             line connecting points 38 and 39 and ending at the
21                             intersection of the high water mark and the straight
22                             line connecting points 40 and 41; and
23                       (e)   the straight line starting at the intersection of the
24                             high water mark and the straight line connecting
25                             points 40 and 41, and ending at point 41; and
26                       (f)   the straight lines connecting points 41 to 44; and
27                       (g)   the straight line starting at point 44 and ending at
28                             the intersection of the high water mark and the
29                             straight line connecting points 44 and 45; and
30                       (h)   the line along the high water mark starting at the
31                             intersection of the high water mark and the straight
32                             line connecting points 44 and 45 and ending at the



     page 14
     Alumina Refinery (Mitchell Plateau) Agreement (Termination) Bill 2015
      Alumina Refinery (Mitchell Plateau) Agreement Act 1971        Part 2
                                                   amended

                                                                              s. 7


1                      intersection of the high water mark and the straight
2                      line connecting points 1 and 2.
3        (3)   However, the Mitchell Plateau area does not include the area
4              of land bounded by straight lines connecting points 46, 47,
5              48 and 49, starting at point 46 and ending at that point.
6        (4)   The Mitchell Plateau area is depicted on the map set out in
7              Division 2.
8        (5)   The position of a point is to be determined by reference to
9              the coordinates set out in Division 3 opposite the relevant
10             point number.
11       (6)   The coordinates referred to in subclause (5) are Geocentric
12             Datum of Australia 1994 coordinates.




                                                                       page 15
    Alumina Refinery (Mitchell Plateau) Agreement (Termination) Bill 2015
    Part 2         Alumina Refinery (Mitchell Plateau) Agreement Act 1971
                   amended

    s. 7


1                               Division 2 -- Map




2




    page 16
    Alumina Refinery (Mitchell Plateau) Agreement (Termination) Bill 2015
     Alumina Refinery (Mitchell Plateau) Agreement Act 1971        Part 2
                                                  amended

                                                                     s. 7


1                      Division 3 -- Coordinates

        Point            Latitude                   Longitude

          1           14°35'27.24" S              125°50'44.84" E

          2           14°41'33.24" S              125°50'44.84" E

          3           14°43'11.86" S              125°51'43.34" E

          4           14°43'11.86" S              125°52'50.20" E

          5           14°45'54.54" S              125°52'50.20" E

          6           14°45'54.55" S              125°55'04.55" E

          7           14°48'49.00" S              125°55'04.55" E

          8           14°48'49.00" S              125°56'51.57" E

          9           14°53'09.28" S              125°56'51.58" E

         10           14°53'09.28" S              126°00'52.45" E

         11           14°49'41.05" S              126°00'52.45" E

         12           14°49'41.04" S              126°10'00.00" E

         13           14°55'00.00" S              126°10'00.00" E

         14           14°55'00.00" S              126°08'00.00" E

         15           14°56'58.36" S              126°08'00.00" E

         16           14°56'58.38" S              126°05'34.55" E

         17           15°01'20.19" S              126°05'34.55" E

         18           15°01'20.19" S              126°01'05.17" E



                                                                 page 17
Alumina Refinery (Mitchell Plateau) Agreement (Termination) Bill 2015
Part 2         Alumina Refinery (Mitchell Plateau) Agreement Act 1971
               amended

s. 7


          Point           Latitude                   Longitude

           19          15°06'00.00" S             126°01'05.17" E

           20          15°06'00.00" S             126°00'00.00" E

           21          15°08'19.08" S             126°00'00.00" E

           22          15°08'19.09" S             125°43'43.74" E

           23          14°59'58.66" S             125°43'43.74" E

           24          14°59'58.66" S             125°45'30.86" E

           25          14°55'38.38" S             125°45'30.86" E

           26          14°55'38.38" S             125°47'09.57" E

           27          14°53'24.97" S             125°48'17.01" E

           28          14°53'13.00" S             125°48'11.84" E

           29          14°52'48.63" S             125°46'49.63" E

           30          14°51'48.34" S             125°47'02.22" E

           31          14°50'47.19" S             125°48'26.40" E

           32          14°50'47.19" S             125°43'43.76" E

           33          14°41'37.33" S             125°43'43.75" E

           34          14°41'37.33" S             125°44'50.60" E

           35          14°38'05.84" S             125°44'50.60" E

           36          14°38'05.85" S             125°43'43.77" E

           37          14°35'55.70" S             125°43'43.77" E




page 18
    Alumina Refinery (Mitchell Plateau) Agreement (Termination) Bill 2015
     Alumina Refinery (Mitchell Plateau) Agreement Act 1971        Part 2
                                                  amended

                                                                     s. 7


        Point            Latitude                   Longitude

         38           14°35'55.70" S              125°42'03.54" E

         39           14°31'20.50" S              125°42'03.53" E

         40           14°28'11.87" S              125°46'56.18" E

         41           14°31'35.31" S              125°46'01.21" E

         42           14°31'43.46" S              125°46'33.54" E

         43           14°30'31.09" S              125°46'53.10" E

         44           14°28'40.14" S              125°48'55.22" E

         45           14°28'31.60" S              125°48'56.22" E

         46           14°48'39.88" S              125°50'52.95" E

         47           14°49'44.95" S              125°50'52.95" E

         48           14°49'44.95" S              125°50'19.50" E

         49           14°48'39.88" S              125°50'19.51" E
1




                                                                 page 19
     Alumina Refinery (Mitchell Plateau) Agreement (Termination) Bill 2015
     Part 3         Mining Act 1978 amended

     s. 8



1                    Part 3 -- Mining Act 1978 amended
2    8.        Act amended
3              This Part amends the Mining Act 1978.

4    9.        Section 6 amended
5              After section 6(3) insert:
6

7              (4)    The operation of this Act is subject to the Alumina
8                     Refinery (Mitchell Plateau) Agreement Act 1971
9                     sections 5B and 5C.