Western Australian Current Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Download]
[Help]
HEALTH (TREATMENT OF SEWAGE AND DISPOSAL OF EFFLUENT AND LIQUID
WASTE) REGULATIONS 1974
TABLE OF PROVISIONS
PART 1 -- Preliminary
1. Citation and application
3. Terms used
PART 2 -- General
Division 1 -- Construction and installation of an apparatus
4. Approval of construction or installation of apparatus by local government
4A. Approval of construction or installation of apparatus by Chief Health Officer
5. Documents to accompany application for approval
6. Construction or installation under approval to be completed within certain time
6A. Adoption of codes
7. Construction and installation of apparatus generally
7A. Compliance with adopted Codes
8. Educt and back vents
8A. Location of septic tank
Division 2 -- Use of an apparatus
9. Notice of completion
10. Permit to use apparatus
11. Preparation of apparatus for inspection
12. Testing apparatus
13. Equipment, material, power and labour for inspection
15. Wastes from business or industry
16. Matter interfering with efficient operation of apparatus
16A. Use to comply with adopted Codes
17. Certain matter not to be discharged into apparatus
18. Interfering with apparatus
18A. Structures not to be erected above apparatus
19. Use of damaged or defective apparatus prohibited
Division 3 -- Decommissioning of an apparatus
20. Application
20A. Apparatus to be decommissioned in certain circumstances
21. Decommissioning apparatus
Division 4 -- Review
22. Review of decision of local government
23. Review of decision of Chief Health Officer
PART 3 -- Construction and sizes of septic tanks and sedimentation tanks
24. Minimum water level of septic tank
25. Partition of septic tank
26. Septic tank to be impervious
27. Construction of septic tank generally
28. Liquid capacity of septic tanks on residential premises
29. Size of septic tank
30. Minimum air space in septic tank
31. Dimensions of septic tank
32. Construction of precast concrete septic tank
33. Testing precast concrete septic tank
34. Construction of in situ concrete septic tank
35. Construction of brick septic tank
36. Manufacturer of fibreglass septic tank
PART 4 -- Restricted flush fixtures
38. Minimum flush fixtures and fittings generally
39. Minimum flush fixtures and fittings on any land
40. Certificate of approval of fixtures and fittings
41. Testing closet pan or flushing cistern
42. Restriction on variations
PART 4A -- Maintenance of aerobic treatment units
42A. Owner to ensure arrangements in place for maintenance of unit
42B. Units to be maintained in accordance with standard
42C. Maintenance of units to be carried out by authorised persons
42D. Authorised person to notify new owner of maintenance requirements for unit
PART 5 -- Dry type septic tank
43. Dry type septic tank
44. Area prescribed under Act s. 110
45. Chemical closet pan
PART 6 -- Emptying apparatus
46. Emptying tank or other waste storage component of apparatus
PART 7 -- Disposal of effluent and liquid wastes
47. Receptacles for drainage
48. Receptacles for drainage -- blackwater disposal
49. Requirements for receptacles for drainage
50. Drainage of effluent and liquid wastes
PART 8 -- Manufacturing
51. Marks and brands
52. Wet or steam curing
53. Refusal to sell
PART 9 -- Offences and penalties
54. Offence
SCHEDULE 1 -- Fees
SCHEDULE 3
SCHEDULE 4
SCHEDULE 5
SCHEDULE 6
SCHEDULE 7
SCHEDULE 8
SCHEDULE 9 -- Wastewater volume for residential premises
AustLII: Copyright Policy
| Disclaimers
| Privacy Policy
| Feedback