New South Wales Consolidated Regulations
[Index]
[Table]
[Search]
[Search this Regulation]
[Notes]
[Noteup]
[Download]
[Help]
SUTHERLAND SHIRE LOCAL ENVIRONMENTAL PLAN 2006
- Made under the Environmental Planning and Assessment Act 1979
- As at 10 November 2023
- Reg 669 of 2006
TABLE OF PROVISIONS
PART 1 - PRELIMINARY
1. Name of plan
2. Commencement
3. Aims of plan
4. Land to which plan applies
5. Definitions, notes and maps
6. Consent authority
7. Repeal of other local environmental plans
8. Application of SEPPs and REPs
9. Suspension of covenants and agreements
PART 2 - GENERAL PROVISIONS
10. Zones in this plan
11. Zoning Table
12. Exempt development
13. Complying development
13A. Environmentally sensitive areas excluded
13B. Standards for exempt and complying development
PART 3 - SPECIAL PROVISIONS
Division 1 - Provisions that apply to particular land
14. Exceptions to Zoning Table--specified development on specified land
15. Development in Zone 10--Neighbourhood Centre
16. Development in Zone 17--Environmental Protection (Low Impact Rural)
17. Buildings or works on land traversed by foreshore building line
18. Development in or adjacent to waterways
19. Biodiversity--wetlands
20. Flood planning
21. Environmental risk--bush fire
22. Environmental risk--contaminated land management
23. Environmental risk--acid sulfate soils
24. Environmental risk--nuclear research reactor at Lucas Heights Science and Technology Centre
25. Classification and reclassification of public land
26. Acquisition of land
27. Development on land referred to in clause 26 before acquired or used for purpose for which reserved
Division 2 - Provisions that apply to particular kinds of development
28. Subdivision--consent requirements
29. Crown development and public utilities
30. Maintenance dredging of tidal waterways
31. Development for group homes
32. Seniors housing in Zone 8 or 9
33. Building height
34. Building height--seniors housing in Zone 4, 5 or 6
35. Building density
36. Landscaped area
37. Objectives of clauses 39-42
38. References to area, width and depth of lot in clauses 39-42
39. Minimum size of lot for dwelling houses
40. Dual occupancies--internal lots and lot sizes
41. Villa houses, townhouses and residential flat buildings--internal lots and lot sizes
42. Seniors housing--minimum lot size
43. (Repealed)
44. Convenience stores--maximum floor space
45. Childcare centres--maximum number of children in Zone 1, 2, 4, 5 or 6
46. Telecommunication facilities and electromagnetic radiation emitting facilities and structures
Division 3 - Miscellaneous
47. Temporary use of land
48. Urban design--general
49. Urban design--residential buildings
50. Urban design--non-residential development in residential areas
51. Ecologically sustainable development
52. Energy efficiency and sustainable building techniques
53. Transport accessibility, traffic impacts and car parking
54. Heritage
55. Significant trees or natural landforms
56. Preservation of trees or vegetation
57. Removal of certain vegetation permissible without consent
58. Savings and transitional provisions
58A. Exceptions to development standards
58B. Savings provisions--complying development
58C. Standards that cannot be used to refuse consent--playing and performing music
58D. Public bushland
58E. Canal estate development prohibited
PART 4 - HEATHCOTE RIDGE WEST MENAI SITE
59. Application of Part
60. Interpretation
61. Maps
62. Application of SEPPs
63. Land use zones
64. Objectives of land use zones to be taken into account
65. Zone R2 Low Density Residential
66. Subdivision--consent requirements
67. Minimum subdivision lot size
68. Height of buildings
69. Demolition requires development consent
70. Temporary use of land
71. Interim land use for exhibition and sales office
72. Exceptions to development standards
73. Development near zone boundaries
74. Controls relating to miscellaneous permissible uses
75. Conversion of fire alarms
76. Preservation of trees or vegetation
77. Heritage conservation
78. Bush fire hazard reduction
79. Infrastructure development and use of existing buildings of the Crown
80. (Repealed)
81. Public utility infrastructure
82. Suspension of covenants, agreements and instruments
Schedule 1 (Repealed)
SCHEDULE 2
SCHEDULE 3
SCHEDULE 4
SCHEDULE 5
SCHEDULE 6
Dictionary
AustLII: Copyright Policy
| Disclaimers
| Privacy Policy
| Feedback