South Australian Current Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Previous] [Next] [Download] [Help]

WORK HEALTH AND SAFETY REGULATIONS 2012 - REG 229

229—Record of standards or engineering principles used

        (1)         If the design of plant is required to be registered under Chapter 5 Part 3, the designer of the plant must record any published technical standard, including any part of a published technical standard, that was used to design the plant.

Maximum penalty:

            (a)         In the case of an individual—$1 250.

            (b)         In the case of a body corporate—$6 000.

Expiation fee:

            (a)         In the case of an individual—$144.

            (b)         In the case of a body corporate—$720.

        (2)         If the designer of the plant has not used published technical standards to design the plant, the designer must record any engineering principles used to design the plant.

Maximum penalty:

            (a)         In the case of an individual—$1 250.

            (b)         In the case of a body corporate—$6 000.

Expiation fee:

            (a)         In the case of an individual—$144.

            (b)         In the case of a body corporate—$720.



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback