Commonwealth Consolidated Regulations

[Index] [Table] [Search] [Search this Regulation] [Notes] [Noteup] [Download] [Help]

CORPORATIONS REGULATIONS 2001 - NOTES

- made under the Corporations Act 2001

Statutory Rules No. 193, 2001

Compilation No. 192

Compilation date:                              1 November 2023

Includes amendments up to:            F2023L01458

Registered:                                         28 November 2023

This compilation is in 7 volumes

Volume 1:       regulations 1.0.01-6D.5.03

Volume 2:       regulations 7.1.04-7.6.08E

Volume 3:       regulations 7.7.01-8B.5.20

Volume 4:       regulations 9.1.01-12.9.03

Volume 5:       Schedules 1, 2 and 2A

Volume 6:       Schedules 3-13

Volume 7:       Endnotes

Each volume has its own contents

About this compilation

This compilation

This is a compilation of the Corporations Regulations 2001 that shows the text of the law as amended and in force on 1 November 2023 (the compilation date).

The notes at the end of this compilation (the endnotes) include information about amending laws and the amendment history of provisions of the compiled law.

Uncommenced amendments

The effect of uncommenced amendments is not shown in the text of the compiled law. Any uncommenced amendments affecting the law are accessible on the Register (www.legislation.gov.au). The details of amendments made up to, but not commenced at, the compilation date are underlined in the endnotes. For more information on any uncommenced amendments, see the Register for the compiled law.

Application, saving and transitional provisions for provisions and amendments

If the operation of a provision or amendment of the compiled law is affected by an application, saving or transitional provision that is not included in this compilation, details are included in the endnotes.

Editorial changes

For more information about any editorial changes made in this compilation, see the endnotes.

Modifications

If the compiled law is modified by another law, the compiled law operates as modified but the modification does not amend the text of the law. Accordingly, this compilation does not show the text of the compiled law as modified. For more information on any modifications, see the Register for the compiled law.

Self-repealing provisions

If a provision of the compiled law has been repealed in accordance with a provision of the law, details are included in the endnotes.

  

  

  


Contents

Chapter 1--Introductory                                                                                                                  1

Part 1.0--Miscellaneous                                                                                                                                1

1.0.01.................... Name of Regulations..................................................................................... 1

1.0.02.................... Definitions.................................................................................................... 1

1.0.02AA.............. Meaning of basic deposit product--prescription of prior notice requirement 9

1.0.02AB............... Meaning of prescribed CS facility................................................................. 9

1.0.02A................. Meaning of prescribed financial market..................................................... 10

1.0.02B.................. Proprietary company thresholds (Act s 45A).............................................. 10

1.0.03.................... Prescribed forms (Act s 350)...................................................................... 10

1.0.03A................. Documents that must be in the prescribed form.......................................... 10

1.0.03B.................. Documents that must be lodged with ASIC................................................ 11

1.0.03C.................. Documents that must be in a form approved by ASIC................................ 12

1.0.04.................... Directions and instructions in forms........................................................... 12

1.0.05.................... Documents and information required by forms........................................... 12

1.0.06.................... Annexures accompanying forms................................................................. 13

1.0.07.................... General requirements for documents........................................................... 13

1.0.08.................... Information to accompany financial documents lodged for financial years. 14

1.0.09.................... Information to accompany financial documents etc lodged for half-years... 16

1.0.10.................... Continuous disclosure notices..................................................................... 17

1.0.11.................... Certain documents to be signed by personal representatives etc.................. 17

1.0.12.................... Form of notice of resolution........................................................................ 17

1.0.13.................... Time for lodging documents....................................................................... 17

1.0.14.................... Address of registered office or place of business........................................ 17

1.0.15.................... Affidavits and statements in writing............................................................ 18

1.0.16.................... Certification and verification of certain documents...................................... 18

1.0.17.................... Documents signed or sworn in accordance with the rules of court............. 18

1.0.18.................... Prescribed provisions (Act s 53)................................................................. 18

1.0.20.................... Copies of orders to be lodged..................................................................... 19

1.0.21.................... Identification of lodged orders.................................................................... 19

1.0.22.................... Meaning of this jurisdiction--specification of external Territories for specified provisions of Chapter 7 of the Act.............................................................................................................. 19

Part 1.1--Prescribed amounts                                                                                                                 20

1.1.01.................... Prescribed amounts..................................................................................... 20

Part 1.2--Interpretation                                                                                                                              21

Division 1--General                                                                                                                               21

1.2.01.................... Remuneration recommendations (Act s 9B)................................................ 21

Part 1.2A--Disclosing entities                                                                                                                  22

1.2A.01................. Securities declared not to be ED securities.................................................. 22

1.2A.02................. Foreign companies issuing securities under foreign scrip offers etc exempt from disclosing entity provisions.................................................................................................................... 22

1.2A.03................. Foreign companies issuing securities under employee share scheme exempt from the disclosing entity provisions................................................................................................... 23

Chapter 2A--Registration of companies                                                                       24

Part 2A.1--Size of partnerships or associations (Act s 115(2))                                           24

2A.1.01................. Size of partnerships or associations............................................................ 24

Part 2A.2--Change of place of registration of company (Act s 119A(3))                    25

2A.2.01................. Approval of application for change of place of registration......................... 25

2A.2.02................. Special resolution may be set aside by Court order..................................... 25

2A.2.03................. Application for change of place of registration............................................ 25

2A.2.04................. Change of place of registration.................................................................... 25

Chapter 2B--Basic features of a company                                                                  27

Part 2B.6--Names                                                                                                                                           27

2B.6.01.................. Availability of names (Act s 147)............................................................... 27

2B.6.02.................. Consents required for use of certain letters, words and expressions........... 27

2B.6.02A............... Exemption from requirement to include "Limited" in name......................... 28

2B.6.03.................. Exemptions from requirement to set out name and ACN on certain documents (Act s 155)    28

Chapter 2C--Registers                                                                                                                      29

Part 2C.1--Registers generally                                                                                                               29

Division 2C.1.1--Location of register                                                                                          29

2C.1.01.................. Form of notice............................................................................................. 29

Division 2C.1.2--Right to inspect and get copies of register                                           30

2C.1.02.................. Form of register.......................................................................................... 30

2C.1.03.................. Improper purposes for getting copy of register........................................... 30

2C.1.04.................. Information to be included in application for copy of register..................... 30

Division 2C.1.3--Use of information on registers by bodies corporate                     31

2C.1.05.................. Contact with members after failure to provide copy of register................... 31

Chapter 2D--Officers and employees                                                                               33

Part 2D.2--Restrictions on indemnities, insurance and termination payments        33

Division 2D.2.2--Termination payments                                                                                    33

2D.2.01................. Meaning of base salary.............................................................................. 33

2D.2.02................. Meaning of benefit...................................................................................... 34

2D.2.03................. When benefit given in connection with retirement from an office or a position        35

Part 2D.6--Disqualification from managing corporations                                                    36

Division 2D.6.1--Automatic disqualification (Act s 206B)                                                36

2D.6.01................. Prescribed foreign jurisdictions (Act s 206B(7))........................................ 36

Part 2D.7--Ban on hedging remuneration of key management personnel                 37

2D.7.01................. Hedging arrangements (Act s 206J(3))....................................................... 37

Chapter 2E--Related party transactions                                                                       39

2E.1.01.................. Small amounts given to related entity.......................................................... 39

Chapter 2G--Meetings                                                                                                                      40

Part 2G.2--Meetings of members of companies                                                                          40

Division 6--Proxies and body corporate representatives                                                  40

2G.2.01................. Authentication of appointment of proxy (Act s 250A)................................ 40

Chapter 2K--Charges                                                                                                                       41

Part 2K.2--Registration                                                                                                                              41

2K.2.01.................. Lien or charge on crop or wool, or stock mortgage, that is a registrable security: prescribed law--subsection 262(5) of the Act....................................................................... 41

2K.2.02.................. Time period for the provisional registration of charges............................... 42

2K.2.03.................. Charge that is a registrable security: specified law--paragraphs 273A(4)(b), 273B(3)(b) and 273C(3)(b) of the Act......................................................................................................... 42

Chapter 2L--Debentures                                                                                                                43

Part 2L.2--Duties of borrower                                                                                                               43

2L.2.01.................. Register relating to trustees for debenture holders....................................... 43

Chapter 2M--Financial reports and audit                                                                  44

Part 2M.3--Financial reporting                                                                                                             44

Division 1--Annual financial reports and directors' reports                                           44

2M.3.01................. Disclosures required by notes to consolidated financial statements--annual financial reports (Act s 295).................................................................................................................... 44

2M.3.03................. Prescribed details (Act s 300A).................................................................. 44

2M.3.04................. Prescribed details--annual directors' report of a registrable superannuation entity  52

Part 2M.4--Auditor                                                                                                                                       58

2M.4.01A.............. Membership designations (Act s 324BE)................................................... 58

2M.4.01................. Notice of appointment of auditors............................................................... 58

Part 2M.4A--Annual transparency reports for auditors                                                      59

2M.4A.01.............. Application.................................................................................................. 59

2M.4A.02.............. Content of annual transparency report (Act s 332B)................................... 59

Part 2M.6--Modification of the operation of Chapter 2M of the Act                           60

2M.6.01................. Modifications (Act s 343)........................................................................... 60

2M.6.05................. Conduct of auditor--relevant relationships................................................. 60

Chapter 2N--Updating ASIC information about companies and registered schemes                                                                                                                                                    61

Part 2N.2--Extract of particulars                                                                                                         61

2N.2.01................. Particulars ASIC may require in an extract of particulars (Act s 346B)...... 61

Part 2N.4--Return of particulars                                                                                                         64

2N.4.01................. Particulars ASIC may require in a return of particulars (Act s 348B)......... 64

Chapter 5--External administration                                                                                 67

Part 5.1--Arrangements and reconstructions                                                                               67

5.1.01.................... Prescribed information for paragraph 411(3)(b) and subparagraph 412(1)(a)(ii) of the Act    67

5.1.50.................... Prescribed kinds of contracts, agreements or arrangements under which rights are not subject to the stay in section 415D of the Act.............................................................................. 67

Part 5.2--Receivers, and other controllers, of corporations                                                 68

5.2.01.................... Controller's notice to owner or lessor of property--how given.................. 68

5.2.02.................... Certified copies of reports........................................................................... 68

5.2.50.................... Prescribed kinds of contracts, agreements or arrangements under which rights are not subject to the stay in section 434J of the Act................................................................................ 68

Part 5.3A--Administration of a company's affairs with a view to executing a deed of company arrangement                                                                                                                                    69

5.3A.03A.............. Notice of first meeting of creditors.............................................................. 69

5.3A.05................. Administrator's notice to owner or lessor of property--how given............ 69

5.3A.06................. Provisions included in deed of company arrangement................................ 69

5.3A.06A.............. Notice of resolution to wind up voluntarily................................................. 69

5.3A.07A.............. Notice of appointment of administrator....................................................... 69

5.3A.50................. Prescribed kinds of contracts, agreements or arrangements under which rights are not subject to the stay in section 451E of the Act............................................................................... 70

Part 5.3B--Restructuring of a company                                                                                          75

Division 1--Preliminary                                                                                                                       75

5.3B.01.................. Definitions.................................................................................................. 75

Division 2--Restructuring                                                                                                                   77

Subdivision A--Restructuring generally                                                                                       77

5.3B.02.................. When restructuring ends............................................................................. 77

5.3B.03.................. Eligibility criteria for restructuring.............................................................. 77

5.3B.04.................. Transactions or dealings in the ordinary course of business....................... 78

5.3B.05.................. Consent to transactions or dealings outside the ordinary course of business 78

5.3B.06.................. Termination of restructuring........................................................................ 79

Subdivision B--Restructuring practitioner for company under restructuring                   79

5.3B.07.................. Authority..................................................................................................... 79

5.3B.08.................. Powers of restructuring practitioner for company under restructuring........ 79

5.3B.09.................. Replacement restructuring practitioner must fulfil certain past requirements 80

5.3B.11.................. Protection from liability............................................................................... 80

Subdivision C--Stay on enforcing rights merely because the company is under restructuring etc.          81

5.3B.12.................. Prescribed kinds of contracts, agreements or arrangements under which rights are not subject to the stay in section 454N of the Act.............................................................................. 81

Division 3--Restructuring plan                                                                                                        82

Subdivision A--Preliminary                                                                                                            82

5.3B.13.................. Authority..................................................................................................... 82

Subdivision B--Proposing a restructuring plan                                                                          82

5.3B.14.................. How a restructuring plan is proposed......................................................... 82

5.3B.15.................. Contents of restructuring plan..................................................................... 82

5.3B.16.................. Restructuring proposal statement................................................................ 83

5.3B.17.................. Meaning of proposal period....................................................................... 83

5.3B.18.................. Restructuring practitioner must make declaration in relation to restructuring plan    84

5.3B.19.................. Restructuring practitioner must notify company of defect in restructuring plan       85

5.3B.20.................. Proposal to make restructuring plan lapses................................................. 85

5.3B.21.................. Proposing a restructuring plan to creditors.................................................. 86

5.3B.22.................. Creditors may dispute schedule of debts and claims before restructuring plan is made            87

5.3B.23.................. Creditors may change vote.......................................................................... 89

5.3B.24.................. Company under restructuring must do certain things.................................. 89

Subdivision C--Accepting a proposal for a restructuring plan                                              89

5.3B.25.................. Acceptance of restructuring plan................................................................. 89

5.3B.26.................. How a restructuring plan is made............................................................... 90

5.3B.27.................. Standard terms for restructuring plans........................................................ 91

5.3B.28.................. Parties to restructuring plan......................................................................... 91

5.3B.29.................. Effect of restructuring plan.......................................................................... 91

5.3B.30.................. Protection of company's property from persons bound by restructuring plan 92

5.3B.31.................. When restructuring plan terminates............................................................. 93

5.3B.32.................. Effect of termination or avoidance............................................................... 93

Subdivision D--Restructuring practitioner for a restructuring plan                                    94

5.3B.33.................. Appointment of restructuring practitioner for restructuring plan................. 94

5.3B.34.................. Vacancy in office of restructuring practitioner for restructuring plan.......... 94

5.3B.35.................. Declaration by new and replacement restructuring practitioners--relevant relationships         94

5.3B.36.................. Replacement declarations--relevant relationships....................................... 95

5.3B.37.................. Functions of restructuring practitioner for restructuring plan..................... 96

5.3B.38.................. Replacement restructuring practitioner must lodge outstanding notices etc. 96

5.3B.39.................. When restructuring practitioner may dispose of encumbered property........ 97

5.3B.42.................. Protection from liability............................................................................... 98

5.3B.43.................. Right of indemnity...................................................................................... 98

5.3B.44.................. Right of indemnity has priority over other debts......................................... 98

5.3B.45.................. Lien to secure indemnity........................................................................... 100

Division 4--The restructuring practitioner                                                                             101

5.3B.46.................. Authority................................................................................................... 101

5.3B.47.................. Company must notify restructuring practitioner of certain matters............ 101

Division 5--Information, reports, documents etc.                                                               102

Subdivision A--Preliminary                                                                                                          102

5.3B.48.................. Authority................................................................................................... 102

Subdivision B--Information, reports, documents etc. during restructuring                      102

5.3B.49.................. Declaration by directors--eligibility to be under restructuring and other matters     102

5.3B.50.................. Notice of appointment of restructuring practitioner for company.............. 103

5.3B.51.................. Notice of termination of appointment of restructuring practitioner for company      103

5.3B.52.................. Notice of restructuring plan etc. given to affected creditors....................... 104

5.3B.53.................. Notice of end of restructuring................................................................... 104

Subdivision C--Information, reports, documents etc. once restructuring plan is made 104

5.3B.54.................. Notice of appointment of restructuring practitioner for restructuring plan. 104

5.3B.55.................. Notice of making of restructuring plan...................................................... 104

5.3B.56.................. Notice of contravention of restructuring plan............................................ 105

5.3B.57.................. Notice of termination of restructuring plan................................................ 106

5.3B.58.................. Notice of termination of appointment of restructuring practitioner for restructuring plan         106

Division 6--Powers of Court                                                                                                           108

5.3B.59.................. Authority................................................................................................... 108

5.3B.60.................. Court may make orders in relation to creditor disputes before restructuring plan is made        108

5.3B.61.................. When Court may vary restructuring plan.................................................. 108

5.3B.62.................. When Court may void or validate restructuring plan................................. 109

5.3B.63.................. When Court may terminate restructuring plan........................................... 110

5.3B.64.................. Court may limit rights of secured creditor or owner or lessor................... 110

Division 7--Other matters                                                                                                                112

5.3B.65.................. Approved forms........................................................................................ 112

Part 5.4--Winding up in insolvency                                                                                                  113

5.4.01AAA........... Meaning of statutory minimum and statutory period--prescribed amounts 113

5.4.01.................... Application to Court for winding up--prescribed agency......................... 113

5.4.01A................. Notice of application to wind up a company............................................. 113

5.4.01B.................. Notice of Court-ordered winding up......................................................... 114

5.4.02.................... Compromise of debt by liquidator--prescribed amount............................ 114

Part 5.4C--Winding up by ASIC                                                                                                       115

5.4C.01.................. Notice of intention to order winding up of a company.............................. 115

Part 5.5--Voluntary winding up                                                                                                         116

Division 1--Resolution for winding up                                                                                       116

5.5.01.................... Notice of resolution to wind up voluntarily............................................... 116

Division 2--Simplified liquidation process                                                                                117

Subdivision A--Preliminary                                                                                                          117

5.5.02.................... Declaration about eligibility for simplified liquidation process and other matters     117

5.5.03.................... Eligibility criteria for simplified liquidation process.................................. 117

Subdivision B--Simplified liquidation process                                                                         118

5.5.04.................... Transactions that are not voidable............................................................. 118

5.5.05.................... Reports by liquidator................................................................................. 118

5.5.06.................... Notice of adoption of simplified liquidation process................................. 119

Subdivision C--Ceasing of simplified liquidation process                                                     119

5.5.07.................... Liquidator must cease to follow the simplified liquidation process........... 119

5.5.08.................... Transition from simplified liquidation process.......................................... 120

5.5.09.................... Working out whether the 25% in value of creditors test met..................... 120

Part 5.6--Winding up generally                                                                                                           121

5.6.11.................... Meaning of proof of debt or claim............................................................ 121

5.6.37.................... Establishing title to priority....................................................................... 121

5.6.39.................... Notice to submit particulars of debt or claim............................................. 121

5.6.40.................... Preparation of a proof of debt or claim...................................................... 122

5.6.41.................... Disclosure of security............................................................................... 122

5.6.42.................... Discounts.................................................................................................. 122

5.6.43.................... Periodical payments.................................................................................. 122

5.6.43A................. Debt or claim of uncertain value--appeal to Court.................................... 122

5.6.44.................... Debt discount rate (Act s 554B)................................................................ 123

5.6.45.................... Employees' wages.................................................................................... 123

5.6.46.................... Production of bill of exchange and promissory note................................. 123

5.6.47.................... Admission of debt or claim without formal proof..................................... 123

5.6.48.................... Notice to creditors to submit formal proof................................................ 124

5.6.49.................... Formal proof of debt or claim................................................................... 124

5.6.50.................... Contents of formal proof of debt or claim................................................. 125

5.6.51.................... Costs of proof........................................................................................... 125

5.6.52.................... Liquidator to notify receipt of proof of debt or claim................................ 125

5.6.53.................... Time for liquidator to deal with proofs...................................................... 125

5.6.54.................... Grounds of rejection and notice to creditor............................................... 126

5.6.55.................... Revocation or amendment of decision of liquidator.................................. 126

5.6.56.................... Withdrawal or variation of proof of debt or claim..................................... 127

5.6.57.................... Oaths......................................................................................................... 127

5.6.58.................... Liquidator to make out provisional list of contributories........................... 127

5.6.59.................... Time and place for settlement of list.......................................................... 127

5.6.60.................... Settlement of list of contributories............................................................. 128

5.6.61.................... Supplementary list..................................................................................... 128

5.6.62.................... Notice to contributories............................................................................. 128

5.6.63.................... Dividend payable only on admission of a debt or claim............................ 129

5.6.64.................... Application of regulations 5.6.37 to 5.6.57............................................... 129

5.6.65.................... Liquidator to give notice of intention to declare a dividend....................... 129

5.6.66.................... Time allowed for dealing with formal proof of debt or claim.................... 130

5.6.67.................... Declaration and distribution of dividend................................................... 131

5.6.67A................. Single declaration and distribution of dividend for companies in simplified liquidation           131

5.6.68.................... Rights of creditor who has not proved debt before declaration of dividend 131

5.6.69.................... Postponement of declaration..................................................................... 131

5.6.70.................... Payment of dividend to a person named.................................................... 132

5.6.70A................. Prescribed rate of interest on debts and claims from relevant date to date of payment              132

5.6.70B.................. Notice of disclaimer.................................................................................. 132

5.6.71.................... Distribution of surplus in a winding up by the Court................................ 132

5.6.72.................... Distribution of surplus as directed............................................................ 132

5.6.73.................... Eligible unsecured creditor........................................................................ 133

5.6.74.................... External administration matters--prescribed countries.............................. 133

5.6.75.................... Publication in the prescribed manner......................................................... 133

Part 5.7B--Recovering property or compensation for the benefit of creditors of insolvent company 135

5.7B.01.................. Extension of temporary relief for insolvent trading safe harbour.............. 135

Chapter 5B--Bodies corporate registered as companies, and registrable bodies            136

Part 5B.2--Registrable bodies                                                                                                               136

5B.2.01.................. Certified copies of certificates of incorporation etc.................................... 136

5B.2.02.................. Manner of certifying constituent documents............................................. 136

5B.2.03.................. Manner of sending letters (Act ss 601CC(2) and 601CL(3)).................... 137

5B.2.04.................. Manner of sending notices (Act ss 601CC(3) and 601CL(4)).................. 137

5B.2.05.................. Prescribed countries (Act s 601CDA(a)).................................................. 137

5B.2.06.................. Notices (Act s 601CV(1))......................................................................... 137

Part 5B.3--Names of registrable Australian bodies and foreign companies            138

5B.3.01.................. Availability of names (Act s 601DC)........................................................ 138

5B.3.02.................. Consents required for use of certain letters, words and expressions......... 138

5B.3.03.................. Exemptions from requirement to set out ARBN etc on certain documents (Act s 601DG)      139

5B.3.04.................. Notices (Act s 601DH(1))........................................................................ 139

Chapter 5C--Managed investment schemes                                                            140

Part 5C.1--Registration of managed investment schemes                                                   140

5C.1.01.................. Applying for registration........................................................................... 140

5C.1.02.................. Change of name of registered schemes..................................................... 140

5C.1.03.................. Modification (Act s 601QB)..................................................................... 141

Part 5C.2--The responsible entity                                                                                                      142

5C.2.01.................. Duty of responsible entities' agents--surveillance checks........................ 142

5C.2.02.................. Appointment of temporary responsible entities......................................... 142

5C.2.03.................. Form of notices (Act ss 601FL(2) and 601FM(2))................................... 142

5C.2.04.................. Notice of appointment of temporary responsible entities........................... 142

5C.2.05.................. Form of notices (Act s 601FP(3))............................................................. 142

Part 5C.4--The compliance plan                                                                                                         143

5C.4.01.................. Agents' authorities to be lodged................................................................ 143

5C.4.02.................. Agents to assist auditors of compliance plans........................................... 143

Part 5C.5--The compliance committee                                                                                            144

5C.5.01.................. Responsible entities etc to assist compliance committees.......................... 144

Part 5C.9--Winding up                                                                                                                             145

5C.9.01.................. Notice of commencement of winding up................................................... 145

Part 5C.11--Exemptions and modifications                                                                                 146

Division 1--Exemptions                                                                                                                      146

5C.11.01................ Certain schemes not managed investment schemes................................... 146

Division 2--Modifications                                                                                                                 149

5C.11.02................ Modifications............................................................................................ 149

5C.11.03................ Register of members of registered schemes (Act s 169(1))....................... 149

5C.11.03A............. How to work out the value of an interest.................................................. 149

5C.11.04................ Names of registered schemes (Act s 601EB(1))....................................... 149

5C.11.05A............. Schemes not required to be registered (Act s 601ED)............................... 149

5C.11.06................ Liability of responsible entities (Act s 601FB(4))..................................... 149

Chapter 5D--Licensed trustee companies                                                                   150

Part 5D.1--Preliminary                                                                                                                             150

5D.1.01................. Prescribed requirements for publication.................................................... 150

5D.1.01A.............. Meaning of trustee company..................................................................... 150

5D.1.02................. Meaning of traditional trustee company services and estate management functions               150

5D.1.03................. Meaning of mortgage-backed security...................................................... 152

5D.1.04................. Interaction between trustee company provisions and State and Territory laws 153

Part 5D.2--Powers etc of licensed trustee companies                                                             154

Division 2.1--Annual Information Returns                                                                             154

5D.2.01................. Obligation on licensed trustee company to provide an annual information return if requested 154

5D.2.02................. Information to be included in annual information return........................... 155

Division 2.2--Common funds                                                                                                          156

5D.2.03................. Common funds......................................................................................... 156

5D.2.04................. Establishment of common funds............................................................... 156

5D.2.05................. Deciding details about common funds...................................................... 156

5D.2.06................. Operation of common funds..................................................................... 157

5D.2.07................. Register of investments............................................................................. 159

5D.2.08................. Financial reports........................................................................................ 160

Part 5D.3--Regulation of fees charged by licensed trustee companies                        162

5D.3.01................. Modification of section 601TAB of the Act: disclosure to clients of changed fees  162

Part 5D.4--Obligations of receiving company after transfer                                            163

5D.4.01................. Preserving rights under dispute resolution systems and arrangements for compensation        163

Chapter 6--Takeovers                                                                                                                     164

Part 6.2--Exceptions to the prohibition                                                                                          164

6.2.01A................. Prescribed requirements............................................................................ 164

6.2.01.................... Prescribed circumstances (Act s 611)....................................................... 164

6.2.02.................... Other prescribed circumstances (Act s 611).............................................. 165

Part 6.6 --Variation of offers                                                                                                                166

6.6.01.................... Right to withdraw acceptance.................................................................... 166

Part 6.8 --Acceptances                                                                                                                               167

6.8.01.................... Acceptance of offers made under off-market bid...................................... 167

6.8.02.................... Acceptances by transferees and nominees of offers made under off-market bid      167

Part 6.10--Review and intervention                                                                                                  168

6.10.01.................. Application for review of Takeovers Panel decision................................. 168

Chapter 6A--Compulsory acquisitions and buy-outs                                   169

Part 6A.1 --Compulsory acquisitions and buy-outs after takeover bid                      169

6A.1.01................. Terms on which securities to be acquired.................................................. 169

Chapter 6CA--Continuous disclosure                                                                           170

6CA.1.01............... Continuous disclosure: other disclosing entities........................................ 170

Chapter 6D--Fundraising                                                                                                           171

Part 6D.2--Disclosure to investors about securities                                                                 171

6D.2.01................. Exemption--member shares..................................................................... 171

6D.2.02................. Exemption--foreign companies................................................................ 171

6D.2.03................. Sophisticated investors.............................................................................. 171

6D.2.04................. Simple corporate bonds--base prospectus................................................ 171

6D.2.05................. Simple corporate bonds--offer-specific prospectus.................................. 174

6D.2.06................. Simple corporate bonds--key financial ratios relevant to issuing body.... 176

Part 6D.3A--Crowd-sourced funding                                                                                             178

6D.3A.01.............. Offers that are eligible to be made under Part 6D.3A of the Act............... 178

6D.3A.02.............. Contents of CSF offer document--general............................................... 178

6D.3A.03.............. Contents of CSF offer document--Section 1: Risk warnings................... 179

6D.3A.04.............. Contents of CSF offer document--Section 2: Information about the offering company          179

6D.3A.05.............. Contents of CSF offer document--Section 3: Information about the offer 181

6D.3A.06.............. Contents of CSF offer document--Section 4: Information about investor rights     182

6D.3A.07.............. Obligation of CSF intermediary relating to their platforms--applicant risk acknowledgement                183

6D.3A.08.............. Gatekeeper obligation of CSF intermediary--checks................................ 184

6D.3A.09.............. Gatekeeper obligation of CSF intermediary--reasonable standard of checks 184

6D.3A.10.............. Obligation of CSF intermediary relating to their platforms--general CSF risk warning          185

Part 6D.5--Fundraising--miscellaneous                                                                                        187

6D.5.01................. Warrants that are securities........................................................................ 187

6D.5.02................. Modification of paragraph 708(8)(c) of the Act: renewal period for accountants' certificates  187

6D.5.03................. Modification of section 738X of the Act: requirement to notify right to withdraw application only applies if defect is materially adverse........................................................................ 187


Note about these Regulations

These Regulations are made under the Corporations Act 2001. To assist users of these Regulations, these Regulations follow, as far as possible, the drafting style, structure and numbering of the Corporations Regulations 1990 that were made under the Corporations Act 1989. Because some provisions of the Corporations Regulations 1990 are not remade in these Regulations, some gaps appear in the numbering of these Regulations. Also, the drafting style departs in minor ways from that used in the Corporations Regulations 1990.

  

Endnotes

Endnote 1--About the endnotes

The endnotes provide information about this compilation and the compiled law.

The following endnotes are included in every compilation:

Endnote 1--About the endnotes

Endnote 2--Abbreviation key

Endnote 3--Legislation history

Endnote 4--Amendment history

Abbreviation key--Endnote 2

The abbreviation key sets out abbreviations that may be used in the endnotes.

Legislation history and amendment history--Endnotes 3 and 4

Amending laws are annotated in the legislation history and amendment history.

The legislation history in endnote 3 provides information about each law that has amended (or will amend) the compiled law. The information includes commencement details for amending laws and details of any application, saving or transitional provisions that are not included in this compilation.

The amendment history in endnote 4 provides information about amendments at the provision (generally section or equivalent) level. It also includes information about any provision of the compiled law that has been repealed in accordance with a provision of the law.

Editorial changes

The Legislation Act 2003 authorises First Parliamentary Counsel to make editorial and presentational changes to a compiled law in preparing a compilation of the law for registration. The changes must not change the effect of the law. Editorial changes take effect from the compilation registration date.

If the compilation includes editorial changes, the endnotes include a brief outline of the changes in general terms. Full details of any changes can be obtained from the Office of Parliamentary Counsel.

Misdescribed amendments

A misdescribed amendment is an amendment that does not accurately describe how an amendment is to be made. If, despite the misdescription, the amendment can be given effect as intended, then the misdescribed amendment can be incorporated through an editorial change made under section 15V of the Legislation Act 2003.

If a misdescribed amendment cannot be given effect as intended, the amendment is not incorporated and "(md not incorp)" is added to the amendment history.

 

Endnote 2--Abbreviation key

 

ad = added or inserted

o = order(s)

am = amended

Ord = Ordinance

amdt = amendment

orig = original

c = clause(s)

par = paragraph(s)/subparagraph(s)

C[x] = Compilation No. x

/sub-subparagraph(s)

Ch = Chapter(s)

pres = present

def = definition(s)

prev = previous

Dict = Dictionary

(prev ... ) = previously

disallowed = disallowed by Parliament

Pt = Part(s)

Div = Division(s)

r = regulation(s)/rule(s)

ed = editorial change

reloc = relocated

exp = expires/expired or ceases/ceased to have

renum = renumbered

effect

rep = repealed

F = Federal Register of Legislation

rs = repealed and substituted

gaz = gazette

s = section(s)/subsection(s)

LA = Legislation Act 2003

Sch = Schedule(s)

LIA = Legislative Instruments Act 2003

Sdiv = Subdivision(s)

(md) = misdescribed amendment can be given

SLI = Select Legislative Instrument

effect

SR = Statutory Rules

(md not incorp) = misdescribed amendment

Sub-Ch = Sub-Chapter(s)

cannot be given effect

SubPt = Subpart(s)

mod = modified/modification

underlining = whole or part not

No. = Number(s)

commenced or to be commenced

 

Endnote 3--Legislation history

 

Number and year

FRLI registration or gazettal

Commencement

Application, saving and transitional provisions

193, 2001

13 July 2001

15 July 2001 (r 1.0.01A)

 

208, 2001

2 Aug 2001

15 July 2001

--

318, 2001

15 Oct 2001

15 Oct 2001

--

319, 2001

15 Oct 2001

11 Mar 2002 (r 2)
Note: r 7.9.10 and 7.9.11 of Sch 1 (item 15) were disallowed by the Senate on 16 Sept 2002

--

15, 2002

21 Feb 2002

21 Feb 2002

--

16, 2002

21 Feb 2002

r 1-3 and Sch 1: 12:01 am (A.C.T.) 11 Mar 2002 (r 2(1))
Remainder: 28 Dec 2002 (r 2(2))
Note: r 7.9.10, 7.9.11(1), 7.9.11(1)(a), 7.9.11(1)(b) and 7.9.11(2) of Sch 1 (items 78-82) were disallowed by the Senate on 16 Sept 2002

--

41, 2002

7 Mar 2002

r 1-3 and Sch 1: 12:02 am (A.C.T.) 11 Mar 2002 (r 2(1))
Remainder: 12:01 am (A.C.T.) 28 Dec 2002 (r 2(2))

--

53, 2002

22 Mar 2002

r 1-3 and Sch 1: 12:01 am (A.C.T.) 11 Mar 2002 (r 2(a))
Remainder: 12:03 am (A.C.T.) 11 Mar 2002 (r 2(b))

--

126, 2002

14 June 2002

r 1-3 and Sch 1: 12:02 am 11 Mar 2002 (r 2(a))
Sch 2: 12:03 am 11 Mar 2002 (r 2(b))
Remainder: 14 June 2002 (r 2(c))

--

145, 2002

27 June 2002

r 1-3 and Sch 1: 27 June 2002
Remainder: 1 July 2002

--

182, 2002

1 Aug 2002

1 Aug 2002

--

265, 2002

6 Nov 2002

6 Nov 2002

--

282, 2002

28 Nov 2002

1 Dec 2002

--

31, 2003

11 Mar 2003

11 Mar 2003

--

48, 2003

8 Apr 2003

8 Apr 2003

--

85, 2003

8 May 2003

8 May 2003

--

126, 2003

19 June 2003

19 June 2003

--

127, 2003

19 June 2003

1 July 2003

--

194, 2003

31 July 2003

1 Aug 2003

--

202, 2003

6 Aug 2003

r 1-3 and Sch 1: 6 Aug 2003
Remainder: 11 Mar 2004

--

282, 2003

13 Nov 2003

r 1-3 and Sch 1: 13 Nov 2003 (r 2(a))
Sch 2: 11 Mar 2004 (r 2(b))
Remainder: 1 July 2004 (r 2(c))
Note: Sch 3 (items 1-4, 6, 8, 9) were disallowed by the Senate on 24 Mar 2004; rescinded 13 May 2004

r 4

367, 2003

23 Dec 2003

23 Dec 2003

--

368, 2003

23 Dec 2003

r 1-3 and Sch 1: 23 Dec 2003
Remainder: 11 Mar 2004

--

369, 2003

23 Dec 2003

r 1-3 and Sch 1: 23 Dec 2003
Remainder: 14 Jan 2004 (see r. 2)

--

10, 2004

20 Feb 2004

1 July 2004

--

25, 2004

26 Feb 2004

26 Feb 2004

--

26, 2004

26 Feb 2004

r 1-3 and Sch 1: 26 Feb 2004
Remainder: 11 Mar 2004

--

36, 2004

18 Mar 2004

18 Mar 2004

--

145, 2004

25 June 2004

r 1-3 and Sch 1: 1 July 2004
Remainder: 1 Oct 2004

r 4

149, 2004

25 June 2004

r 1-3 and Sch 1: 1 July 2004
Remainder: 1 Jan 2005

--

208, 2004

9 July 2004

9 July 2004

--

398, 2004

23 Dec 2004

23 Dec 2004

--

399, 2004

23 Dec 2004

r 1-3 and Sch 1: 23 Dec 2004
Remainder: 1 Jan 2005

--

31, 2005

10 Mar 2005 (F2005L00539)

r 1-3 and Sch 1 and 2: 11 Mar 2005
Remainder: 1 July 2005

--

38, 2005

24 Mar 2005 (F2005L00717)

31 Mar 2005

r 4

139, 2005

17 June 2005 (F2005L01453)

18 June 2005

--

160, 2005

8 July 2005 (F2005L01926)

9 July 2005

--

324, 2005

19 Dec 2005 (F2005L04022)

20 Dec 2005 (r 2)

Sch 2 (item 5), Sch 5 (item 2) and Sch 10 (item 8)

41, 2006

16 Feb 2006 (F2006L00547)

17 Feb 2006

--

57, 2006

22 Mar 2006 (F2006L00802)

23 Mar 2006

--

102, 2006

10 May 2006 (F2006L01444)

11 May 2006

--

126, 2006

2 June 2006 (F2006L01617)

3 June 2006

--

362, 2006

14 Dec 2006 (F2006L03961)

15 Dec 2006

--

102, 2007

27 Apr 2007 (F2007L01122)

1 July 2007

--

193, 2007

29 June 2007 (F2007L01900)

30 June 2007

r 3

194, 2007

29 June 2007 (F2007L01904)

30 June 2007

--

195, 2007

29 June 2007 (F2007L01901)

1 July 2007

--

196, 2007

29 June 2007 (F2007L01903)

1 July 2007

--

197, 2007

29 June 2007 (F2007L01889)

1 July 2007

--

198, 2007

29 June 2007 (F2007L01899)

r 1-3 and Sch 1: 1 July 2007
Remainder: 1 Sept 2007 (r 2(b))

--

199, 2007

29 June 2007 (F2007L01898)

1 Sept 2007 (r 2)

--

227, 2007

24 July 2007 (F2007L02255)

25 July 2007 (r 2)

--

259, 2007

24 Aug 2007 (F2007L02637)

25 Aug 2007

--

323, 2007

28 Sept 2007 (F2007L03801)

29 Sept 2007

--

324, 2007

28 Sept 2007 (F2007L03804)

r 1-3 and Sch 1: 29 Sept 2007
Schedule 2: 28 Dec 2007 (r. 2(b))
Remainder: 1 July 2008 (r. 2(c))

--

325, 2007

28 Sept 2007 (F2007L03851)

31 Dec 2007 (. 2)

r 4

364, 2007

18 Dec 2007 (F2007L04728)

19 Dec 2007

--

93, 2008

3 June 2008 (F2008L01830)

4 June 2008

--

94, 2008

3 June 2008 (F2008L01827)

13 June 2008 (r 2)

--

130, 2008

26 June 2008 (F2008L02184)

1 July 2008

--

158, 2008

18 July 2008 (F2008L02510)

19 July 2008

--

194, 2008

19 Sept 2008 (F2008L03458)

20 Sept 2008

--

12, 2009

6 Feb 2009 (F2009L00288)

7 Feb 2009

--

51, 2009

30 Mar 2009 (F2009L01178)

31 Mar 2009

--

52, 2009

30 Mar 2009 (F2009L01169)

1 July 2009

--

70, 2009

1 May 2009 (F2009L01627)

2 May 2009

--

103, 2009

5 June 2009 (F2009L02167)

6 June 2009

--

175, 2009

10 July 2009 (F2009L02719)

11 July 2009

--

198, 2009

3 Aug 2009 (F2009L02988)

4 Aug 2009

--

327, 2009

27 Nov 2009 (F2009L04316)

r 4 and Sch 2: 1 Apr 2010 (r 2(1)(b))
Remainder: 11 Dec 2009 (r 2(1)(a))

--

328, 2009

27 Nov 2009 (F2009L04307)

28 Nov 2009 (r 2)

--

386, 2009

16 Dec 2009 (F2009L04494)

17 Dec 2009 (r 2)

--

387, 2009

16 Dec 2009 (F2009L04516)

17 Dec 2009 (r 2)

--

54, 2010

25 Mar 2010 (F2010L00737)

26 Mar 2010 (r 2)

--

55, 2010

25 Mar 2010 (F2010L00738)

Sch 2: 12 Oct 2011 (r 2(b))
Remainder: 18 Apr 2010 (r 2(a))

--

88, 2010

6 May 2010 (F2010L01097)

r 7 and Sch 2: 1 July 2010 (r 2(b))
Remainder: 6 May 2010 (r 2(a))

r 4-7

as amended by

 

 

 

41, 2012

12 Apr 2012 (F2012L00836)

6 May 2010 (r 2)

--

266, 2012

23 Nov 2012 (F2012L02245)

24 Nov 2012 (r 2)

--

89, 2010

10 May 2010 (F2010L01198)

1 Jan 2011 (r 2)

--

135, 2010

21 June 2010 (F2010L01585)

22 June 2010 (r 2)

r 4

as amended by

 

 

 

274, 2011

9 Dec 2011 (F2011L02616)

10 Dec 2011 (r 2)

--

184, 2010

30 June 2010 (F2010L01799)

28 June 2010 (r 2)

--

210, 2010

12 July 2010 (F2010L01941)

1 Aug 2010 (r 2)

--

272, 2010

27 Oct 2010 (F2010L02820)

28 Oct 2010 (r 2)

--

301, 2010

25 Nov 2010 (F2010L03094)

26 Nov 2010 (r 2)

--

332, 2010

10 Dec 2010 (F2010L03186)

13 Dec 2010 (r 2 and F2010L03188)

--

66, 2011

13 May 2011 (F2011L00753)

26 May 2011 (r 2)

r 4

128, 2011

30 June 2011 (F2011L01368)

1 July 2011 (r 2)

--

142, 2011

1 Aug 2011 (F2011L01577)

2 Aug 2011 (r 2)

--

193, 2011

21 Oct 2011 (F2011L02103)

Sch 1: 31 Oct 2011 (r 2)

--

272, 2011

9 Dec 2011 (F2011L02621)

10 Dec 2011 (r 2)

r 4

274, 2011

9 Dec 2011 (F2011L02616)

Sch 2: 10 Dec 2011 (r 2)

--

42, 2012

11 Apr 2012 (F2012L00826)

12 Apr 2012 (s 2)

--

43, 2012

11 Apr 2012 (F2012L00829)

Sch 2: 12 Apr 2012
Remainder: 13 Apr 2011 (s 2(a))

--

46, 2012

11 Apr 2012 (F2012L00831)

12 Apr 2012 (s 2)

--

114, 2012

20 June 2012 (F2012L01272)

Sch 1: 1 July 2012 (s 2(b) and F2012L01239)

--

170, 2012

12 July 2012 (F2012L01545)

13 July 2012 (s 2)

--

171, 2012

13 July 2012 (F2012L01548)

25 July 2012 (s 2)

--

172, 2012

13 July 2012 (F2012L01549)

12 July 2013 (s 2)

 

as amended by

 

 

 

308, 2012

11 Dec 2012 (F2012L02414)

12 Dec 2012 (s 2)

--

233, 2012

28 Sept (F2012L01981)

29 Sept 2012 (s 2)

--

234, 2012

2 Oct 2012 (F2012L01989)

3 Oct 2012 (s 2)

--

247, 2012

30 Oct 2012 (F2012L02102)

1 Nov 2012 (s 2)

--

267, 2012

23 Nov 2012 (F2012L02235)

24 Nov 2012 (s 2)

--

268, 2012

26 Nov 2012 (F2012L02261)

Sch 2: 1 July 2013 (s 2(b))
Remainder: 27 Nov 2012 (s 2(a))

--

25, 2013

1 Mar 2013 (F2013L00385)

Sch 2: 1 Mar 2013 (s 2)

--

26, 2013

21 Mar 2013 (F2013L00395)

Sch 1: 1 July 2013 (s 2(1) item 2)

--

59, 2013

29 Apr 2013 (F2013L00696)

30 Apr 2013 (s 2)

--

83, 2013

16 May 2013 (F2013L00780)

1 July 2013 (s 2)

--

101, 2013

4 June 2013 (F2013L00905)

Sch 2: 1 July 2016 (s 2 item 3)
Sch 3: 1 July 2019 (s 2 item 4)
Remainder: 1 July 2013 (s 2 items 1, 2)

--

102, 2013

4 June 2013 (F2013L00906)

5 June 2013 (s 2)

--

115, 2013

17 June 2013 (F2013L01013)

18 June 2013 (s 2)

--

117, 2013

17 June 2013 (F2013L01010)

Sch 1 (items 3, 4): 18 June 2013 (s 2)

--

125, 2013

14 June 2013 (F2013L00993)

Sch 1 (item 1): 1 July 2013 (s 2)

--

150, 2013

29 June 2013 (F2013L01279)

30 June 2013 (s 2)

--

151, 2013

28 June 2013 (F2013L01227)

1 July 2013 (s 2)

--

152, 2013

28 June 2013 (F2013L01264)

Sch 1 (items 11-17): 1 July 2013 (s 2)

--

155, 2013

28 June 2013 (F2013L01246)

Sch 1 (items 1-86) and Sch 2 (items 3, 4): 1 July 2013 (s 2 items 2, 6)
Sch 2 (items 1, 2): 1 July 2015 (s 2 item 5)
Sch 3: never commenced (s 2 items 7, 8)

--

190, 2013

26 July 2013 (F2013L01436)

Sch 1: 27 July 2013 (s 2)

--

191, 2013

26 July 2013 (F2013L01440)

Sch 1: 27 July 2013 (s 2)

--

192, 2013

25 July 2013 (F2013L01431)

Sch 1 (item 6): 26 July 2013 (s 2)

--

202, 2013

6 Aug 2013 (F2013L01523)

Sch 2: 7 Aug 2013 (s 2)

--

33, 2014

14 Mar 2014 (F2014L00261)

Sch 1 (item 2), Sch 2 (items 1-4) and Sch 3 (item 3): 15 Mar 2014 (s 2)

--

88, 2014

13 June 2014 (F2014L00711)

Sch 1, 2 and Sch 3 (items 5, 6): 14 June 2014 (s 2)

--

102, 2014

30 June 2014 (F2014L00891)

1 July 2014 (s 2)
Note: disallowed by the Senate at 7.39 pm on 19 Nov 2014; rescinded 27 Nov 2014

--

134, 2014

8 Sept 2014 (F2014L01199)

Repealed before commencing (s 2)

--

as repealed by

 

 

 

210, 2014

15 Dec 2014 (F2014L01704)

16 Dec 2014 (s 2)

--

175, 2014

17 Nov 2014 (F2014L01526)

Sch 1: 1 Dec 2014 (s 2 item 2)
Sch 2: 1 Dec 2016 (s 2 item 3)
Remainder: 18 Nov 2014 (s 2 item 1)

--

185, 2014

1 Dec 2014 (F2014L01612)

Sch 1 (item 3): 1 Dec 2014 (s 2(1) item 2)
Sch 2: 2 Dec 2014 (s 2(1) item 3)

--

208, 2014

15 Dec 2014 (F2014L01707)

16 Dec 2014 (s 2)

--

209, 2014

16 Dec 2014 (F2014L01728)

19 Dec 2014 (s 2)

--

3, 2015

16 Feb 2015 (F2015L00152)

17 Feb 2015 (s 2)

--

24, 2015

12 Mar 2015 (F2015L00287)

13 Mar 2015 (s 2)

--

39, 2015

30 Mar 2015 (F2015L00367)

Sch 3 (item 1): 31 Mar 2015 (s 2 item 4)

--

91, 2015

18 June 2015 (F2015L00840)

Sch 1 (items 11-29, 40-45): 1 July 2015 (s 2(1) item 2)

Sch 1 (items 40-45)

92, 2015

18 June 2015 (F2015L00841)

Sch 1 (item 3): 19 June 2015 (s 2(1) item 1)

--

108, 2015

29 June 2015 (F2015L00969)

1 July 2015 (s 2(1) item 1)

--

134, 2015

12 Aug 2015 (F2015L01262)

Sch 1 (item 3): 13 Aug 2015 (s 2 (1) item 1)

--

135, 2015

13 Aug 2015 (F2015L01270)

14 Aug 2015 (s 2(1) item 1)

--

157, 2015

8 Sept 2015 (F2015L01411)

Sch 1 (items 6, 7): 1 Oct 2015 (s 2(1) item 3)
Sch 1 (items 8, 9): 5 Mar 2016 (s 2(1) item 4)
Remainder: 9 Sept 2015 (s 2(1) items 1, 2)

--

 

Name

Registration

Commencement

Application, saving and transitional provisions

Treasury Laws Amendment (2016 Measures No. 1) Regulation 2016

26 Feb 2016 (F2016L00156)

Sch 2 (items 19-25): 27 Feb 2016 (s 2(1) item 1)

--

Corporations Amendment (Remuneration Disclosures) Regulation 2016

15 Apr 2016 (F2016L00514)

16 Apr 2016 (s 2(1) item 1)

--

Tax and Superannuation Laws Amendment (2016 Measures No. 2) Regulation 2016

9 May 2016 (F2016L00710)

Sch 1 (item 1): 10 May 2016 (s 2(1) item 2)

--

Financial Services Legislation Amendment (Wholesale Margining) Regulation 2016

28 Oct 2016 (F2016L01657)

Sch 1: 29 Oct 2016 (s 2(1) item 1)

--

Corporations Amendment (Trustee Companies) Regulation 2016

12 Dec 2016 (F2016L01902)

13 Dec 2016 (s 2(1) item 1)

--

Corporations and Other Legislation Amendment (Insolvency Law Reform) Regulation 2016

13 Dec 2016 (F2016L01926)

Sch 1 (items 30-45) and Sch 2: 1 Mar 2017 (s 2(1) items 2, 4)
Sch 1 (items 77-102): 1 Sept 2017 (s 2(1) item 3)

--

Corporations Legislation Amendment (Professional Standards of Financial Advisers) Regulations 2017

13 Feb 2017 (F2017L00117)

Sch 1 (items 15-20): 15 Mar 2017 (s 2(1) item 1)

--

Corporations Amendment (Life Insurance Remuneration Arrangements) Regulations 2017

14 Mar 2017 (F2017L00212)

1 Jan 2018 (s 2(1) item 1)

--

Treasury Laws Amendment (Fair and Sustainable Superannuation) Regulations 2017

27 Mar 2017 (F2017L00321)

Sch 1 (item 1) and Sch 10 (item 1): 28 Mar 2017 (s 2(1) items 2, 7)
Sch 4 (items 1, 2): 2 July 2017 (s 2(1) item 3)

--

Corporations Amendment (Client Money) Regulations 2017

20 Apr 2017 (F2017L00455)

4 Apr 2018 (s 2(1) item 1)

--

Treasury Laws Amendment (Professional Standards Schemes) Regulations 2017

24 May 2017 (F2017L00595)

Sch 1 (items 29-39): 25 May 2017 (s 2(1) item 1)

--

Corporations Amendment (Crowd-sourced Funding) Regulations 2017

21 June 2017 (F2017L00710)

28 Sept 2017 (s 2(1) item 1)

--

Treasury Laws Amendment (Professional Standards Schemes) Regulations 2018

9 Feb 2018 (F2018L00096)

Sch 1 (items 10-12): 10 Feb 2018 (s 2(1) item 1)

--

Treasury Laws Amendment (Putting Consumers First--Establishment of the Australian Financial Complaints Authority) Regulations 2018

24 Apr 2018 (F2018L00515)

Sch 1 (items 1-3, 36-42) and Sch 2 (items 1, 2, 4, 5): 25 Apr 2018 (s 2(1) items 2, 4, 5, 8, 9)
Sch 3 (items 3-5): 5 Mar 2022 (s 2(1) item 10)

--

Corporations Amendment (Client Money Reporting Rules Enforcement Powers) Regulations 2018

8 June 2018 (F2018L00743)

9 June 2018 (s 2(1) item 1)

--

Corporations Amendment (Stay on Enforcing Certain Rights) Regulations 2018

22 June 2018 (F2018L00835)

1 July 2018 (s 2(1) item 1)

--

Corporations Amendment (Stay on Enforcing Certain Rights) Regulations (No. 2) 2018

29 June 2018 (F2018L00966)

1 July 2018 (s 2(1) item 1)

--

Corporations Amendment (Asia Region Funds Passport) Regulations 2018

20 Aug 2018 (F2018L01144)

Sch 1 and 3: 18 Sept 2018 (s 2(1) item 2)

--

Corporations Amendment (Crowd-sourced Funding) Regulations 2018

28 Sept 2018 (F2018L01379)

19 Oct 2018 (s 2(1) item 1)

--

Treasury Laws Amendment (Professional Standards Schemes No. 2) Regulations 2018

2 Oct 2018 (F2018L01393)

Sch 1 (items 16-21): 3 Oct 2018 (s 2(1) item 1)

--

Treasury Laws Amendment (Miscellaneous Amendments) Regulations 2018

7 Dec 2018 (F2018L01691)

Sch 1 (items 10, 11): 8 Dec 2018 (s 2(1) item 4)

--

Corporations Amendment (Name Exemption) Regulations 2019

8 Mar 2019 (F2019L00271)

Sch 1: 9 Mar 2019 (s 2(1) item 1)

--

Treasury Laws Amendment (Professional Standards Schemes) Regulations 2019

25 Mar 2019 (F2019L00368)

Sch 1 (items 21-27): 26 Mar 2019 (s 2(1) item 1)

--

Treasury Laws Amendment (Transition of Chi-X to National Guarantee Fund) Regulations 2019

25 Mar 2019 (F2019L00374)

26 Mar 2019 (s 2(1) item 1)

--

Treasury Laws Amendment (Strengthening Corporate and Financial Sector Penalties) Regulations 2019

25 Mar 2019 (F2019L00392)

Sch 1 (items 1-40): 26 Mar 2019 (s 2(1) item 2)

--

Treasury Laws Amendment (AFCA Cooperation) Regulations 2019

5 Apr 2019 (F2019L00537)

Sch 1 (items 1-3): 6 Apr 2019 (s 2(1) item 1)

--

Corporations Amendment (Proprietary Company Thresholds) Regulations 2019

5 Apr 2019 (F2019L00538)

1 July 2019 (s 2(1) item 1)

--

Treasury Laws Amendment (Protecting Your Superannuation Package) Regulations 2019

5 Apr 2019 (F2019L00539)

Sch 1 (items 1-28): 6 Apr 2019 (s 2(1) item 1)

--

Treasury Laws Amendment (Professional Standards Schemes No. 2) Regulations 2019

21 Oct 2019 (F2019L01351)

Sch 1 (items 26-36): 22 Oct 2019 (s 2(1) item 1)

--

Corporations Amendment (National Guarantee Fund Payments) Regulations 2019

18 Nov 2019 (F2019L01474)

19 Nov 2019 (s 2(1) item 1)

--

Treasury Laws Amendment (Ending Grandfathered Conflicted Remuneration) Regulations 2019

29 Nov 2019 (F2019L01526)

1 Jan 2021 (s 2(1) item 1)

--

Treasury Laws Amendment (Financial Services Improved Consumer Protection) (Funeral Expenses Facilities) Regulations 2019

29 Nov 2019 (F2019L01533)

1 Apr 2020 (s 2(1) item 1)

--

Corporations Amendment (Design and Distribution Obligations) Regulations 2019

16 Dec 2019 (F2019L01626)

5 Apr 2021 (s 2(1) item 1)

--

Treasury Laws Amendment (Miscellaneous Amendments) Regulations 2019

17 Dec 2019 (F2019L01641)

Sch 1 (items 2-24): 18 Dec 2019 (s 2(1) item 2)

--

Treasury Laws Amendment (Professional Standards Schemes) Regulations 2020

12 June 2020 (F2020L00699)

Sch 1 (items 12-16): 1 July 2020 (s 2(1) item 1)

--

Corporations Amendment (Stamping Fee Exemption) Regulations 2020

29 June 2020 (F2020L00834)

30 June 2020 (s 2(1) item 1)

--

Corporations Amendment (Litigation Funding) Regulations 2020

23 July 2020 (F2020L00942)

24 July 2020 (s 2(1) item 1)

--

Corporations and Bankruptcy Legislation Amendment (Extending Temporary Relief for Financially Distressed Businesses and Individuals) Regulations 2020

21 Sept 2020 (F2020L01191)

Sch 1 (items 3, 4): 22 Sept 2020 (s 2(1) item 1)

--

Financial Sector Reform (Hayne Royal Commission Response) (Regulation of Superannuation) Regulations 2020

11 Dec 2020 (F2020L01586)

Sch 1 (items 1-6): 1 Jan 2021 (s 2(1) item 2)
Sch 1 (items 8-10): 1 July 2021 (s 2(1) item 3)

--

Treasury Laws Amendment (Miscellaneous and Technical Amendments) Regulations 2020

14 Dec 2020 (F2020L01610)

Sch 1 (items 7-16): 15 Dec 2020 (s 2(1) item 2)
Sch 2 (items 1-11): 28 Sept 2022 (s 2(1) item 3)

--

Corporations Amendment (Corporate Insolvency Reforms) Regulations 2020

21 Dec 2020 (F2020L01654)

Sch 1, 2 and 3: 1 Jan 2021 (s 2(1) items 2-4)
Sch 4: 22 Dec 2020 (s 2(1) item 5)

--

Financial Sector Reform (Hayne Royal Commission Response) (2021 Measures No. 1) Regulations 2021

18 Feb 2021 (F2021L00127)

Sch 2: 19 Feb 2021 (s 2(1) item 1)

--

Financial Sector Reform (Hayne Royal Commission Response) (Claimant Intermediaries) Regulations 2021

16 Apr 2021 (F2021L00453)

17 Apr 2021 (s 2(1) item 1)

--

Treasury Laws Amendment (Professional Standards Schemes) Regulations 2021

30 Apr 2021 (F2021L00520)

Sch 1 (items 6, 7): 1 May 2021 (s 2(1) item 1)

--

Financial Sector Reform (Hayne Royal Commission Response--Advice Fees) Regulations 2021

14 May 2021 (F2021L00581)

Sch 1: 1 July 2021 (s 2(1) item 2)

--

Corporations Amendment (Statutory Minimum) Regulations 2021

28 May 2021 (F2021L00660)

Sch 1: 1 July 2021 (s 2(1) item 2)

--

Treasury Laws Amendment (Miscellaneous and Technical Amendments) Regulations 2021

25 June 2021 (F2021L00848)

Sch 1 (item 13): 26 June 2021 (s 2(1) item 2)
Sch 1 (item 20): 1 July 2021 (s 2(1) item 6)

--

Financial Sector Reform (Hayne Royal Commission Response--Breach Reporting and Remediation) Regulations 2021

5 Aug 2021 (F2021L01072)

Sch 1 (items 3-11): 1 Oct 2021 (s 2(1) item 1)

--

Financial Sector Reform (Hayne Royal Commission Response) (Hawking of Financial Products) Regulations 2021

6 Aug 2021 (F2021L01080)

5 Oct 2021 (s 2(1) item 1)

--

Treasury Laws Amendment (Professional Standards Schemes No. 2) Regulations 2021

24 Aug 2021 (F2021L01186)

Sch 1 (items 11-14): 25 Aug 2021 (s 2(1) item 1)

--

Corporations Amendment (Portfolio Holdings Disclosure) Regulations 2021

11 Nov 2021 (F2021L01531)

12 Nov 2021 (s 2(1) item 1)

--

Corporations Amendment (Litigation Funding) Regulations 2021

25 Nov 2021 (F2021L01608)

Sch 1 (items 5-11): never commenced (s 2(1) items 3, 4)
Remainder: 26 Nov 2021 (s 2(1) items 1, 2)

--

Treasury Laws Amendment (Greater Transparency of Proxy Advice) Regulations 2021

17 Dec 2021 (F2021L01801)

Sch 1 (items 1-5): 18 Dec 2021 (s 2(1) item 1)
Note: disallowed by the Senate at 11.59 am on 10 Feb 2022

--

Treasury Laws Amendment (Miscellaneous and Technical Amendments No. 2) Regulations 2021

17 Dec 2021 (F2021L01841)

Sch 1 (items 1-9): 18 Dec 2021 (s 2(1) item 2)
Sch 1 (items 16-18): 23 Feb 2022 (s 2(1) item 3)
Note: This amending title was affected by an editorial change (see F2022C00319)

--

Treasury Laws Amendment (Corporate Insolvency Reforms Consequential Amendments) Regulations 2021

20 Dec 2021 (F2021L01847)

Sch 1 (items 10-13): 21 Dec 2021 (s 2(1) item 1)

--

Financial Sector Reform Amendment (Hayne Royal Commission Response--Better Advice) Regulations 2021

20 Dec 2021 (F2021L01854)

Sch 1 (items 4-7): 1 Jan 2022 (s 2(1) item 1)

--

Treasury Laws Amendment (Professional Standards Schemes) Regulations 2022

21 Mar 2022 (F2022L00350)

Sch 1 (items 9-11): 22 Mar 2022 (s 2(1) item 2)
Sch 1 (items 16, 17): 1 July 2022 (s 2(1) item 3)

--

Corporations and Other Legislation Amendment (Corporate Collective Investment Vehicle Framework) Regulations 2022

31 Mar 2022 (F2022L00469)

Sch 1 (items 2-30), Sch 2 and Sch 3 (items 1-43): 1 July 2022 (s 2(1) item 1)

--

Treasury Laws Amendment (Professional Standards Schemes No. 2) Regulations 2022

24 June 2022 (F2022L00831)

Sch 1 (items 7-9): 1 July 2022 (s 2(1) item 1)

--

Corporations Amendment (Litigation Funding) Regulations 2022

9 Dec 2022 (F2022L01614)

10 Dec 2022 (s 2(1) item 1)

--

Treasury Laws Amendment (Miscellaneous and Technical Amendments) Regulations 2022

12 Dec 2022 (F2022L01627)

Sch 1 (items 1-3, 10, 14-16, 20): 13 Dec 2022 (s 2(1) item 2)

--

Treasury Laws Amendment (Rationalising ASIC Instruments) Regulations 2022

12 Dec 2022 (F2022L01629)

Sch 1 (items 1, 2): 13 Dec 2022 (s 2(1) item 2)
Sch 2: 1 Jan 2023 (s 2(1) item 3)

--

Corporations Amendment (Registration of Relevant Providers) Regulations 2022

16 Dec 2022 (F2022L01668)

17 Dec 2022 (s 2(1) item 1)

--

Treasury Laws Amendment (Modernising Business Communications and Other Measures) Regulations 2022

19 Dec 2022 (F2022L01689)

Sch 1 and Sch 2 (items 2-5): 15 Sept 2023 (s 2(1) items 2, 3)

--

Corporations Amendment (Design and Distribution Obligations--Income Management Regimes) Regulations 2023

3 Mar 2023 (F2023L00193)

4 Mar 2023 (s 2(1) item 1)

--

Fair Work and Other Legislation Amendment (Secure Jobs, Better Pay) Regulations 2023

30 May 2023 (F2023L00625)

Sch 1 (item 41): 31 May 2023 (s 2(1) item 6)

--

Corporations Amendment (Financial Services Compensation Scheme of Last Resort) Regulations 2023

6 July 2023 (F2023L00988)

7 July 2023 (s 2(1) item 1)

--

Treasury Laws Amendment (Financial Reporting and Auditing of Registrable Superannuation Entities) Regulations 2023

7 July 2023 (F2023L00990)

Sch 1 (items 1-29): 8 July 2023 (s 2(1) item 1)

--

Treasury Laws Amendment (Professional Standards Schemes) Regulations 2023

18 Oct 2023 (F2023L01394)

Sch 1 (item 4): 19 Oct 2023 (s 2(1) item 1)

--

Treasury Laws Amendment (Modernising Business Communications) Regulations 2023

27 Oct 2023 (F2023L01423)

Sch 1: 28 Oct 2023 (s 2(1) item 2)
Sch 2 (items 1-19): 1 Jan 2024 (s 2(1) item 3)

--

Treasury Laws Amendment (ALRC Financial Services Interim Report) Regulations 2023

31 Oct 2023 (F2023L01458)

Sch 1 (items 3-87, 112, 113, 124-309): 1 Nov 2023 (s 2(1) item 1)

--

 

Act

Number and year

Assent

Commencement

Application, saving and transitional provisions

Coronavirus Economic Response Package Omnibus Act 2020

22, 2020

24 Mar 2020

Sch 12 (items 26-29): 25 Mar 2020 (s 2(1) item 8)

--

 

Endnote 4--Amendment history

 

Provision affected

How affected

Chapter 1

 

Part 1.0

 

r 1.0.01A..................................

rep LA s 48D

r 1.0.02.....................................

rs No 319, 2001

 

am No 16, 2002; No 41, 2002; No 282, 2002; No 31, 2003; No 127, 2003; No 368, 2003; No 26, 2004; No 398, 2004; No 31, 2005; No 38, 2005; No 102, 2007; No 158, 2008; No 135, 2010; No 210, 2010; No 42, 2012; No 267, 2012; No 117, 2013; No 155, 2013; No 33, 2014; No 24, 2015; No 91, 2015; F2016L01926; F2018L00743; F2018L01144; F2019L01533; F2020L01610; F2021L01801 (disallowed); F2022L00469; F2022L01689; F2023L01458

r 1.0.02AA................................

ad F2023L01458

r 1.0.02AB................................

ad F2023L01458

r 1.0.02A..................................

ad No 332, 2010

 

rs No 193, 2011

 

am F2022L01689

r 1.0.02B...................................

ad F2019L00538

r. 1.0.03....................................

am 2004 No. 399

r 1.0.03A..................................

ad 2004 No 399

 

am 2007 No 195; F2016L01926; F2018L01144

r. 1.0.03B..................................

ad. 2004 No. 399

r 1.0.03C...................................

ad 2004 No 399

 

am F2016L01926

r. 1.0.05....................................

am. 2001 No. 319; 2003 No. 194

r 1.0.05A..................................

ad No 319, 2001

 

am No 16, 2002; No 41, 2002; F2021L01072

 

rep F2023L01458

r 1.0.07.....................................

am No 319, 2001; F2018L01144; F2022L00469

r 1.0.08.....................................

am F2018L01144; F2022L00469; F2023L00990

r 1.0.09.....................................

am F2022L00469

r 1.0.10.....................................

am F2022L01627

r 1.0.12.....................................

am F2016L01926

r 1.0.16.....................................

am F2018L01144; F2023L00990; F2023L01458

r 1.0.17.....................................

am F2022L01689

r. 1.0.18....................................

am. 2001 No. 319

r 1.0.20.....................................

am No 198, 2009; F2022L01627

r 1.0.22.....................................

ad No 319, 2001

 

rs F2023L01458

Part 1.2

 

Part 1.2.....................................

rep. 2001 No. 319

 

ad. 2011 No. 128

Division 1

 

r. 1.2.01....................................

rep. 2001 No. 319

 

ad. 2011 No. 128

rr. 1.2.02-1.2.32.......................

rep. 2001 No. 319

Chapter 2A

 

Part 2A.1

 

r. 2A.1.01.................................

am. 2003 No. 85

 

rs. 2006 No. 41

Chapter 2B

 

Part 2B.6

 

r 2B.6.02A................................

ad F2019L00271

Chapter 2C

 

Part 2C.1

 

Part 2C.1 heading......................

ad. 2007 No. 227

 

rs. 2010 No. 332

Part 2C.1...................................

rs. 2010 No. 332

Division 2C.1.1

 

r. 2C.1.01..................................

rs. 2001 No. 319

 

am. 2007 No. 323

 

rs. 2010 No. 332

Part 2C.2 heading......................

ad. 2007 No. 227

 

rep. 2010 No. 332

Part 2C.2...................................

rep. 2010 No. 332

r. 2C.1.02

 

renumbered r. 2C.2.01..............

2007 No. 227

r. 2C.2.01..................................

rep. 2010 No. 332

Division 2C.1.2

 

r. 2C.1.02..................................

ad. 2010 No. 332

r. 2C.1.03..................................

ad. 2010 No. 332

 

am. 2012 No. 233

r. 2C.1.04..................................

ad. 2010 No. 332

Division 2C.1.3

 

Part 2C.3 heading......................

rep. 2010 No. 332

Division 2C.1.3 heading............

ad. 2010 No. 332

r. 2C.3.01..................................

ad. 2007 No. 227

renumbered r. 2C.1.05..............

2010 No. 332

Chapter 2D

 

Chapter 2D................................

rep. 2001 No. 319

 

ad. 2009 No. 51

r. 2D.1.02.................................

rep. 2001 No. 319

Part 2D.2

 

Part 2D.2...................................

ad. 2009 No. 328

Division 2D.2.2

 

r. 2D.2.01.................................

ad. 2009 No. 328

r. 2D.2.02.................................

ad. 2009 No. 328

r. 2D.2.03.................................

ad. 2009 No. 328

Part 2D.6

 

Division 2D.6.1

 

r. 2D.6.01.................................

ad. 2009 No. 51

Part 2D.7

 

Part 2D.7...................................

ad. 2011 No. 128

r. 2D.7.01.................................

ad. 2011 No. 128

Chapter 2E

 

Chapter 2E................................

ad. 2007 No. 198

r. 2E 1.01..................................

ad. 2007 No. 198

Chapter 2G

 

Chapter 2G................................

ad. 2004 No. 208

Part 2G.2

 

Division 6

 

r. 2G.2.01.................................

ad. 2004 No. 208

Chapter 2K

 

r. 2K.2.01.................................

am. 2006 No. 57

r. 2K.2.03.................................

ad. 2006 No. 57

Chapter 2L

 

Chapter 2L................................

ad. 2010 No. 54

Part 2L.2

 

r. 2L.2.01..................................

ad. 2010 No. 54

Chapter 2M

 

Part 2M.3

 

Part 2M.3..................................

ad. 2004 No. 208

Division 1

 

r 2M.3.01..................................

ad No 184, 2010

 

am F2023L00990

r. 2M.3.03.................................

ad. 2004 No. 208

 

am. 2006 No. 126

 

rs. 2007 No. 193

 

am. No 152 and 192, 2013; F2016L00514

r 2M.3.04..................................

ad F2023L00990

Division 9.................................

ad. 2004 No. 399

 

rep. No. 152, 2013

r. 2M.3.30.................................

ad. 2004 No. 399

 

rep. No. 152, 2013

r. 2M.3.31.................................

ad. 2004 No. 399

 

rep. No. 152, 2013

r. 2M.3.32.................................

ad. 2004 No. 399

 

rep. No. 152, 2013

Part 2M.4

 

r. 2M.4.01A..............................

ad. 2010 No. 184

 

rs. No. 125, 2013

Part 2M.4A

 

Part 2M.4A...............................

ad. 2012 No. 171

r. 2M.4A.01..............................

ad. 2012 No. 171

r. 2M.4A.02..............................

ad. 2012 No. 171

Part 2M.6

 

r. 2M.6.03.................................

rep. 2007 No. 194

r. 2M.6.04.................................

ad. 2005 No. 160

 

rep. 2007 No. 193

r. 2M.6.05.................................

ad. 2006 No. 126

Chapter 2N

 

Chapter 2N................................

ad. 2003 No. 194

Part 2N.2

 

r 2N.2.01..................................

ad No 194, 2003

 

am No 196, 2007; No 93, 2008

 

rs F2018L01144

 

am F2022L00469; F2023L01458

Part 2N.4

 

r 2N.4.01..................................

ad No 194, 2003

 

rs F2018L01144

 

am F2022L00469

Chapter 5

 

Part 5.1

 

r 5.1.02.....................................

rep F2023L01423

r 5.1.50.....................................

ad F2018L00835

Part 5.2

 

r 5.2.01 (second occurring).......

renum F2016L01926

r 5.2.02 (prev r 5.2.01 second
occurring)

 

r 5.2.50.....................................

ad F2018L00835

Part 5.3A

 

r 5.3A.01..................................

rep F2016L01926

r 5.3A.02..................................

rep F2016L01926

r 5.3A.03..................................

am No 399, 2004

 

rep F2016L01926

r 5.3A.03A................................

ad No 114, 2012

 

am F2016L01926

r 5.3A.03AB.............................

ad No 114, 2012

 

rep F2016L01926

r 5.3A.04..................................

am No 399, 2004; No 325, 2007

 

rep F2016L01926

r 5.3A.06A................................

ad No 114, 2012

 

am F2016L01926

r 5.3A.06AB.............................

ad No 114, 2012

 

rep F2016L01926

r 5.3A.07..................................

am No 399, 2004; No 325, 2007; No 114, 2012

 

rep F2016L01926

r 5.3A.07A................................

ad No 114, 2012

 

am F2016L01926

r. 5.3A.08.................................

rep. 2007 No. 325

r. 5.3A.09.................................

rep. 2007 No. 325

r 5.3A.50..................................

ad F2018L00835

 

am F2018L00966; F2020L01610; F2023L00625; F2023L01458

Part 5.3B

 

Part 5.3B...................................

ad F2020L01654

Division 1

 

r 5.3B.01...................................

ad F2020L01654

Division 2

 

Subdivision A

 

r 5.3B.02...................................

ad F2020L01654

 

am F2021L01847

r 5.3B.03...................................

ad F2020L01654

 

am F2023L01458

r 5.3B.04...................................

ad F2020L01654

r 5.3B.05...................................

ad F2020L01654

r 5.3B.06...................................

ad F2020L01654

Subdivision B

 

r 5.3B.07...................................

ad F2020L01654

r 5.3B.08...................................

ad F2020L01654

r 5.3B.09...................................

ad F2020L01654

r 5.3B.10...................................

ad F2020L01654

 

rep F2021L01847

r 5.3B.11...................................

ad F2020L01654

Subdivision C

 

r 5.3B.12...................................

ad F2020L01654

Division 3

 

Subdivision A

 

r 5.3B.13...................................

ad F2020L01654

Subdivision B

 

r 5.3B.14...................................

ad F2020L01654

r 5.3B.15...................................

ad F2020L01654

 

am F2021L01847

r 5.3B.16...................................

ad F2020L01654

r 5.3B.17...................................

ad F2020L01654

r 5.3B.18...................................

ad F2020L01654

r 5.3B.19...................................

ad F2020L01654

r 5.3B.20...................................

ad F2020L01654

r 5.3B.21...................................

ad F2020L01654

r 5.3B.22...................................

ad F2020L01654

r 5.3B.23...................................

ad F2020L01654

r 5.3B.24...................................

ad F2020L01654

Subdivision C

 

r 5.3B.25...................................

ad F2020L01654

 

am F2022L01627

r 5.3B.26...................................

ad F2020L01654

r 5.3B.27...................................

ad F2020L01654

r 5.3B.28...................................

ad F2020L01654

r 5.3B.29...................................

ad F2020L01654

r 5.3B.30...................................

ad F2020L01654

 

am F2023L01458

r 5.3B.31...................................

ad F2020L01654

r 5.3B.32...................................

ad F2020L01654

Subdivision D

 

r 5.3B.33...................................

ad F2020L01654

r 5.3B.34...................................

ad F2020L01654

r 5.3B.35...................................

ad F2020L01654

r 5.3B.36...................................

ad F2020L01654

r 5.3B.37...................................

ad F2020L01654

r 5.3B.38...................................

ad F2020L01654

r 5.3B.39...................................

ad F2020L01654

r 5.3B.40...................................

ad F2020L01654

 

rep F2021L01847

r 5.3B.41...................................

ad F2020L01654

 

rep F2021L01847

r 5.3B.42...................................

ad F2020L01654

r 5.3B.43...................................

ad F2020L01654

r 5.3B.44...................................

ad F2020L01654

r 5.3B.45...................................

ad F2020L01654

Division 4

 

r 5.3B.46...................................

ad F2020L01654

r 5.3B.47...................................

ad F2020L01654

Division 5

 

Subdivision A

 

r 5.3B.48...................................

ad F2020L01654

Subdivision B

 

r 5.3B.49...................................

ad F2020L01654

r 5.3B.50...................................

ad F2020L01654

r 5.3B.51...................................

ad F2020L01654

r 5.3B.52...................................

ad F2020L01654

r 5.3B.53...................................

ad F2020L01654

Subdivision C

 

r 5.3B.54...................................

ad F2020L01654

r 5.3B.55...................................

ad F2020L01654

r 5.3B.56...................................

ad F2020L01654

r 5.3B.57...................................

ad F2020L01654

r 5.3B.58...................................

ad F2020L01654

Division 6

 

r 5.3B.59...................................

ad F2020L01654

r 5.3B.60...................................

ad F2020L01654

r 5.3B.61...................................

ad F2020L01654

r 5.3B.62...................................

ad F2020L01654

r 5.3B.63...................................

ad F2020L01654

r 5.3B.64...................................

ad F2020L01654

Division 7

 

r 5.3B.65...................................

ad F2020L01654

Part 5.4

 

r 5.4.01AA................................

ad Act No 22, 2020

 

am F2020L01191

 

rep end of 31 Dec 2020 (r 5.4.01AA(3))

r 5.4.01AAA.............................

ad F2020L01654

 

am F2021L00660; F2022L01689

r 5.4.01A..................................

ad No 114, 2012

 

am F2016L01926; F2022L00469; F2022L01689

r 5.4.01B...................................

ad F2016L01926

 

am F2022L00469

r. 5.4.02....................................

ad. 2007 No. 325

Part 5.4C

 

Part 5.4C...................................

ad. 2012 No. 114

r. 5.4C.01..................................

ad. 2012 No. 114

Part 5.5

 

Part 5.5.....................................

ad. 2012 No. 114

Division 1

 

Division 1 heading....................

ad F2020L01654

r 5.5.01.....................................

ad No 114, 2012

 

am F2016L01926; F2020L01610; F2022L00469

Division 2

 

Division 2.................................

ad F2020L01654

Subdivision A

 

r 5.5.02.....................................

ad No 114, 2012

 

rep F2016L01926

 

ad F2020L01654

r 5.5.03.....................................

ad F2020L01654

 

am F2023L01458

Subdivision B

 

r 5.5.04.....................................

ad F2020L01654

r 5.5.05.....................................

ad F2020L01654

r 5.5.06.....................................

ad F2020L01654

Subdivision C

 

r 5.5.07.....................................

ad F2020L01654

r 5.5.08.....................................

ad F2020L01654

r 5.5.09.....................................

ad F2020L01654

Part 5.6

 

r 5.6.01.....................................

rep F2016L01926

r 5.6.02.....................................

rep F2016L01926

r 5.6.06.....................................

am No 325, 2007

 

rep F2016L01926

r 5.6.07.....................................

am No 325, 2007

 

rep F2016L01926

r 5.6.08.....................................

rep F2016L01926

r 5.6.09.....................................

rep F2016L01926

r 5.6.10.....................................

am No 325, 2007

 

rep F2016L01926

r 5.6.11.....................................

am No 325, 2007; F2016L01926; F2022L01689

r 5.6.11A..................................

ad No 325, 2007

 

am F2016L01926

 

rep F2020L01654

r 5.6.12.....................................

am No 325, 2007

 

rep F2016L01926

r 5.6.13.....................................

rep F2016L01926

r 5.6.13A..................................

rep F2016L01926

r 5.6.13B...................................

rep F2016L01926

r 5.6.14.....................................

am No 325, 2007

 

rep F2016L01926

r 5.6.14A..................................

rs No 325, 2007

 

am No 114, 2012

 

rep F2016L01926

r 5.6.14B...................................

rep F2016L01926

r 5.6.15.....................................

rep F2016L01926

r 5.6.16.....................................

am No 325, 2007

 

rep F2016L01926

r 5.6.17.....................................

am No 325, 2007

 

rep F2016L01926

r 5.6.18.....................................

am No 325, 2007

 

rep F2016L01926

r 5.6.19.....................................

rep F2016L01926

r 5.6.20.....................................

rep F2016L01926

r 5.6.21.....................................

am No 325, 2007

 

rep F2016L01926

r 5.6.22.....................................

rep F2016L01926

r 5.6.23.....................................

rep F2016L01926

r 5.6.23A..................................

ad No 325, 2007

 

rep F2016L01926

r 5.6.24.....................................

am No 325, 2007

 

rep F2016L01926

r 5.6.26.....................................

am No 325, 2007

 

rep F2016L01926

r 5.6.27.....................................

am No 325, 2007

 

rep F2016L01926

r 5.6.28.....................................

am No 325, 2007

 

rep F2016L01926

r 5.6.29.....................................

rs No 325, 2007

 

rep F2016L01926

r 5.6.30.....................................

rep F2016L01926

r 5.6.31.....................................

am No 325, 2007

 

rep F2016L01926

r 5.6.31A..................................

rep F2016L01926

r 5.6.32.....................................

rep F2016L01926

r 5.6.33.....................................

rs No 325, 2007

 

rep F2016L01926

r 5.6.34.....................................

rep F2016L01926

r 5.6.36.....................................

rep F2016L01926

r 5.6.36A..................................

rep F2016L01926

r 5.6.39.....................................

am No 114, 2012; F2020L01654; F2022L00469

r 5.6.43A..................................

am F2022L01689

r 5.6.48.....................................

am No 325, 2007; No 114, 2012; F2020L01654; F2022L00469

r 5.6.53.....................................

am No 325, 2007; F2020L01654

r 5.6.54.....................................

am No 325, 2007; F2020L01654

r 5.6.55.....................................

am No 325, 2007; F2020L01654

r 5.6.59.....................................

am No 399, 2004; No 325, 2007; F2020L01654

r 5.6.62.....................................

am No 399, 2004; F2020L01654

r 5.6.65.....................................

am No 325, 2007; No 114, 2012; F2016L01926; F2020L01654; F2022L00469

r 5.6.66.....................................

am No 325, 2007; F2020L01654

r 5.6.67A..................................

ad F2020L01654

r 5.6.68.....................................

am F2020L01654

r. 5.6.69....................................

am. 2012 No. 114

r 5.6.70B...................................

ad 2012 No 114

 

am F2022L00469

r. 5.6.73....................................

ad. 2007 No. 325

r 5.6.74.....................................

rs F2023L01458

r 5.6.75.....................................

ad No 114, 2012

 

am F2020L01654; F2023L01423

Part 5.7B

 

Part 5.7B...................................

ad F2020L01191

r 5.7B.01...................................

ad F2020L01191

Chapter 5B

 

Part 5B.2

 

r. 5B.2.05..................................

ad. 2007 No. 199

Part 5B.3

 

r. 5B.3.04..................................

am. 2001 No. 319

Chapter 5C

 

Part 5C.1

 

r 5C.1.01...................................

am F2018L01144

r 5C.1.02...................................

am F2018L01144

Part 5C.11

 

Division 1

 

r 5C.11.01.................................

rs No 172, 2012

 

am F2016L01926

 

rs F2020L00942

 

am F2022L01614

Division 2

 

r. 5C.11.03A.............................

ad. 2011 No. 193

r 5C.11.04.................................

am F2018L01144

r. 5C.11.05A.............................

rs. 2003 No. 31

Chapter 5D

 

Part 5D.1

 

Part 5D.1...................................

ad. 2010 No. 88

r 5D.1.01..................................

ad No 88, 2010

 

rs No 43, 2012

 

rep F2023L01423

r. 5D.1.01A...............................

ad. 2012 No. 43

r 5D.1.02..................................

ad No 88, 2010

 

am F2023L01458

r. 5D.1.03.................................

ad. 2010 No. 88

r. 5D.1.04.................................

ad. 2010 No. 88

Part 5D.2

 

Part 5D.2...................................

ad. 2010 No. 88

Division 2.1

 

r 5D.2.01..................................

ad No 88, 2010

 

am F2019L00392

r. 5D.2.02.................................

ad. 2010 No. 88

Division 2.2

 

Division 2.2..............................

ad. 2010 No 88

r. 5D.2.03.................................

ad. 2010 No. 88

r. 5D.2.04.................................

ad. 2010 No. 88

r 5D.2.05..................................

ad No 88, 2010

 

am F2019L00392

r 5D.2.06..................................

ad No. 88, 2010

 

am No 43, 2012; F2019L00392

r 5D.2.07..................................

ad No 88, 2010

 

am F2019L00392

r 5D.2.08..................................

ad No 88, 2010

 

am F2019L00392

r. 5D.2.09.................................

ad. 2010 No. 88

 

rep. 2012 No. 43

Part 5D.3

 

Part 5D.3...................................

ad. 2010 No. 88

r. 5D.3.01.................................

ad. 2010 No. 88

Part 5D.4

 

Part 5D.4...................................

ad. 2012 No. 43

r 5D.4.01..................................

ad No 43, 2012

 

am F2023L01458

Part 5D.5

 

Part 5D.5...................................

ad F2023L01423

r 5D.5.01..................................

ad F2023L01423

Chapter 6

 

Part 6.2

 

r 6.2.01A..................................

ad F2018L01379

Part 6.5.....................................

ad No 319, 2001

 

rs No 16, 2002

 

rep F2022L01627

r 6.5.01.....................................

ad No 319, 2001

 

rs No 16, 2002; No 41, 2002

 

am No 126, 2002

 

rep F2022L01627

Part 6.6

 

Part 6.6.....................................

ad. 2001 No. 319

r. 6.6.01....................................

ad. 2001 No. 319

Part 6.8

 

Part 6.8.....................................

ad. 2001 No. 319

r. 6.8.01....................................

ad. 2001 No. 319

r. 6.8.02....................................

ad. 2001 No. 319

Part 6.10

 

r 6.10.01...................................

am F2023L01458

Chapter 6A

 

Chapter 6A................................

ad. 2001 No. 319

Part 6A.1

 

r. 6A.1.01.................................

ad. 2001 No. 319

Chapter 6CA

 

Chapter 6CA.............................

ad. 2001 No. 319

r. 6CA.1.01...............................

ad. 2001 No. 319

 

rs. 2002 No. 41

Chapter 6D

 

Part 6D.2

 

r. 6D.2.03.................................

ad. 2001 No. 319

r 6D.2.04..................................

ad No 209, 2014

r 6D.2.05..................................

ad No 209, 2014

r 6D.2.06..................................

ad No 209, 2014

Part 6D.3A

 

Part 6D.3A................................

ad F2017L00710

r 6D.3A.01................................

ad F2017L00710

 

am F2018L01379

r 6D.3A.02................................

ad F2017L00710

 

am F2018L01379

r 6D.3A.03................................

ad F2017L00710

r 6D.3A.04................................

ad F2017L00710

 

am F2018L01379

r 6D.3A.05................................

ad F2017L00710

 

am F2018L01379

r 6D.3A.06................................

ad F2017L00710

 

am F2018L01379

r 6D.3A.07................................

ad F2017L00710

r 6D.3A.08................................

ad F2017L00710

r 6D.3A.09................................

ad F2017L00710

 

am F2018L01379

r 6D.3A.10................................

ad F2017L00710

Part 6D.5

 

Part 6D.5...................................

ad. 2002 No. 16

r. 6D.5.01.................................

ad. 2002 No. 16

r. 6D.5.02.................................

ad. 2005 No. 324

r 6D.5.03..................................

ad F2018L01379

Chapter 7

 

Chapter 7..................................

rs. 2001 No. 319

Part 7.1

 

Division 1

 

r. 7.1.01....................................

rs. 2001 No. 319

 

am. 2004 No. 398; 2007 No. 323

 

rep. 2011 No. 193

r 7.1.02.....................................

ad No 319, 2001

 

rep F2022L01689

r 7.1.03.....................................

rs No 319, 2001; No 15, 2002

 

am F2022L01689

 

rep F2023L01458

r 7.1.03A..................................

ad No 16, 2002

 

am F2022L01689

 

rep F2023L01458

r 7.1.03B...................................

ad No 41, 2002

 

rep F2023L01458

r 7.1.04.....................................

ad No 319, 2001

 

am No 126, 2002; No 126, 2003; No 33, 2014; No 24, 2015; F2022L01689; F2023L01458

r. 7.1.04A.................................

ad. 2002 No. 16

 

am 2002 No. 41

r. 7.1.04B..................................

ad. 2002 No. 41

r. 7.1.04C..................................

ad. 2002 No. 41

r 7.1.04CAA.............................

ad F2021L00453

r. 7.1.04CA...............................

ad. 2007 No. 324

r 7.1.04CB................................

ad F2021L00127

r. 7.1.04D.................................

ad. 2002 No. 41

r 7.1.04E...................................

ad No 202, 2003

r 7.1.04E (second occurring)....

ad No 25, 2004

 

renum No 36, 2004

r 7.1.04F...................................
(prev r 7.1.04E second occurring)

am F2021L00127

r. 7.1.04G.................................

ad. 2005 No. 31

r 7.1.04N..................................

ad No 172, 2012

 

rs F2020L00942

 

am F2021L00848; F2022L01614

r 7.1.05.....................................

ad No 319, 2001

 

am F2023L01458

r 7.1.06.....................................

ad No 319, 2001

 

am No 41, 2002; No 368, 2003; No 172, 2012; F2018L01144; F2020L00942; F2022L01614; F2023L01458

r 7.1.06A..................................

ad No 41, 2002

 

am No 368, 2003; F2023L01458

r 7.1.06B...................................

ad No 31, 2003

 

rep F2019L01641

r. 7.1.07....................................

ad. 2001 No. 319

 

rs. 2002 No. 16

 

am. 2003 No. 202

r. 7.1.07A.................................

ad. 2002 No. 16

r. 7.1.08....................................

ad. 2001 No. 319

Renumbered r. 7.1.07B.............

2003 No. 31

r 7.1.07C...................................

ad No 31, 2003

 

am F2019L01626

r 7.1.07D..................................

ad No 31, 2003

 

rep F2019L01533

r. 7.1.07E..................................

ad. 2003 No. 282

r. 7.1.07F..................................

ad. 2003 No. 282

r. 7.1.07G.................................

ad. 2003 No. 368

r. 7.1.07H.................................

ad. 2004 No. 25

r 7.1.07I....................................

ad No 42, 2012

 

(1) exp 1 July 2012 (r 7.1.07I(2)(a))

 

rep F2022L01689

r 7.1.07J....................................

ad No 24, 2015

r. 7.1.08A.................................

ad. 2002 No. 16

 

am. 2002 No. 41

 

rep. 2003 No. 31

r 7.1.08AA................................

ad F2021L00127

r. 7.1.08....................................

ad. 2003 No. 31

 

am. 2010 No. 89; F2017L00710

r. 7.1.08A.................................

ad. 2012 No. 42

r 7.1.09.....................................

ad No 319, 2001

 

am No 398, 2004; No 42, 2012; F2018L01144; F2023L01458

r. 7.1.10....................................

ad. 2001 No. 319

 

am. 2002 No. 16; 2007 No. 323

Division 2

 

r. 7.1.11....................................

ad. 2001 No. 319

 

am. 2003 No. 31

r. 7.1.12....................................

ad. 2001 No. 319

 

am. 2003 No. 31

r. 7.1.13....................................

ad. 2001 No. 319

 

am. 2003 No. 31

r. 7.1.14....................................

ad. 2001 No. 319

 

am. 2002 No. 16; 2003 No. 31

r. 7.1.15....................................

ad. 2001 No. 319

 

am. 2003 No. 31

r. 7.1.16....................................

ad. 2001 No. 319

 

am. 2003 No. 31

r 7.1.17.....................................

ad No 319, 2001

 

am No 16, 2002; No 31, 2003; F2019L01641

r. 7.1.17A.................................

ad. 2003 No. 127

r. 7.1.17B..................................

ad. 2003 No. 368

r. 7.1.17C..................................

ad. 2010 No. 88

r 7.1.18.....................................

ad No 319, 2001

 

am F2023L01458

r 7.1.19.....................................

ad No 319, 2001

 

am F2023L01458

r 7.1.19A..................................

ad No 89, 2010

 

am F2023L01458

r 7.1.20.....................................

ad No 319, 2001

 

am F2023L01458

r 7.1.21.....................................

ad No 319, 2001

 

am F2023L01458

r 7.1.22.....................................

ad No 319, 2001

 

am No 16, 2002; F2019L01641; F2023L01458

r 7.1.22AA................................

ad F2019L01641

 

am F2020L01610

r. 7.1.22A.................................

ad. 2003 No. 202

r 7.1.23.....................................

ad No 319, 2001

 

am F2023L01458

r 7.1.24.....................................

ad No 319, 2001

 

am F2023L01458

r 7.1.25.....................................

ad No 319, 2001

 

am F2023L01458

r 7.1.26.....................................

ad No 319, 2001

 

am F2023L01458

r. 7.1.27....................................

ad. 2001 No. 319

 

am. 2003 No. 368

r 7.1.28.....................................

ad No 319, 2001

 

am F2023L01458

Division 3

 

r 7.1.28AA................................

ad No 108, 2015

r 7.1.28AB................................

ad F2021L01801 (disallowed)

r. 7.1.28A.................................

ad. 2010 No. 88

r 7.1.29.....................................

ad No 319, 2001

 

am No 41, 2002

 

rs No 85, 2003

 

am No 368, 2003; No 25, 2004; No 46, 2012; F2018L01144; F2023L01458

r. 7.1.29A.................................

ad. 2004 No. 25

 

am. No 101 and 152, 2013

 

rep No 101, 2013

r. 7.1.30....................................

ad. 2002 No. 16

 

rep F2021L01801 (disallowed)

r. 7.1.31....................................

ad. 2002 No. 16

r. 7.1.32....................................

ad. 2002 No. 16

r 7.1.33.....................................

ad No 41, 2002

 

rep F2021L00127

r 7.1.33A..................................

ad No 41, 2002

 

am F2018L01144

r. 7.1.33B..................................

ad. 2002 No. 41

 

am. 2003 No 126 and 368

r. 7.1.33C..................................

ad. 2003 No. 48

 

rep. 2003 No. 369

r 7.1.33D..................................

ad No 85, 2003

 

am F2023L01458

r 7.1.33E...................................

ad No 282, 2003

 

am F2018L01144; F2023L01458

r. 7.1.33F..................................

ad. 2003 No. 368

r. 7.1.33G.................................

ad. 2005 No. 324

r. 7.1.33H.................................

ad. 2005 No. 324

Division 4

 

Division 4 of Part 7.1................

ad. 2002 No. 16

r. 7.1.34....................................

ad. 2002 No. 16

 

rs. 2003 No. 282

 

am. 2010 No. 89

r. 7.1.35....................................

ad. 2003 No. 126

 

am. 2005 No. 31

r. 7.1.35A.................................

ad. 2003 No. 368

r. 7.1.35B..................................

ad. 2012 No. 42

r. 7.1.35C..................................

ad. 2012 No. 42

Division 5

 

Division 5.................................

ad. 2003 No. 126

r 7.1.40.....................................

ad No 126, 2003

 

am No 368, 2003; No 31, 2005; No 42, 2012; F2023L01458

Division 6

 

Division 6.................................

ad. No. 59, 2013

r 7.1.50.....................................

ad No 59, 2013

 

am F2023L01458

Part 7.2

 

Division 1

 

r. 7.2.01....................................

rs. 2001 No. 319

r. 7.2.02....................................

rs. 2001 No. 319

r. 7.2.03....................................

ad. 2001 No. 319

r. 7.2.04....................................

ad. 2001 No. 319

r. 7.2.05....................................

ad. 2001 No. 319

r 7.2.06.....................................

ad No 319, 2001

 

am F2019L00392

Division 2

 

r 7.2.07.....................................

ad No. 319, 2001

 

am No 26, 2004; No 210, 2010; F2019L00392

r. 7.2.08....................................

ad. 2001 No. 319

 

am. 2010 No. 210

Division 3

 

r. 7.2.09....................................

ad. 2001 No. 319

 

am. 2002 No. 126; 2012 No. 42

Division 4

 

r. 7.2.10....................................

ad. 2001 No. 319

r. 7.2.11....................................

ad. 2001 No. 319

r. 7.2.12....................................

ad. 2001 No. 319

Division 5

 

r. 7.2.13....................................

ad. 2001 No. 319

r. 7.2.14....................................

ad. 2001 No. 319

r. 7.2.15....................................

ad. 2001 No. 319

Division 6

 

Division 6 of Part 7.2................

ad. 2002 No. 41

r 7.2.16.....................................

ad No 41, 2002

 

am No 126, 2002; F2019L00392

Part 7.2A

 

Part 7.2A...................................

ad. 2010 No. 210

Division 7.2A.1

 

r. 7.2A.01.................................

ad. 2010 No. 210

Division 7.2A.2

 

r. 7.2A.02.................................

ad. 2010 No. 210

r. 7.2A.03.................................

ad. 2010 No. 210

r. 7.2A.04.................................

ad. 2010 No. 210

r. 7.2A.05.................................

ad. 2010 No. 210

r. 7.2A.06.................................

ad. 2010 No. 210

r 7.2A.07..................................

ad No 210, 2010

 

am F2019L00392

r. 7.2A.08.................................

ad. 2010 No. 210

r. 7.2A.09.................................

ad. 2010 No. 210

r. 7.2A.10.................................

ad. 2010 No. 210

r. 7.2A.11.................................

ad. 2010 No. 210

r. 7.2A.12.................................

ad. 2010 No. 210

r. 7.2A.13.................................

ad. 2010 No. 210

r. 7.2A.14.................................

ad. 2010 No. 210

r. 7.2A.15.................................

ad. 2010 No. 210

Part 7.3

 

Division 1

 

r. 7.3.01....................................

rs. 2001 No. 319

rr. 7.3.01A, 7.3.01B..................

rep. 2001 No. 319

r. 7.3.02....................................

rs. 2001 No. 319

rr. 7.3.02B-7.3.02D..................

rep. 2001 No. 319

r. 7.3.03....................................

rs. 2001 No. 319

r 7.3.04.....................................

rs No 319, 2001

 

am No 41, 2002; F2019L00392

Division 2

 

r 7.3.05.....................................

rs No 319, 2001

 

am F2019L00392

r. 7.3.06....................................

rs. 2001 No. 319

Division 3

 

r. 7.3.07....................................

rs. 2001 No. 319

 

am. 2002 No. 126; 2012 No. 42

r. 7.3.08....................................

rs. 2001 No. 319

 

am. 2002 No. 126; 2012 No. 42

Division 4

 

r. 7.3.09....................................

rs. 2001 No. 319

r 7.3.10.....................................

rs No 319, 2001

 

am F2023L01458

r. 7.3.10A.................................

rep. 2001 No. 319

r. 7.3.11....................................

rs. 2001 No. 319

Division 5

 

r. 7.3.12....................................

rs. 2001 No. 319

r. 7.3.13....................................

rs. 2001 No. 319

rr. 7.3.13A-7.3.13C..................

rep. 2001 No. 319

r. 7.3.14....................................

rs. 2001 No. 319

r. 7.3.14A.................................

rep. 2001 No. 319

rr. 7.3.15-7.3.18.......................

rep. 2001 No. 319

Part 7.4

 

r 7.4.01.....................................

rs No 319, 2001

 

am No 16, 2002; No 26, 2004; No 398, 2004; F2023L01458

r. 7.4.01A.................................

rep. 2001 No. 319

r. 7.4.02....................................

rs. 2001 No. 319

r. 7.4.03....................................

rs. 2001 No. 319

r. 7.4.04....................................

rs. 2001 No. 319

r. 7.4.04A.................................

rep. 2001 No. 319

rr. 7.4.05-7.4.08.......................

rep. 2001 No. 319

Part 7.5

 

Division 1

 

r 7.5.01.....................................

rs No 319, 2001

 

am No 282, 2002; No 26, 2004; No 398, 2004; No 38, 2005; No 193, 2011; F2023L01458

r. 7.5.01A.................................

ad. 2004 No. 26

r. 7.5.02....................................

ad. 2001 No. 319

r. 7.5.03....................................

ad. 2001 No. 319

 

am. 2002 No. 282; 2004 No 26 and 398; 2005 No. 38

r. 7.5.04....................................

ad. 2001 No. 319

 

am. 2002 No. 282; 2004 No 26, 36 and 398

r. 7.5.05....................................

ad. 2001 No. 319

 

rep. 2005 No. 38

r. 7.5.06....................................

ad. 2001 No. 319

 

am. 2002 No. 282; 2004 No 26 and 398

r. 7.5.07....................................

ad. 2001 No. 319

 

am. 2002 No. 282; 2005 No 38 and 324

r. 7.5.08....................................

ad. 2001 No. 319

 

am. 2002 No. 282; 2005 No. 38

r 7.5.09.....................................

ad No 319, 2001

 

am No 16, 2002; F2018L01144

r. 7.5.10....................................

ad. 2001 No. 319

r. 7.5.11....................................

ad. 2001 No. 319

 

rep. 2005 No. 38

r. 7.5.12....................................

ad. 2001 No. 319

 

am. 2002 No. 282

 

rep. 2005 No. 38

r. 7.5.13....................................

ad. 2001 No. 319

Division 2

 

r. 7.5.14....................................

ad. 2001 No. 319

Division 3

 

r. 7.5.15....................................

ad. 2001 No. 319

r. 7.5.16....................................

ad. 2001 No. 319

 

am. 2004 No. 26

r. 7.5.17....................................

ad. 2001 No. 319

Division 4

 

Subdivision 4.1

 

r. 7.5.18....................................

ad. 2001 No. 319

r 7.5.18A..................................

ad F2019L01474

Subdivision 4.2

 

r. 7.5.19....................................

ad. 2001 No. 319

 

am. 2002 No. 282; 2004 No 26 and 398; 2005 No. 38

Subdivision 4.3

 

r. 7.5.20....................................

ad. 2001 No. 319

 

rep. 2005 No. 38

r. 7.5.21....................................

ad. 2001 No. 319

 

rep. 2005 No. 38

r. 7.5.22....................................

ad. 2001 No. 319

 

rep. 2005 No. 38

r. 7.5.23....................................

ad. 2001 No. 319

 

rep. 2005 No. 38

r. 7.5.24....................................

ad. 2001 No. 319

 

am. 2002 No. 16; 2004 No 26 and 398

r. 7.5.25....................................

ad. 2001 No. 319

 

am. 2002 No. 16; 2004 No 26 and 398

r. 7.5.26....................................

ad. 2001 No. 319

 

am. 2002 No. 16; 2004 No 26 and 398

r. 7.5.27....................................

ad. 2001 No. 319

 

am. 2002 No. 16; 2004 No 26 and 398

r. 7.5.28....................................

ad. 2001 No. 319

 

am. 2005 No. 38

r. 7.5.29....................................

ad. 2001 No. 319

 

am. 2005 No. 38

r 7.5.30.....................................

ad No 319, 2001

 

am No 16, 2002; No 38, 2005; F2023L01423

r. 7.5.31....................................

ad. 2001 No. 319

 

rep. 2005 No. 38

r. 7.5.32....................................

ad. 2001 No. 319

 

rep. 2002 No. 282

Subdivision 4.4.........................

rep. 2005 No. 38

r. 7.5.33....................................

ad. 2001 No. 319

 

rep. 2005 No. 38

r. 7.5.34....................................

ad. 2001 No. 319

 

rep. 2005 No. 38

r. 7.5.35....................................

ad. 2001 No. 319

 

rep. 2005 No. 38

r. 7.5.36....................................

ad. 2001 No. 319

 

rep. 2005 No. 38

r. 7.5.37....................................

ad. 2001 No. 319

 

rep. 2005 No. 38

r. 7.5.38....................................

ad. 2001 No. 319

 

rep. 2005 No. 38

r. 7.5.39....................................

ad. 2001 No. 319

 

rep. 2002 No. 282

Subdivision 4.5.........................

rep. 2005 No. 38

r. 7.5.40....................................

ad. 2001 No. 319

 

am. 2002 No. 282

 

rep. 2005 No. 38

r. 7.5.41....................................

ad. 2001 No. 319

 

am. 2002 No. 282

 

rep. 2005 No. 38

r. 7.5.42....................................

ad. 2001 No. 319

 

rep. 2005 No. 38

r. 7.5.43....................................

ad. 2001 No. 319

 

rep. 2005 No. 38

r. 7.5.44....................................

ad. 2001 No. 319

 

rep. 2005 No. 38

r. 7.5.45....................................

ad. 2001 No. 319

 

am. 2002 No. 282

 

rep. 2005 No. 38

r. 7.5.46....................................

ad. 2001 No. 319

 

am. 2002 No. 16

 

rep. 2005 No. 38

r. 7.5.47....................................

ad. 2001 No. 319

 

rep. 2002 No. 282

Subdivision 4.6.........................

rep. 2002 No. 282

r. 7.5.48....................................

ad. 2001 No. 319

 

rep. 2002 No. 282

r. 7.5.49....................................

ad. 2001 No. 319

 

rep. 2002 No. 282

r. 7.5.50....................................

ad. 2001 No. 319

 

rep. 2002 No. 282

r. 7.5.51....................................

ad. 2001 No. 319

 

rep. 2002 No. 282

r. 7.5.52....................................

ad. 2001 No. 319

 

am. 2002 No. 16

 

rep. 2002 No. 282

Subdivision 4.7

 

r. 7.5.53....................................

ad. 2001 No. 319

r. 7.5.54....................................

ad. 2001 No. 319

r. 7.5.55....................................

ad. 2001 No. 319

r 7.5.56.....................................

ad No 319, 2001

 

am F2023L01423

r. 7.5.57....................................

ad. 2001 No. 319

r. 7.5.58....................................

ad. 2001 No. 319

r. 7.5.59....................................

ad. 2001 No. 319

Subdivision 4.8

 

r. 7.5.60....................................

ad. 2001 No. 319

r 7.5.61.....................................

ad No 319, 2001

 

am F2023L01423

r. 7.5.62....................................

ad. 2001 No. 319

r. 7.5.63....................................

ad. 2001 No. 319

Subdivision 4.9

 

r. 7.5.64....................................

ad. 2001 No. 319

 

am. 2002 No. 282

r. 7.5.65....................................

ad. 2001 No. 319

 

am. 2002 No. 282

r. 7.5.66....................................

ad. 2001 No. 319

r. 7.5.67....................................

ad. 2001 No. 319

r. 7.5.68....................................

ad. 2001 No. 319

 

am. 2002 No 16 and 282; 2004 No 26 and 398

r. 7.5.69....................................

ad. 2001 No. 319

r 7.5.70.....................................

ad No 319, 2001

 

am F2023L01423

r. 7.5.71....................................

ad. 2001 No. 319

 

am. 2002 No. 16; 2005 No. 38

 

rep F2019L01474

Subdivision 4.10

 

r. 7.5.72....................................

ad. 2001 No. 319

r 7.5.72A..................................

ad F2019L01474

r 7.5.72B...................................

ad F2019L01474

r. 7.5.73....................................

ad. 2001 No. 319

r. 7.5.74....................................

ad. 2001 No. 319

 

am. 2005 No. 38

r. 7.5.75....................................

ad. 2001 No. 319

 

am 2002 No 16; F2019L01474

r. 7.5.76....................................

ad. 2001 No. 319

r. 7.5.77....................................

ad. 2001 No. 319

r. 7.5.78....................................

ad. 2001 No. 319

r. 7.5.79....................................

ad. 2001 No. 319

r. 7.5.80....................................

ad. 2001 No. 319

r. 7.5.81....................................

ad. 2001 No. 319

 

am. 2002 No. 282; 2004 No 26 and 398; 2005 No. 38

r. 7.5.82....................................

ad. 2001 No. 319

r. 7.5.83....................................

ad. 2001 No. 319

 

am. 2004 No. 26

r. 7.5.84....................................

ad. 2001 No. 319

Subdivision 4.11

 

r. 7.5.85....................................

ad. 2001 No. 319

 

rs. 2002 No. 16

 

am. 2004 No 26 and 398

r 7.5.85A..................................

ad F2019L00374

Division 5

 

r. 7.5.86....................................

ad. 2001 No. 319

r. 7.5.87....................................

ad. 2001 No. 319

r. 7.5.88....................................

ad. 2001 No. 319

 

am. 2002 No. 145; 2010 No. 301

r. 7.5.89....................................

ad. 2001 No. 319

r. 7.5.90....................................

ad. 2001 No. 319

 

am. 2002 No. 145

r. 7.5.91....................................

ad. 2001 No. 319

r. 7.5.92....................................

ad. 2001 No. 319

 

am. 2002 No 126 and 145

r. 7.5.93....................................

ad. 2001 No. 319

Part 7.5A

 

Part 7.5A...................................

ad. No. 150, 2013

Division 2

 

Subdivision 2.1

 

r. 7.5A.30.................................

ad. No. 150, 2013

 

am No 88, 2014

 

(2)(a)-(i) exp end of 30 June 2015 (r 7.5A.30(3))

 

am No 157, 2015

r 7.5A.50..................................

ad No 191, 2013

 

am No 185, 2014; No 157, 2015

Subdivision 2.1A

 

Subdivision 2.1A......................

ad No 157, 2015

r 7.5A.60..................................

ad No 157, 2015

 

am F2018L01144; F2022L00469

r 7.5A.61..................................

ad No 157, 2015

r 7.5A.62..................................

ad No 157, 2015

r 7.5A.63..................................

ad No 157, 2015

 

am No 157, 2015

r 7.5A.64..................................

ad No 157, 2015

r 7.5A.65..................................

ad No 157, 2015

Subdivision 2.1B

 

Subdivision 2.1B......................

ad No 157, 2015

r 7.5A.70..................................

ad No 157, 2015

 

am F2018L01144; F2022L00469; F2023L01458

r 7.5A.71..................................

ad No 157, 2015

r 7.5A.72..................................

ad No 157, 2015

r 7.5A.73..................................

ad No 157, 2015

 

am F2018L01144; F2022L00469; F2022L01689

r 7.5A.74..................................

ad No 157, 2015

Subdivision 2.2

 

r 7.5A.101................................

ad No 191, 2013

Subdivision 2.3

 

r 7.5A.102................................

ad No 191, 2013

r 7.5A.103................................

ad No 191, 2013

r 7.5A.104................................

ad No 191, 2013

r 7.5A.105................................

ad No 191, 2013

r 7.5A.106................................

ad No 191, 2013

r 7.5A.107................................

ad No 191, 2013

r 7.5A.108................................

ad No 191, 2013

r 7.5A.109................................

ad No 191, 2013

r 7.5A.110................................

ad No 191, 2013

r 7.5A.111................................

ad No 191, 2013

r 7.5A.112................................

ad No 191, 2013

r 7.5A.113................................

ad No 191, 2013

r 7.5A.114................................

ad No 191, 2013

r 7.5A.115................................

ad No 191, 2013

Division 5

 

r 7.5A.150................................

ad No 191, 2013

r 7.5A.150A..............................

ad No 88, 2014

 

rs No 185, 2014

r 7.5A.150B..............................

ad No 88, 2014

 

rs No 185, 2014

 

am F2020L01610

r 7.5A.151................................

ad No 191, 2013

r 7.5A.200................................

ad No 191, 2013

Division 7

 

r 7.5A.250................................

ad No 191, 2013

Division 8

 

r 7.5A.270................................

ad No 191, 2013

Part 7.6

 

r 7.6.01.....................................

rs No 319, 2001

 

am No 16, 2002; No 41, 2002; No 53, 2002; No 85, 2003; No 126, 2003; No 127, 2003; No 202, 2003; No 282, 2003; No 368, 2003; No 25, 2004

 

(1)(r) exp end of 11 Mar 2004 (r 7.6.01(6))

 

am No 324, 2005; No 259, 2007; No 324, 2007; No 42, 2012; No 172, 2012; No 59, 2013; No 33, 2014

 

ed C125

 

am F2019L01533; F2020L00942; F2020L01586; F2022L01614; F2022L01629; F2023L01458

r 7.6.01AAAA..........................

ad F2021L00127

r 7.6.01AAAB...........................

ad F2021L00127

r. 7.6.01AAA............................

ad. 2010 No. 89

r. 7.6.01AA...............................

ad. 2008 No. 158

 

rep No 91, 2015

r 7.6.01AB................................

ad No 172, 2012

 

am F2019L00392; F2020L00942; F2021L01608; F2022L01614

r. 7.6.01A.................................

ad. 2002 No. 16

r 7.6.01B...................................

ad No 41, 2002

 

am F2019L01641

r. 7.6.01BA...............................

ad. No. 101, 2013

 

rep No 101, 2013

r 7.6.01C...................................

ad No 369, 2003

 

am F2023L01458

r. 7.6.02....................................

ad. 2001 No. 319

 

am. 2005 No. 31; 2009 No. 386; 2010 No. 88; F2018L00515

r 7.6.02AAA.............................

ad No 197, 2007

 

am F2018L00515; F2023L01458

r 7.6.02AA................................

ad No 26, 2004

 

am No 31, 2005; No 197, 2007; F2023L01423; F2023L01458

r. 7.6.02AB...............................

ad. 2005 No. 324

 

am No 102, 2014 (disallowed); No 108, 2015

r. 7.6.02AC...............................

ad. 2005 No. 324

 

am No 102, 2014 (disallowed); No 108, 2015

r 7.6.02AD................................

ad No 324, 2005

 

am No 102, 2014 (disallowed); No 108, 2015; F2023L01458

r. 7.6.02AE...............................

ad. 2005 No. 324

 

am No 102, 2014 (disallowed); No 108, 2015

r. 7.6.02AF...............................

ad. 2005 No. 324

 

am No 102, 2014 (disallowed); No 208, 2014

r 7.6.02AG................................

ad No 324, 2005

 

am No 42, 2012; No 59, 2013; F2018L01144; F2022L00469

r 7.6.02AGA.............................

ad No 42, 2012

 

rep F2022L01689

r. 7.6.02AH...............................

ad. 2005 No. 324

 

am. No. 59, 2013

r 7.6.02AI.................................

ad No 3, 2015

 

rep F2017L00117

r 7.6.02A..................................

ad No 369, 2003

 

am No 42, 2012; F2018L00515; F2021L01072; F2021L01854

r. 7.6.03....................................

ad. 2001 No. 319

r. 7.6.03A.................................

ad. 2003 No. 282

r. 7.6.03B..................................

ad. 2003 No. 282

r 7.6.03C...................................

ad F2019L00537

r 7.6.03D..................................

ad F2021L01801 (disallowed)

r 7.6.04.....................................

ad No 319, 2001

 

am No 16, 2002; No 41, 2002; No 101, 2013; No 155, 2013; No 135, 2015; F2019L01641; F2021L01608; F2022L00469; F2022L01614; F2023L01458

r 7.6.04AA................................

ad No 135, 2015

r. 7.6.04A.................................

ad. 2003 No. 369

 

am. 2005 No. 324; 2008 No. 158; No 91, 2015

r. 7.6.04B..................................

ad. 2004 No. 25

 

rep. 2005 No. 324

r. 7.6.05....................................

ad. 2001 No. 319

r. 7.6.06....................................

ad. 2001 No. 319

r 7.6.06A..................................

ad No 3, 2015

 

rep F2017L00117

r 7.6.06B...................................

ad No 3, 2015

 

rep F2017L00117

r 7.6.06C...................................

ad No 3, 2015

 

am F2017L00117

r 7.6.06D..................................

ad F2021L01854

r. 7.6.07....................................

ad. 2001 No. 319

r 7.6.07A..................................

ad F2018L01691

 

am F2023L01458

r 7.6.07B...................................

ad F2021L01854

r 7.6.07C...................................

ad F2022L01668

 

rep end of 30 June 2023 (r 7.6.07C(2))

Part 7.6A...................................

ad 2005 No 324

 

rep F2021L01841

r 7.6.08.....................................

ad 2005 No 324

 

rep F2021L01841

Part 7.6B

 

Part 7.6B...................................

ad. 2009 No. 387

r. 7.6.08A.................................

ad. 2009 No. 387

r 7.6.08B...................................

ad No 387, 2009

 

am F2023L01458

r. 7.6.08C..................................

ad. 2009 No. 387

r 7.6.08D..................................

ad No 387, 2009

 

am F2019L00392

r 7.6.08E...................................

ad No 387, 2009

 

am F2019L00392

Part 7.7

 

Division 1

 

r. 7.7.01....................................

rs. 2001 No. 319

 

am. 2002 No 16 and 41; 2003 No. 282

Division 2

 

r 7.7.02.....................................

rs No 319, 2001

 

am No 41, 2002; No 53, 2002; No 31, 2003; No 85, 2003; No 202, 2003; No 368, 2003; No 25, 2004; No 324, 2005; No 324, 2007; No 158, 2008; No 91, 2015; F2023L01458

r. 7.7.02A.................................

ad. 2005 No. 324

r. 7.7.03....................................

ad. 2001 No. 319

r 7.7.03A..................................

ad No 197, 2007

 

am F2023L01458

r. 7.7.04....................................

ad. 2001 No. 319

 

am. 2003 No. 202; 2005 No. 324; 2010 No. 88

r. 7.7.04A.................................

ad. 2005 No. 324

r. 7.7.04AA...............................

ad. 2012 No. 170

r. 7.7.04AB...............................

ad. 2012 No. 170

r. 7.7.05....................................

ad. 2001 No. 319

 

rs. 2003 No. 369

 

am. 2005 No. 324

r. 7.7.05A.................................

ad. 2002 No. 16

 

am. 2003 No. 85

r. 7.7.05B..................................

ad. 2003 No. 85

 

rs. 2004 No. 25

 

am. 2005 No. 324; 2007 No. 324

r. 7.7.05C..................................

ad. 2004 No. 25

r. 7.7.06....................................

ad. 2001 No. 319

r. 7.7.06A.................................

ad. 2004 No. 25

r 7.7.06B...................................

ad No 197, 2007

 

am F2023L01458

r. 7.7.07....................................

ad. 2001 No. 319

 

am. 2003 No. 202; 2005 No. 324; 2010 No. 88

r. 7.7.07A.................................

ad. 2005 No. 324

r. 7.7.08....................................

ad. 2001 No. 319

 

rs. 2003 No. 369

 

am. 2005 No. 324

Division 2A

 

Division 2A..............................

ad No 369, 2003

r 7.7.08A..................................

ad No 369, 2003

 

am No 158, 2008; No 135, 2010; No 91, 2015; F2022L00469; F2023L01458

Division 2AA

 

Division 2AA............................

ad. 2010 No. 89

r. 7.7.08B..................................

ad. 2010 No. 89

Division 2B

 

Division 2B...............................

ad. 2007 No. 324

r. 7.7.08C..................................

ad. 2007 No. 324

Division 3

 

r. 7.7.09....................................

ad. 2001 No. 319

 

am. 2003 No. 369

 

rs. 2005 No. 324

 

am. 2010 No. 135

r 7.7.09A..................................

ad 2007 No 324

 

am F2022L00469

r. 7.7.09AA...............................

ad. 2010 No. 89

r. 7.7.09AB...............................

ad. 2010 No. 89

r. 7.7.09B..................................

ad. 2007 No. 259

 

am. 2012 No. 268

r. 7.7.09BA...............................

ad. 2010 No. 89

r. 7.7.09BB...............................

ad. 2010 No. 89

r. 7.7.09BC...............................

ad. 2012 No. 170

r. 7.7.09BD...............................

ad. 2012 No. 170

r. 7.7.09C..................................

ad. 2007 No. 259

r. 7.7.10....................................

ad. 2001 No. 319

 

rs. 2003 No. 202

 

am. 2005 No. 324; 2008 No. 158; No 91, 2015

r. 7.7.10AA...............................

ad. 2005 No. 324

r. 7.7.10AAA............................

ad. 2007 No. 324

r. 7.7.10AB...............................

ad. 2005 No. 324

r. 7.7.10AC...............................

ad. 2005 No. 324

r. 7.7.10AD...............................

ad. 2005 No. 324

r. 7.7.10AE...............................

ad. 2005 No. 324

r 7.7.10AF................................

ad No 324, 2005

 

am F2019L00392

r 7.7.10AG................................

ad No 324, 2005

 

am F2019L00392

r 7.7.10AH................................

ad 2005 No 324

 

rep F2021L01841

r. 7.7.10AI................................

ad. 2012 No. 42

r. 7.7.10A.................................

ad. 2004 No. 149

r 7.7.10B...................................

ad. No 324, 2005

 

am F2023L01458

r 7.7.10C...................................

ad No 324, 2005

 

am F2023L01458

r. 7.7.10D.................................

ad. 2005 No. 324

r. 7.7.10E..................................

ad. 2005 No. 324

r. 7.7.11....................................

ad. 2001 No. 319

 

am No 202, 2003; No 149, 2004

r. 7.7.11A.................................

ad. 2004 No. 25

r. 7.7.11B..................................

ad. 2004 No. 149

r. 7.7.12....................................

ad. 2001 No. 319

 

am No 202, 2003; No 149, 2004

r. 7.7.13....................................

ad. 2004 No. 149

r. 7.7.13A.................................

ad. 2004 No. 149

r. 7.7.13B..................................

ad. 2004 No. 149

Division 4

 

Division 4.................................

ad. 2003 No. 369

r. 7.7.14....................................

ad. 2003 No. 369

Division 5

 

Division 5.................................

ad. 2003 No. 369

r. 7.7.20....................................

ad. 2003 No. 369

r 7.7.20A..................................

ad No 130, 2008

 

am No 55, 2010; F2019L00392

Division 6

 

Division 6.................................

ad. 2005 No. 324

r. 7.7.21....................................

ad. 2005 No. 324

 

rs. No. 172, 2012

Part 7.7A

 

Part 7.7A...................................

ad. 2012 No. 170

 

am No 108, 2015

Division 2

 

Division 2.................................

ad. 2012 No. 268

Subdivision 1 heading...............

rep No 102, 2014 (disallowed); No 108, 2015

r. 7.7A.1...................................

ad. 2012 No. 268

 

rep No 102, 2014 (disallowed); No 108, 2015

r 7.7A.05..................................

ad No 108, 2015

r 7.7A.06..................................

ad No 108, 2015

r 7.7A.07..................................

ad No 108, 2015

 

rep F2023L01458

r 7.7A.2....................................

ad No 102, 2014 (disallowed)

r 7.7A.3....................................

ad No 102, 2014 (disallowed)

r 7.7A.4....................................

ad No 102, 2014 (disallowed)

r 7.7A.5....................................

ad No 102, 2014 (disallowed)

r 7.7A.6....................................

ad No 102, 2014 (disallowed)

r 7.7A.7....................................

ad No 102, 2014 (disallowed)

r 7.7A.8....................................

ad No 102, 2014 (disallowed)

Division 3

 

Division 3.................................

ad. 2012 No. 170

r 7.7A.10..................................

ad No 170, 2012

 

am No 102, 2013; No 102, 2014 (disallowed); F2018L01144

r 7.7A.11..................................

ad No 170, 2012

 

am F2021L00581

 

rs F2021L00848

r 7.7A.11AA.............................

ad F2021L00581

Division 4

 

Division 4.................................

ad. 2012 No. 170

Subdivision 1

 

Subdivision 1............................

ad F2017L00212

r 7.7A.11A................................

ad F2017L00212

r 7.7A.11B................................

ad F2017L00212

r 7.7A.11C................................

ad F2017L00212

 

am F2023L01458

r 7.7A.11D................................

ad F2017L00212

 

am F2023L01458

Subdivision 2

 

Subdivision 1 heading...............

ad. 2012 No. 268

 

rs and renum F2017L00212

Subdivision 2 heading (prev
Subdivision 1 heading)

 

r 7.7A.12..................................

ad No 170, 2012

 

rs No 268, 2012

 

am No 102, 2014 (disallowed); No 108, 2015; F2023L01458

r. 7.7A.12A...............................

ad. 2012 No. 268

 

rep F2017L00212

r 7.7A.12B................................

ad 2012 No 268

 

rs No 102, 2014 (disallowed); No 208, 2014

 

am F2020L00834

r. 7.7A.12C...............................

ad. 2012 No. 268

r. 7.7A.12D...............................

ad. 2012 No. 268

 

am. No. 115, 2013; No 102, 2014 (disallowed); No 208, 2014

r. 7.7A.12E...............................

ad. 2012 No. 268

r. 7.7A.12EA............................

ad. No. 151, 2013

Subdivision 3

 

Subdivision 3............................

ad F2017L00212

r 7.7A.12EB..............................

ad No 102, 2014 (disallowed); F2017L00212

r 7.7A.12EC..............................

ad No 102, 2014 (disallowed); F2017L00212

Subdivision 4

 

Subdivision 2 heading...............

rs and renum F2017L00212

Subdivision 4 heading (prev
Subdivision 2 heading)

 

Subdivision 2............................

ad. 2012 No. 268

r 7.7A.12F................................

ad No 268, 2012

 

am F2023L01458

r 7.7A.12FA..............................

ad No 102, 2014 (disallowed)

r. 7.7A.12G...............................

ad. 2012 No. 268

r. 7.7A.12H...............................

ad. 2012 No. 268

 

am No 102, 2014 (disallowed); No 108, 2015

r. 7.7A.12I................................

ad. 2012 No. 268

 

am No 102, 2014 (disallowed)

r 7.7A.12J.................................

ad No 102, 2014 (disallowed)

r. 7.7A.13.................................

ad. 2012 No. 170

r. 7.7A.14.................................

ad. 2012 No. 170

r. 7.7A.15.................................

ad. 2012 No. 170

r 7.7A.15A................................

ad No 102, 2014 (disallowed); No 208, 2014

 

am F2023L01458

Subdivision 4A

 

Subdivision 4A.........................

ad F2019L01526

r 7.7A.15AJ..............................

ad F2019L01526

r 7.7A.15AK.............................

ad F2019L01526

Subdivision 5

 

Subdivision 5 heading...............

ad F2017L00212

 

rep F2019L01526

Subdivision 5............................

rep F2019L01526

r 7.7A.15B................................

ad No 102, 2014 (disallowed); No 208, 2014

 

rep F2019L01526

r 7.7A.16..................................

ad No 234, 2012

 

rs No 151, 2013

 

am No 102, 2014 (disallowed); No 208, 2014

 

rep F2019L01526

r 7.7A.16A................................

ad No 151, 2013

 

rep F2019L01526

r 7.7A.16B................................

ad No 151, 2013

 

am No 102, 2014 (disallowed)

 

rep F2019L01526

r 7.7A.16BA.............................

ad No 102, 2014 (disallowed); No 208, 2014

 

rep F2019L01526

r 7.7A.16C................................

ad No 151, 2013

 

am No 102, 2014 (disallowed); No 208, 2014

 

rep F2019L01526

r 7.7A.16D................................

ad No 151, 2013

 

rep F2019L01526

r 7.7A.16E................................

ad No 151, 2013

 

rep F2019L01526

r 7.7A.16F................................

ad No 151, 2013

 

am No 102, 2014 (disallowed); No 208, 2014

 

rep F2019L01526

Subdivision 6

 

Subdivision 6............................

ad F2017L00212

r 7.7A.16G................................

ad F2017L00212

r 7.7A.16H................................

ad F2017L00212

Subdivision 7

 

Subdivision 3 heading...............

rs and renum F2017L00212

Subdivision 7 heading (prev
Subdivision 3 heading)

 

Subdivision 3............................

ad. No. 115, 2013

r. 7.7A.17.................................

ad. No. 115, 2013

r. 7.7A.18.................................

ad. No. 115, 2013

Division 6

 

Division 6.................................

ad. No. 83, 2013

r. 7.7A.40.................................

ad. No. 83, 2013

Part 7.8

 

Division 2

 

Division 2 heading....................

ad F2018L00743

Subdivision A

 

Subdivision A heading..............

ad F2018L00743

r 7.8.01A..................................

ad F2016L01657

r. 7.8.01....................................

ad. 2001 No. 319

 

am. 2002 No 16 and 41; 2005 No. 31; 2009 No. 70; 2010 No. 210

r 7.8.02.....................................

ad No 319, 2001

 

am No 16, 2002; No 41, 2002; No 70, 2009; No 210, 2010; F2017L00455; F2019L00392

r 7.8.02A..................................

ad F2017L00455

r. 7.8.03....................................

ad. 2001 No. 319

r. 7.8.04....................................

ad. 2001 No. 319

r 7.8.05.....................................

ad No 319, 2001

 

am No 41, 2002; F2019L00392

Subdivision AA

 

Subdivision AA........................

ad F2018L00743

r 7.8.05A..................................

ad F2018L00743

r 7.8.05B...................................

ad F2018L00743

r 7.8.05C...................................

ad F2018L00743

r 7.8.05D..................................

ad F2018L00743

r 7.8.05E...................................

ad F2018L00743

r 7.8.05F...................................

ad F2018L00743

r 7.8.05G..................................

ad F2018L00743

 

am F2019L00392

r 7.8.05H..................................

ad F2018L00743

r 7.8.05J....................................

ad F2018L00743

r 7.8.05K..................................

ad F2018L00743

r 7.8.05L...................................

ad F2018L00743

r 7.8.05M..................................

ad F2018L00743

r 7.8.05N..................................

ad F2018L00743

r 7.8.05P...................................

ad F2018L00743

r 7.8.05Q..................................

ad F2018L00743

Subdivision B

 

Subdivision B heading..............

ad F2018L00743

r. 7.8.06....................................

ad. 2001 No. 319

Division 3

 

Division 3 heading....................

ad F2018L00743

r. 7.8.06A.................................

ad. 2010 No. 89

r 7.8.06B...................................

ad F2016L01657

r 7.8.07.....................................

ad No 319, 2001

 

am F2018L01144; F2023L01458

Division 4

 

Division 4 heading....................

ad F2018L00743

r 7.8.08.....................................

ad No 319, 2001

 

am No 16, 2002; No 41, 2002; F2018L01691; F2019L00392

Division 4A

 

Division 4A heading.................

ad F2018L00743

Subdivision A

 

Subdivision A heading..............

ad F2018L00743

r 7.8.08A..................................

ad No 89, 2010

 

am F2023L01458

r 7.8.08B...................................

ad No 89, 2010

 

am F2023L01458

r. 7.8.09....................................

ad No 319, 2001

 

am No 16, 2002

 

rep No 41, 2002

 

ad No 89, 2010

r. 7.8.09A.................................

ad No 89, 2010

r 7.8.10.....................................

ad No 319, 2001

 

rep No 41, 2002

 

ad No 89, 2010

 

am F2023L01458

r. 7.8.10A.................................

ad No 89, 2010

Division 6

 

Division 6 heading....................

ad F2018L00743

Subdivision B

 

Subdivision B heading..............

ad F2018L00743

r. 7.8.11....................................

ad. 2001 No. 319

r. 7.8.11A.................................

ad. 2012 No. 170

r 7.8.11B...................................

ad F2019L01526

r. 7.8.12....................................

ad. 2001 No. 319

 

am. 2002 No. 16

Subdivision C

 

Subdivision C heading..............

ad F2018L00743

r 7.8.12A..................................

ad No 101, 2013

 

am F2019L01641; F2023L01458

r 7.8.13.....................................

ad 2001 No 319

 

am 2003 No 202; No 101, 2013; F2021L01841

r. 7.8.13A.................................

ad. No. 101, 2013

r. 7.8.14....................................

ad. 2001 No. 319

 

am. No. 101, 2013

r. 7.8.14A.................................

ad. 2005 No. 31

Subdivision D

 

Subdivision D heading..............

ad F2018L00743

r 7.8.14B...................................

ad No 101, 2013

 

am F2019L01641; F2023L01458

r. 7.8.15....................................

ad. 2001 No. 319

 

am. 2003 No. 126

r. 7.8.16....................................

ad. 2001 No. 319

Division 7

 

Division 7 heading....................

ad F2018L00743

r. 7.8.17....................................

ad. 2001 No. 319

 

am. 2004 No. 25; 2010 No. 210

r. 7.8.18....................................

ad. 2001 No. 319

 

am. 2010 No. 210

r. 7.8.19....................................

ad. 2001 No. 319

r 7.8.20.....................................

ad No 319, 2001

 

am No 16, 2002; No 25, 2004; No 210, 2010; F2018L01144; F2023L01458

r 7.8.20A..................................

ad No 31, 2003

 

am F2023L01458

r. 7.8.21....................................

ad. 2001 No. 319

 

am. 2002 No. 41; 2003 No 202 and 282; 2004 No. 25

Division 8

 

Division 8 heading....................

ad F2018L00743

r 7.8.21A..................................

ad No 324, 2005

 

rs F2021L01080

 

am F2022L01614; F2022L01627; F2023L01458

r 7.8.21B...................................

ad No 42, 2012

 

rep F2021L01080

r 7.8.22.....................................

ad No 41, 2002

 

am No 265, 2002; No 31, 2003

 

rep F2021L01080

r 7.8.22A..................................

ad No 369, 2003

 

rep F2021L01080

r. 7.8.22B..................................

ad. 2008 No. 194

 

rep No 91, 2015

r 7.8.23.....................................

ad No 41, 2002

 

am F2021L01080; F2023L01458

r 7.8.24.....................................

ad No 41, 2002

 

am F2021L01080

r 7.8.25.....................................

ad No 41, 2002

 

am F2021L01080

r 7.8.26.....................................

ad No 172, 2012

 

am F2020L00942

 

rep F2021L01080

Part 7.8A

 

Part 7.8A...................................

ad F2019L01626

Division 1

 

r 7.8A.01..................................

ad F2019L01626

 

am F2023L01458

r 7.8A.02..................................

ad F2019L01626

 

am F2023L00193; F2023L01458

Division 2

 

r 7.8A.03..................................

ad F2019L01626

r 7.8A.04..................................

ad F2019L01626

 

rs F2023L01458

r 7.8A.05..................................

ad F2019L01626

r 7.8A.06..................................

ad F2019L01626

r 7.8A.07..................................

ad F2019L01626

 

am F2023L01458

r 7.8A.08..................................

ad F2019L01626

r 7.8A.09..................................

ad F2019L01626

r 7.8A.10..................................

ad F2019L01626

Division 3

 

r 7.8A.20..................................

ad F2019L01626

 

am F2023L00193

r 7.8A.25..................................

ad F2019L01626

Part 7.9

 

Division 1

 

r 7.9.01.....................................

ad No 319, 2001

 

am No 16, 2002; No 145, 2002; No 10, 2004; No 145, 2004; No 31, 2005; No 102, 2007; No 324, 2007; F2019L01641; F2023L00990; F2023L01458

r. 7.9.02....................................

ad. 2001 No. 319

 

am. 2002 No. 16

r. 7.9.02A.................................

ad. 2002 No. 16

 

am. 2003 No. 282

 

rs. 2005 No. 324

r. 7.9.02B..................................

ad. 2002 No. 16

r. 7.9.02C..................................

ad. 2003 No. 202

 

rep. 2003 No. 369

Division 2

 

Division 2 heading....................

am F2023L01458

Subdivision 2.1

 

r 7.9.03.....................................

ad No 319, 2001

 

am F2023L01458

Subdivision 2.2

 

r 7.9.04.....................................

ad No 319, 2001

 

rs No 16, 2002

 

am No 145, 2002; No 202, 2003; No 282, 2003; No 145, 2004; F2017L00321; F2019L01641

Subdivision 2.3

 

Subdivision 2.3 heading............

am F2023L01458

r 7.9.05.....................................

ad No 319, 2001

 

am F2023L01458

Subdivision 2.4

 

Subdivision 2.4 heading............

rs. 2002 No. 16

r. 7.9.06....................................

ad. 2001 No. 319

 

rep. 2002 No. 41

r 7.9.06A..................................

ad No 16, 2002

 

am F2022L01689

r 7.9.06B...................................

ad No 16, 2002

 

am F2023L01458

Subdivision 2.5

 

r. 7.9.07....................................

ad. 2001 No. 319

 

am. 2002 No. 41

Subdivision 2.6.........................

rep. 2004 No. 145

r. 7.9.07AA...............................

ad. 2002 No. 145

 

rep. 2004 No. 145

Division 2A

 

Division 2A..............................

ad. 2002 No. 16

r. 7.9.07A.................................

ad. 2002 No. 16

Division 2B

 

Division 2B...............................

ad. 2002 No. 16

r. 7.9.07B..................................

ad. 2002 No. 16

r. 7.9.07C..................................

ad. 2002 No. 16

 

am. 2002 No. 41; 2009 No. 70

Division 2BA

 

r 7.9.07CA................................

ad No 130, 2008

 

am F2019L00392

Division 2C

 

Division 2C...............................

ad. 2003 No. 31

r. 7.9.07D.................................

ad. 2003 No. 31

 

am 2003 No. 282

r. 7.9.07E..................................

ad. 2003 No. 282

r. 7.9.07F..................................

ad. 2003 No. 282

r 7.9.07FA................................

ad 2005 No 324

 

rs 2010 No 55

 

am F2021L01841

r. 7.9.07FB................................

ad. 2005 No. 324

r 7.9.07FC.................................

ad No 324, 2005

 

am F2023L01458

Division 2D

 

Division 2D..............................

ad. 2003 No. 368

r. 7.9.07J...................................

ad. 2003 No. 368

r. 7.9.07K.................................

ad. 2005 No. 324

 

rs. 2007 No. 324

Division 2E

 

Division 2E...............................

ad. No. 155, 2013

Subdivision 2E.1

 

r. 7.9.07L..................................

ad. No. 155, 2013

r. 7.9.07M.................................

ad. No. 155, 2013

r. 7.9.07N.................................

ad. No. 155, 2013

r. 7.9.07P..................................

ad. No. 155, 2013

r. 7.9.07Q.................................

ad. No. 155, 2013

r. 7.9.07R..................................

ad. No. 155, 2013

r. 7.9.07S..................................

ad. No. 155, 2013

r. 7.9.07T..................................

ad. No. 155, 2013

r. 7.9.07U.................................

ad. No. 155, 2013

r. 7.9.07V.................................

ad. No. 155, 2013

r. 7.9.07W.................................

ad. No. 155, 2013

Subdivision 2E.2

 

Subdivision 2E.2......................

ad F2021L01531

7.9.07Z.....................................

ad F2021L01531

7.9.07ZA..................................

ad F2021L01531

Subdivision 2E.3

 

Subdivision 2E.3......................

ad F2023L00990

r 7.9.07ZB................................

ad F2023L00990

 

am F2023L01458

r 7.9.07ZC................................

ad F2023L00990

Division 3

 

r. 7.9.08....................................

ad. 2001 No. 319

 

am. 2002 No. 41; 2005 No. 31

r. 7.9.08A.................................

ad. 2002 No. 41

r. 7.9.08B..................................

ad. 2002 No. 41

r 7.9.08C...................................

ad No 282, 2003

 

am F2023L01458

r. 7.9.08D.................................

ad. 2005 No. 31

Division 3A..............................

ad. 2008 No. 194

 

rep No 91, 2015

r. 7.9.08E..................................

ad. 2008 No. 194

 

rep No 91, 2015

Division 4

 

Subdivision 4.1

 

r 7.9.09.....................................

ad No 319, 2001

 

am No 16, 2002; No 158, 2008; No 135, 2010; No 91, 2015; F2022L00469; F2023L01458

Subdivision 4.1A

 

Subdivision 4.1A......................

ad. 2012 No. 42

r 7.9.09A..................................

ad 2012 No 42

 

am F2022L00469

r. 7.9.09B..................................

ad. 2012 No. 42

r. 7.9.09C..................................

ad. 2012 No. 42

Subdivision 4.2.........................

ad. 2008 No. 158

 

rep No 91, 2015

r. 7.9.10....................................

ad No 319, 2001 (Sch 1 item 15 disallowed)

 

rs No 16, 2002 (Sch 1 item 78 disallowed)

 

ad No 158, 2008

 

rep No 91, 2015

r. 7.9.10A.................................

ad. 2008 No. 158

 

am 2011 No 66

 

rep No 91, 2015

r. 7.9.10B..................................

ad. 2008 No. 158

 

rep No 91, 2015

r. 7.9.10C..................................

ad. 2008 No. 158

 

rep No 91, 2015

r. 7.9.10D.................................

ad. 2008 No. 158

 

rs. 2008 No. 194

 

rep No 91, 2015

r. 7.9.10E..................................

ad. 2008 No. 158

 

am. 2008 No. 194

 

rep No 91, 2015

Subdivision 4.2A

 

Subdivision 4.2A heading.........

am F2023L01458

Subdivision 4.2A......................

ad. 2010 No. 135

r 7.9.11.....................................

ad No 319, 2001 (Sch 1 item 15 disallowed)

 

am No 16, 2002 (Sch 1 items 79-82 disallowed)

 

ad No 135, 2010

 

am F2022L00469; F2023L01458

r 7.9.11A..................................

ad No 135, 2010

 

am F2023L01458

r 7.9.11B...................................

ad No 135, 2010

 

am F2023L01458

r 7.9.11C...................................

ad No 135, 2010

 

am F2023L01458

r 7.9.11D..................................

ad No 135, 2010

 

am F2023L01458

r 7.9.11E...................................

ad No 135, 2010

 

am No 274, 2011; F2023L01458

r 7.9.11F...................................

ad No 135, 2010

 

am F2023L01458

r 7.9.11G..................................

ad No 135, 2010

 

am F2023L01458

r 7.9.11H..................................

ad No 135, 2010

 

am F2023L01458

Subdivision 4.2B

 

Subdivision 4.2B......................

ad. 2010 No. 135

r 7.9.11K..................................

ad 2010 No 135

 

am 2011 No 274; F2022L00469

r. 7.9.11L..................................

ad. 2010 No. 135

r 7.9.11LA................................

ad No 26, 2013

 

am F2023L01458

r 7.9.11LB................................

ad No 26, 2013

 

am F2023L01458

r 7.9.11M..................................

ad No 135, 2010

 

am No 274, 2001; F2023L01458

r. 7.9.11N.................................

ad. 2010 No. 135

r. 7.9.11O.................................

ad. 2010 No. 135

r 7.9.11P...................................

ad No 135, 2010

 

am No 274, 2011; F2023L01458

r. 7.9.11Q.................................

ad. 2010 No. 135

r. 7.9.11R..................................

ad. 2010 No. 135

Subdivision 4.2C

 

Subdivision 4.2C......................

ad. 2010 No. 135

r 7.9.11S...................................

ad No 135, 2010

 

am F2018L01144; F2022L00469

r. 7.9.11T..................................

ad. 2010 No. 135

r 7.9.11U..................................

ad No 135, 2010

 

am No 274, 2011; F2023L01458

r. 7.9.11V.................................

ad. 2010 No. 135

r. 7.9.11W.................................

ad. 2010 No. 135

r. 7.9.11X.................................

ad. 2010 No. 135

 

am. 2011 No. 274

r. 7.9.11Y.................................

ad. 2010 No. 135

r. 7.9.11Z..................................

ad. 2010 No. 135

Subdivision 4.2D

 

Subdivision 4.2D......................

ad F2022L00469

r 7.9.11ZA................................

ad F2022L00469

r 7.9.11ZB................................

ad F2022L00469

r 7.9.11ZC................................

ad F2022L00469

r 7.9.11ZD................................

ad F2022L00469

r 7.9.11ZE................................

ad F2022L00469

r 7.9.11ZF.................................

ad F2022L00469

r 7.9.11ZG................................

ad F2022L00469

r 7.9.11ZH................................

ad F2022L00469

Subdivision 4.3

 

r 7.9.12.....................................

ad No 319, 2001

 

am No 16, 2002; No 31, 2005; F2023L01458

r. 7.9.12A.................................

ad. 2002 No. 145

 

am. 2004 No. 145

 

rep. 2004 No. 145

r 7.9.13.....................................

ad No 319, 2001

 

am No 16, 2002; F2019L00392

r. 7.9.13A.................................

ad. 2003 No. 31

 

rep. 2007 No. 324

 

ad. 2008 No. 194

 

rep No 91, 2015

r 7.9.14.....................................

ad No 319, 2001

 

am No 16, 2002; No 41, 2002; No 194, 2008; F2023L01458

r. 7.9.14A.................................

ad. 2002 No. 16

Subdivision 4.4

 

Subdivision 4.4 heading............

rs. 2002 No. 16

r 7.9.14B...................................

ad No 16, 2002

 

am F2019L00392

Division 4A

 

Division 4A heading.................

ad. 2002 No. 16

r. 7.9.14C..................................

ad. 2002 No. 16

r 7.9.14D..................................

ad 2010 No 55

 

am F2021L01841

r. 7.9.15....................................

ad. 2001 No. 319

 

am. 2003 No. 202; 2010 No. 55

r. 7.9.15A.................................

ad. 2004 No. 149

r. 7.9.15B..................................

ad. 2004 No. 149

r. 7.9.15C..................................

ad. 2004 No. 149

 

am. 2007 No. 259

r. 7.9.15CA...............................

ad. 2010 No. 55

r. 7.9.15D.................................

ad. 2005 No. 324

r 7.9.15DA................................

ad No 259, 2007

 

am No 135, 2010; F2022L00469; F2023L01458

r 7.9.15DB................................

ad No 259, 2007

 

am No 135, 2010; F2022L00469; F2023L01458

r 7.9.15DC................................

ad No 259, 2007

 

am No 135, 2010; F2022L00469; F2023L01458

r. 7.9.15E..................................

ad. 2005 No. 324

r. 7.9.15F..................................

ad. 2005 No. 324

r. 7.9.15FA...............................

ad. 2007 No. 259

r 7.9.15G..................................

ad 2005 No 324

 

rep F2021L01841

r. 7.9.15H.................................

ad. 2005 No. 324

r. 7.9.15I...................................

ad. 2005 No. 324

r. 7.9.16....................................

ad. 2001 No. 319

r 7.9.16A..................................

ad No 41, 2002

 

am F2018L01144

Division 4B

 

Division 4B...............................

ad. 2003 No. 369

r. 7.9.16G.................................

ad. 2003 No. 369

 

am. No. 26, 2013

Division 4C

 

Division 4C...............................

ad. 2005 No. 31

Subdivision 4C.1

 

r 7.9.16J....................................

ad No 31, 2005

 

am F2018L01144; F2019L01641; F2022L00469

r 7.9.16JA.................................

ad 2005 No 139

 

am F2022L00469

r 7.9.16K..................................

ad 2005 No 31

 

am 2005 No 139; F2022L00469

Subdivision 4C.2

 

r 7.9.16L...................................

ad No 31, 2005

 

am No 135, 2010; F2022L00469 (Sch 3 items 12, 13 md not incorp); F2023L01458

r. 7.9.16M.................................

ad. 2005 No. 31

r. 7.9.16N.................................

ad. 2005 No. 31

Subdivision 4C.3

 

r. 7.9.16O.................................

ad. 2005 No. 31

Division 4D

 

Division 4D..............................

ad. 2007 No. 324

Subdivision 4D.1

 

r 7.9.16T...................................

ad. 2007 No. 324

Division 5

 

Subdivision 5.1

 

r. 7.9.17....................................

ad. 2001 No. 319

Subdivision 5.2

 

Subdivision 5.2 heading............

am F2023L01458

r. 7.9.18....................................

ad. 2001 No. 319

r 7.9.19.....................................

ad No 319, 2001

 

am No 16, 2002; No 282, 2003; No 149, 2004; F2019L01641; F2023L01458

r. 7.9.19A.................................

ad. 2004 No. 149

r. 7.9.19B..................................

ad. 2004 No. 149

r 7.9.20.....................................

ad No 319, 2001

 

am No 16, 2002; No 202, 2003; No 282, 2003; No 10, 2004; No 149, 2004; No 52, 2009; No 155, 2013; No 202, 2013; No 39, 2015; F2017L00321

r 7.9.20AA................................

ad 2009 No 52

 

am F2021L01841

r. 7.9.20A.................................

ad. 2004 No. 149

r. 7.9.20B..................................

ad. 2004 No. 149

r. 7.9.21....................................

ad. 2001 No. 319

r. 7.9.22....................................

ad. 2001 No. 319

r. 7.9.23....................................

ad. 2001 No. 319

r. 7.9.24....................................

ad. 2001 No. 319

Subdivision 5.3

 

r. 7.9.25....................................

ad. 2001 No. 319

r. 7.9.26....................................

ad. 2001 No. 319

 

am. 2002 No. 16; 2004 No. 10

r. 7.9.27....................................

ad. 2001 No. 319

r. 7.9.28....................................

ad. 2001 No. 319

 

am. 2002 No. 16

Subdivision 5.4

 

Subdivision 5.4 heading............

rs. 2002 No. 16

r. 7.9.29....................................

ad. 2001 No. 319

r. 7.9.30....................................

ad. 2001 No. 319

 

am. 2002 No. 16

Subdivision 5.4A

 

Subdivision 5.4A......................

ad. 2010 No. 89

r 7.9.30A..................................

ad No 89, 2010

 

am F2023L01458

r. 7.9.30B..................................

ad. 2010 No. 89

Subdivision 5.5

 

r. 7.9.31....................................

ad. 2001 No. 319

r 7.9.31A..................................

ad F2023L00990

r 7.9.32.....................................

ad No 319, 2001

 

am No 16, 2002; F2023L00990

r 7.9.33.....................................

ad No 319, 2001

 

am F2023L00990

Subdivision 5.6

 

Subdivision 5.6 heading............

am F2023L01458

r. 7.9.34....................................

ad. 2001 No. 319

r 7.9.35.....................................

ad No 319, 2001

 

am F2023L00990

r 7.9.36.....................................

ad No 319, 2001

 

am F2023L00990

r 7.9.37.....................................

ad No 319, 2001

 

am No 52, 2009; F2023L00990

r 7.9.38.....................................

ad No 319, 2001

 

rep F2023L00990

r. 7.9.39....................................

ad. 2001 No. 319

Subdivision 5.7

 

r. 7.9.40....................................

ad. 2001 No. 319

r 7.9.41.....................................

ad No 319, 2001

 

am F2023L00990

r 7.9.42.....................................

ad No 319, 2001

 

am No 16, 2002; F2023L00990

Subdivision 5.8

 

r 7.9.43.....................................

ad No 319, 2001

 

am F2023L01458

r 7.9.44.....................................

ad No 319, 2001

 

am No 41, 2002; F2023L01458

Subdivision 5.8A

 

Subdivision 5.8A......................

ad F2019L00539

r 7.9.44A..................................

ad F2019L00539

r 7.9.44B...................................

ad F2019L00539

r 7.9.44C...................................

ad F2019L00539

Subdivision 5.9

 

r 7.9.45.....................................

ad No 319, 2001

 

am No 16, 2002; F2023L00990; F2023L01458

r. 7.9.46....................................

ad. 2001 No. 319

Subdivision 5.10

 

r. 7.9.47....................................

ad. 2001 No. 319

Subdivision 5.11.......................

rep F2018L00515

r. 7.9.48....................................

ad. 2001 No. 319

 

am. 2002 No. 16

 

rs. No. 155, 2013

 

rep F2018L00515

r. 7.9.48A (first occurring)........

ad. No. 155, 2013

 

rep F2018L00515

r. 7.9.48B (first occurring)........

ad. No. 155, 2013

 

rep F2018L00515

r. 7.9.48C..................................

ad. No. 155, 2013

 

rep F2018L00515

r. 7.9.48D.................................

ad. No. 155, 2013

 

rep F2018L00515

r. 7.9.48A (second occurring)...

ad. No. 155, 2013

 

rep F2018L00515

r. 7.9.48B (second occurring)...

ad. No. 155, 2013

 

rep F2018L00515

Subdivision 5.12

 

Subdivision 5.12 heading..........

am F2023L01458

r 7.9.49.....................................

ad No 319, 2001

 

am F2023L01458

r 7.9.50.....................................

ad No 319, 2001

 

am F2022L01689

r. 7.9.51....................................

ad. 2001 No. 319

r 7.9.52.....................................

ad No 319, 2001

 

am No 16, 2002; F2023L01458

r 7.9.53.....................................

ad No 319, 2001

 

am F2023L01458

r. 7.9.54....................................

ad. 2001 No. 319

r. 7.9.55....................................

ad. 2001 No. 319

r 7.9.56.....................................

ad No 319, 2001

 

am F2023L01458

r 7.9.57.....................................

ad No 319, 2001

 

am F2023L01458

r. 7.9.58....................................

ad. 2001 No. 319

r. 7.9.59....................................

ad. 2001 No. 319

r. 7.9.60....................................

ad. 2001 No. 319

Subdivision 5.13 heading..........

rep. 2003 No. 368

Division 5AA

 

Division 5AA heading...............

ad. 2003 No. 368

r. 7.9.61....................................

ad. 2001 No. 319

renumbered r. 7.6.60A..............

2005 No. 31

r 7.9.60B...................................

ad No 31, 2005

 

am No 139, 2005; F2018L01144; F2022L00469

Division 5AB

 

Division 5AB............................

ad. 2005 No. 324

r 7.9.61AA................................

ad No 324, 2005

 

am F2019L01641; F2023L01458

Division 5A

 

Division 5A..............................

ad. 2002 No. 16

r. 7.9.61A.................................

ad. 2002 No. 16

r. 7.9.61B..................................

ad. 2002 No. 16

r. 7.9.61C..................................

ad. 2002 No. 16

 

rs. 2003 No. 31

Division 5B

 

Division 5B...............................

ad. 2002 No. 16

r 7.9.61D..................................

ad No 16, 2002

 

am No 41, 2002; No 202, 2003; F2023L01458

Division 5C

 

Division 5C...............................

ad. 2012 No. 267

r 7.9.61E...................................

ad No 267, 2012

 

rs F2023L01458

Division 6

 

r 7.9.62.....................................

ad No 319, 2001

 

am No 16, 2002; No 41, 2002; No 31, 2003; No 202, 2003; No 10, 2004; No 158, 2008; No 91, 2015; F2018L01144; F2021L00127; F2023L01458

r. 7.9.63....................................

ad. 2001 No. 319

r. 7.9.63A.................................

ad. 2002 No. 16

r. 7.9.63B..................................

ad. 2002 No. 16

 

am. 2002 No. 41; 2004 No. 25; 2009 No. 70

r. 7.9.63C..................................

ad. 2002 No. 16

 

am. 2010 No. 210

r 7.9.63D..................................

ad No 16, 2002

 

am F2023L01458

r. 7.9.63E..................................

ad. 2002 No. 16

r. 7.9.63F..................................

ad. 2002 No. 41

r. 7.9.63G.................................

ad. 2002 No. 41

r. 7.9.63H.................................

ad. 2002 No. 41

r. 7.9.63I...................................

ad. 2002 No. 126

Division 7

 

r 7.9.64.....................................

ad No 391, 2001

 

am No 16, 2002; No 41, 2002; No 202, 2003; F2018L01144; F2022L00469; F2023L01458

r. 7.9.64A.................................

ad. 2002 No. 41

r. 7.9.65....................................

ad No. 319, 2001

 

am No. 41, 2002; No. 31, 2003; No 194, 2008; F2018L01144

r. 7.9.65A.................................

ad. 2008 No. 194

 

rep No 91, 2015

r 7.9.66.....................................

ad No 319, 2001

 

am No 16, 2002; No 41, 2002; No 194, 2008; F2023L01458

r 7.9.67.....................................

ad No 319, 2001

 

am No 16, 2002; No 41, 2002; F2018L01144; F2022L00469; F2023L01458

r. 7.9.68....................................

ad. 2001 No. 319

 

am. 2002 No 16 and 41

r. 7.9.68A.................................

ad. 2002 No. 145

 

am. 2004 No. 145

 

rep. 2004 No. 145

r 7.9.69.....................................

ad 2001 No 319

 

am 2002 No 16; F2018L01144; F2022L00469

r 7.9.70.....................................

ad No 319, 2001

 

am F2018L01144; F2022L00469

Division 8

 

r. 7.9.71....................................

ad. 2001 No. 319

 

am. 2002 No. 16

r. 7.9.71A.................................

ad. 2003 No. 202

r 7.9.72.....................................

ad No 319, 2001

 

am No 149, 2004; No 31, 2005; F2023L01458

r. 7.9.72A.................................

ad. 2002 No. 16

 

rep. 2005 No. 31

r. 7.9.73....................................

ad. 2001 No. 319

r. 7.9.74....................................

ad. 2001 No. 319

 

am. 2002 No 16 and 145; 2004 No. 145

r. 7.9.74A.................................

ad. 2004 No. 149

r. 7.9.74B..................................

ad. 2008 No. 158

 

am. 2011 No. 272

 

rep No 91, 2015

r 7.9.75.....................................

ad No 319, 2001

 

rs No 282, 2003

 

am No 149, 2004; No 31, 2005; No 139, 2005; F2018L01144; F2019L01641

r 7.9.75A..................................

ad No 126, 2002

 

am F2023L00990

r. 7.9.75B..................................

ad. 2002 No. 126

r 7.9.75BA................................

ad No 52, 2009

 

am F2021L01841

 

rep F2023L00990

r. 7.9.75C..................................

ad. 2004 No. 149

r. 7.9.75D.................................

ad. 2004 No. 149

r. 7.9.76....................................

ad. 2001 No. 319

r 7.9.77.....................................

ad 2001 No 319

 

am 2009 No 386; F2018L00515

r 7.9.77A..................................

ad F2019L00537

r. 7.9.78....................................

ad. 2001 No. 319

 

am. 2003 No. 202

r. 7.9.79....................................

ad. 2001 No. 319

 

rep. 2009 No. 12

r. 7.9.80....................................

ad. 2001 No. 319

 

rep. 2005 No. 324

r. 7.9.80A.................................

ad. 2002 No. 16

 

rep. 2009 No. 12

r 7.9.80B...................................

ad No 282, 2003

 

am F2023L01458

r. 7.9.80C..................................

ad. 2003 No. 368

 

rep. 2005 No. 324

r. 7.9.80D.................................

ad. 2003 No. 368

 

rep. 2005 No. 324

Division 9

 

Division 9.................................

ad. 2002 No. 16

r. 7.9.81....................................

ad. 2002 No. 16

r. 7.9.82....................................

ad. 2002 No. 16

Division 10...............................

ad. 2002 No. 16

 

rep. 2003 No. 369

r. 7.9.83....................................

ad. 2002 No. 16

 

rep. 2003 No. 369

Division 11

 

Division 11...............................

ad. 2002 No. 16

r 7.9.84.....................................

ad 2002 No 16

 

am F2020L01610

r. 7.9.85....................................

ad. 2002 No. 16

r 7.9.86.....................................

ad No 16, 2002

 

am F2023L01458

r. 7.9.87....................................

ad. 2002 No. 16

r 7.9.88.....................................

ad 2002 No 16

 

am 2003 No 368; F2020L01610

r 7.9.89.....................................

ad No 16, 2002

 

am No 368, 2003; F2023L01458

r 7.9.90.....................................

ad No 16, 2002

 

am F2023L01458

r 7.9.91.....................................

ad No 16, 2002

 

am F2023L01458

r 7.9.92.....................................

ad No 16, 2002

 

am F2023L01458

r. 7.9.93....................................

ad. 2002 No. 16

 

am. 2003 No. 368

r 7.9.94.....................................

ad No 16, 2002

 

am F2023L01458

Division 12

 

Division 12...............................

ad. 2003 No. 127

r. 7.9.95....................................

ad. 2003 No. 127

Division 13

 

Division 13...............................

ad. 2003 No. 369

Subdivision A

 

Subdivision A...........................

ad F2018L01379

r 7.9.95A..................................

ad F2018L01379

r 7.9.95B...................................

ad F2018L01379

r 7.9.95C...................................

ad F2018L01379

r 7.9.95D..................................

ad F2018L01379

Subdivision B

 

Subdivision B heading..............

ad F2018L01379

r. 7.9.96....................................

ad. 2003 No. 369

r. 7.9.97....................................

ad. 2005 No. 31

r. 7.9.97A.................................

ad. 2009 No. 103

Division 14

 

Division 14...............................

ad. 2005 No. 324

r. 7.9.98....................................

ad. 2005 No. 324

r 7.9.98A..................................

ad No 172, 2012

 

am F2020L00942; F2022L01614

Division 15

 

Division 15...............................

ad. 2009 No. 327

r. 7.9.99....................................

ad. 2009 No. 327

 

rs. 2009 No. 327

r. 7.9.100..................................

ad. 2009 No. 327

 

am. 2009 No. 327; 2011 No. 193

r. 7.9.100A...............................

ad. 2009 No. 327

r. 7.9.101..................................

ad. 2009 No. 327

 

am. 2011 No. 193

r. 7.9.102..................................

ad. 2009 No. 327

 

am. 2009 No. 327

Part 7.10

 

Part 7.10...................................

ad. 2002 No. 16

r 7.10.01...................................

rep No 319, 2001

 

ad No 16, 2002

 

rs F2023L01458

r 7.10.02...................................

ad No 102, 2006

 

am No 247, 2012; No 25, 2013; No 33, 2014; No 88, 2014

 

rs No 185, 2014

 

am No 92, 2015; No 134, 2015; F2016L00156; F2017L00595; F2018L00096; F2018L01393; F2019L00368; F2019L01351; F2020L00699; F2021L00520; F2021L01186; F2022L00350; F2022L00831; F2023L01394

r 7.10.03...................................

ad No 33, 2014

Part 7.10B

 

Part 7.10B.................................

ad F2023L00988

r 7.10B.50.................................

ad F2023L00988

r 7.10B.55.................................

ad F2023L00988

Part 7.11

 

Division 1

 

r 7.11.01...................................

rs No 319, 2001

 

am No 43, 2012; F2023L01458

r. 7.11.02..................................

ad. 2001 No. 319

 

rep. 2012 No. 43

r. 7.11.03..................................

ad. 2001 No. 319

r. 7.11.04..................................

ad. 2001 No. 319

r. 7.11.05..................................

ad. 2001 No. 319

r. 7.11.06..................................

ad. 2001 No. 319

r. 7.11.07..................................

ad. 2001 No. 319

r. 7.11.08..................................

ad. 2001 No. 319

Division 2

 

r. 7.11.09..................................

ad. 2001 No. 319

Division 3

 

r. 7.11.10..................................

ad. 2001 No. 319

r. 7.11.11..................................

ad. 2001 No. 319

r 7.11.12...................................

ad No 319, 2001

 

rs No 43, 2012

 

am F2023L01458

r. 7.11.13..................................

ad. 2001 No. 319

 

rs. 2012 No. 43

r. 7.11.14..................................

ad. 2001 No. 319

r. 7.11.15..................................

ad. 2001 No. 319

r. 7.11.16..................................

ad. 2001 No. 319

r. 7.11.17..................................

ad. 2001 No. 319

r. 7.11.18..................................

ad. 2001 No. 319

r. 7.11.19..................................

ad. 2001 No. 319

r. 7.11.20..................................

ad. 2001 No. 319

r. 7.11.21..................................

ad. 2001 No. 319

 

am. 2012 No. 43

r. 7.11.22..................................

ad. 2001 No. 319

 

rs. 2004 No. 398

 

am. 2007 No. 323

Division 4

 

r 7.11.23...................................

ad No 319, 2001

 

am F2023L01458

r. 7.11.24..................................

ad. 2001 No. 319

r. 7.11.25..................................

ad. 2001 No. 319

r 7.11.26...................................

ad No 319, 2001

 

am F2023L01458

r. 7.11.27..................................

ad. 2001 No. 319

r. 7.11.28..................................

ad. 2001 No. 319

r. 7.11.29..................................

ad. 2001 No. 319

r. 7.11.30..................................

ad. 2001 No. 319

 

am. 2002 No. 282

r. 7.11.31..................................

ad. 2001 No. 319

 

am. 2002 No. 282

r. 7.11.32..................................

ad. 2001 No. 319

 

am. 2002 No. 282

r. 7.11.33..................................

ad. 2001 No. 319

r. 7.11.34..................................

ad. 2001 No. 319

r. 7.11.35..................................

ad. 2001 No. 319

r. 7.11.36..................................

ad. 2001 No. 319

r. 7.11.37..................................

ad. 2001 No. 319

r. 7.11.38..................................

ad. 2001 No. 319

r. 7.11.39..................................

ad. 2001 No. 319

Division 5

 

r 7.11.40...................................

ad No 319, 2001

 

am No 43, 2012; F2023L01458

r. 7.11.41..................................

ad. 2001 No. 319

r. 7.11.42..................................

ad. 2001 No. 319

Division 6

 

r. 7.11.43..................................

ad. 2001 No. 319

Part 7.12

 

r. 7.12.01..................................

ad. 2001 No. 319

rr. 7.13.01-7.13.03...................

rep. 2001 No. 319

rr. 7.14.01, 7.14.02...................

rep. 2001 No. 319

r. 7.15.01..................................

rep. 2001 No. 319

Chapter 8

 

Chapter 8..................................

rep. 2001 No. 319

 

ad. 2008 No. 94

Part 8.1

 

r 8.1.01.....................................

rep No 319, 2001

 

ad No 94. 2008

 

am No 175, 2014; F2022L01689

r. 8.1.01A.................................

rep. 2001 No. 319

r 8.1.02.....................................

rep No 319, 2001

 

ad No 94, 2008

 

am No 175, 2014; F2022L01689; F2023L01458

r 8.1.03.....................................

ad No 94, 2008

 

am F2022L01689

Part 8.2

 

Division 1

 

r 8.2.01.....................................

rep No 319, 2001

 

ad No 94, 2008

 

am No 301, 2010 (md not incorp); No 175, 2014; F2023L01458

r 8.2.02.....................................

rep No 319, 2001

 

ad No 94, 2008

 

am No 301, 2010; No 175, 2014; F2023L01458

r. 8.2.03....................................

rep. 2001 No. 319

 

ad. 2008 No. 94

r. 8.2.04....................................

ad. 2008 No. 94

 

am No 190, 2013

rr. 8.3.01-8.3.06.......................

rep. 2001 No. 319

Division 4

 

r. 8.4.01....................................

rep. 2001 No. 319

 

ad. 2008 No. 94

rr. 8.4.01A, 8.4.01B..................

rep. 2001 No. 319

r. 8.4.02....................................

rep. 2001 No. 319

 

ad. 2008 No. 94

r. 8.4.03....................................

rep. 2001 No. 319

rr. 8.4.03A, 8.4.03B..................

rep. 2001 No. 319

r. 8.4.04....................................

rep. 2001 No. 319

r. 8.6.01....................................

rep. 2001 No. 319

rr. 8.7.01-8.7.03.......................

rep. 2001 No. 319

Chapter 8A

 

Chapter 8A................................

ad F2018L01144

Part 8A.4

 

Division 1

 

r 8A.4.10..................................

ad F2018L01144

Division 4

 

r 8A.4.40..................................

ad F2018L01144

r 8A.4.45..................................

ad F2018L01144

Part 8A.5

 

r 8A.5.10..................................

ad F2018L01144

 

am F2022L00469; F2023L01458

Part 8A.7

 

r 8A.7.10..................................

ad F2018L01144

r 8A.7.15..................................

ad F2018L01144

r 8A.7.20..................................

ad F2018L01144

Chapter 8B

 

Chapter 8B................................

ad F2022L00469

Part 8B.4

 

Division 1

 

r 8B.4.10...................................

ad F2022L00469

r 8B.4.15...................................

ad F2022L00469

Division 4

 

r 8B.4.40...................................

ad F2022L00469

r 8B.4.45...................................

ad F2022L00469

r 8B.4.50...................................

ad F2022L00469

Part 8B.5

 

r 8B.5.10...................................

ad F2022L00469

r 8B.5.15...................................

ad F2022L00469

r 8B.5.20...................................

ad F2022L00469

Chapter 9

 

Part 9.1

 

r 9.1.01.....................................

am No 319, 2001; No 54, 2010; No 3, 2015; F2016L01926; F2017L00117; F2018L01144

r 9.1.02.....................................

am No 319, 2001; No 198, 2007; No 325, 2007; No 54, 2010; No 3, 2015; F2016L01926; F2017L00117; F2018L01144; F2020L01654; F2022L00469; F2023L01458

Part 9.2

 

Part 9.2 heading........................

rs F2016L01926

Division 2

 

Division 2 heading....................

ad. 2004 No. 208

r. 9.2.01....................................

rs. 2004 No. 208

r 9.2.02.....................................

rs No 208, 2004

 

am F2016L01926

r. 9.2.03....................................

rs. 2004 No. 208

 

am. 2011 No. 142

r. 9.2.04....................................

rs. 2004 No. 208

 

rep. 2007 No. 325

r. 9.2.05....................................

rep. 2009 No. 198

r. 9.2.06....................................

rep. 2009 No. 198

r. 9.2.07....................................

rep. 2009 No. 198

Division 2A

 

Division 2A..............................

ad. 2004 No. 208

r. 9.2.08....................................

ad. 2004 No. 208

Part 9.2A

 

Part 9.2A...................................

ad. 2004 No. 208

Division 1

 

r 9.2A.01..................................

ad No 208, 2004

 

am F2016L01926

r. 9.2A.03.................................

ad. 2004 No. 208

Part 9.4.....................................

rep F2019L00392

r 9.4.01.....................................

rep F2019L00392

r 9.4.02.....................................

am F2018L01144

 

rep F2019L00392

r 9.4.03.....................................

ad No 194, 2003

 

rep F2019L00392

Part 9.4A

 

r 9.4A.01..................................

am No 319, 2001; F2018L01144; F2023L01458

r 9.4A.02..................................

am No 319, 2001; F2018L01144; F2023L01458

Part 9.4AB

 

Part 9.4AB................................

ad F2019L00392

r 9.4AB.01................................

ad F2019L00392

 

am F2021L01072

r 9.4AB.02................................

ad F2019L00392

 

am F2021L00581; F2021L01072

Part 9.5

 

r 9.5.01.....................................

am F2021L01854

Part 9.7

 

Part 9.7.....................................

ad. No. 117, 2013

r. 9.7.01....................................

ad. No. 117, 2013

Part 9.10

 

Part 9.10...................................

ad F2019L00392

r 9.10.01...................................

ad F2019L00392

 

am F2022L01689

Part 9.12

 

Part 9.12...................................

ad. 2002 No. 16

Heading to r. 9.12.01................

rs. 2002 No. 41

r. 9.12.01..................................

ad. 2002 No. 16

r 9.12.02...................................

ad No 41, 2002

 

rep No 145, 2002

 

ad No 182, 2002

 

am No 364, 2007; F2022L01689; F2023L01458

r. 9.12.03..................................

ad. 2002 No. 41

 

rep. 2002 No. 145

 

ad. 2003 No. 367

r 9.12.03A (prev r 9.12.04 first
occurring)

 

r 9.12.04 (first occurring).........

ad No 83, 2013

 

renum F2022L01627

r. 9.12.04 (second occurring)....

ad No 41, 2002

 

rep No 145, 2002

 

ad No 59, 2013

r 9.12.05...................................

ad No 33, 2014

Chapter 10

 

Chapter 10 heading...................

rs No 135, 2015

Part 10.1...................................

rep LA s 48C

r 10.1.01...................................

rep LA s 48C

r 10.1.02...................................

rep LA s 48C

Part 10.2

 

Heading to Part 10.2..................

rs. 2003 No. 369

Part 10.2...................................

ad. 2001 No. 319

Division 1

 

r. 10.2.01..................................

ad. 2001 No. 319

r. 10.2.02..................................

ad. 2001 No. 319

 

rs. 2002 No. 16

r. 10.2.02A...............................

ad. 2002 No. 41

r. 10.2.02B................................

ad. 2002 No. 41

Division 1A

 

Division 1A..............................

ad. 2002 No. 41

r. 10.2.02C................................

ad. 2002 No. 41

 

am. 2002 No. 53

Division 2

 

Subdivision 2.1

 

r. 10.2.03..................................

ad. 2001 No. 319

r. 10.2.04..................................

ad. 2001 No. 319

r. 10.2.05..................................

ad. 2001 No. 319

r. 10.2.06..................................

ad. 2001 No. 319

Subdivision 2.2

 

r. 10.2.07..................................

ad. 2001 No. 319

Division 3

 

r. 10.2.08..................................

ad. 2001 No. 319

r. 10.2.09..................................

ad. 2001 No. 319

r. 10.2.10..................................

ad. 2001 No. 319

r. 10.2.11..................................

ad. 2001 No. 319

Division 4

 

r. 10.2.12..................................

ad. 2001 No. 319

r. 10.2.13..................................

ad. 2001 No. 319

r. 10.2.14..................................

ad. 2001 No. 319

r. 10.2.15..................................

ad. 2001 No. 319

r. 10.2.16..................................

ad. 2001 No. 319

r. 10.2.17..................................

ad. 2001 No. 319

r. 10.2.18..................................

ad. 2001 No. 319

Division 5

 

r. 10.2.19..................................

ad. 2001 No. 319

r. 10.2.20..................................

ad. 2001 No. 319

Division 5A

 

Division 5A..............................

ad. 2002 No. 53

r. 10.2.20A...............................

ad. 2002 No. 53

Division 5B

 

Division 5B...............................

ad. 2002 No. 126

r. 10.2.20B................................

ad. 2002 No. 126

Division 6

 

r. 10.2.21..................................

ad. 2001 No. 319

r. 10.2.22..................................

ad. 2001 No. 319

Division 7

 

r. 10.2.23..................................

ad. 2001 No. 319

r. 10.2.24..................................

ad. 2001 No. 319

Division 8

 

Division 8.................................

rs. 2002 No. 145

r. 10.2.25..................................

ad. 2001 No. 319

 

am. 2002 No. 16

r. 10.2.26..................................

ad. 2001 No. 319

 

am. 2002 No. 16; 2005 No. 38

r. 10.2.27..................................

ad. 2001 No. 319

 

am. 2002 No. 16; 2005 No. 38

r. 10.2.27A...............................

ad. 2002 No. 145

Division 9

 

r. 10.2.28..................................

ad. 2001 No. 319

 

am. 2002 No. 16

r. 10.2.29..................................

ad. 2001 No. 319

 

am. 2002 No. 16

r. 10.2.29A...............................

ad. 2002 No. 16

r. 10.2.30..................................

ad. 2001 No. 319

 

am. 2002 No. 16

Division 10

 

r. 10.2.31..................................

ad. 2001 No. 319

r. 10.2.32..................................

ad. 2001 No. 319

Division 11

 

r. 10.2.33..................................

ad. 2001 No. 319

 

am. 2002 No. 16

Division 12

 

r. 10.2.34..................................

ad. 2001 No. 319

Division 13

 

r. 10.2.35..................................

ad. 2001 No. 319

r. 10.2.35A...............................

ad. 2003 No. 31

r 10.2.36...................................

ad No 319, 2001

 

rs No 31, 2003

 

am F2016L01926 (amdt never applied (Sch 1 item 96))

r. 10.2.37..................................

ad. 2001 No. 319

 

am. 2002 No. 16; 2003 No. 31

r. 10.2.38..................................

ad. 2001 No. 319

 

am. 2002 No 16 and 41; 2003 No. 31

r. 10.2.39..................................

ad. 2001 No. 319

r. 10.2.40..................................

ad. 2001 No. 319

r. 10.2.40A...............................

ad. 2002 No. 53

 

am. 2002 No. 126

r. 10.2.41..................................

ad. 2001 No. 319

 

am. 2002 No. 16

r. 10.2.42..................................

ad. 2001 No. 319

r. 10.2.43..................................

ad. 2001 No. 319

r. 10.2.44..................................

ad. 2001 No. 319

 

rep. 2007 No. 197

r. 10.2.44A...............................

ad. 2002 No. 41

 

rs. 2003 No. 31

 

am. 2003 No. 202

r. 10.2.45..................................

ad. 2001 No. 319

 

rep. 2007 No. 197

r. 10.2.46..................................

ad. 2001 No. 319

 

am. 2002 No. 16

 

(1)(a) exp 11 Mar 2004 (r 10.2.46(2))

r. 10.2.46A...............................

ad. 2002 No. 16

 

(1)(a), (2)(a), (3)(a), (4)(a) exp 11 Mar 2004 (r 10.2.46A(5))

r 10.2.47...................................

ad 2001 No 319

 

rep F2018L00515

r. 10.2.47A...............................

ad. 2002 No. 41

Division 14

 

Division 14...............................

rs. 2002 No. 16

r. 10.2.48..................................

ad. 2001 No. 319

r. 10.2.48A...............................

ad. 2003 No. 126

r. 10.2.49..................................

ad. 2001 No. 319

r 10.2.50...................................

ad No 319, 2001

 

am No 16, 2002; F2019L00392

r. 10.2.50A...............................

ad. 2002 No. 41

 

(2) exp 11 Mar 2004 (r 10.2.50A(3))

Division 15

 

r. 10.2.51..................................

ad. 2001 No. 319

 

am. 2003 No. 282

r. 10.2.52..................................

ad. 2001 No. 319

 

am. 2002 No. 16

r. 10.2.52A...............................

ad. 2002 No. 16

 

am. 2002 No. 41

r. 10.2.53..................................

ad. 2001 No. 319

 

am. 2002 No. 16

r. 10.2.54..................................

ad. 2001 No. 319

 

am. 2002 No. 16

r. 10.2.55..................................

ad. 2001 No. 319

 

am. 2002 No. 16

r. 10.2.56..................................

ad. 2001 No. 319

r. 10.2.57..................................

ad. 2001 No. 319

r. 10.2.58..................................

ad. 2001 No. 319

r. 10.2.59..................................

ad. 2001 No. 319

r. 10.2.60..................................

ad. 2001 No. 319

r. 10.2.61..................................

ad. 2001 No. 319

r. 10.2.62..................................

ad. 2001 No. 319

r. 10.2.63..................................

ad. 2001 No. 319

r. 10.2.64..................................

ad. 2001 No. 319

r. 10.2.65..................................

ad. 2001 No. 319

r. 10.2.66..................................

ad. 2001 No. 319

r. 10.2.67..................................

ad. 2001 No. 319

r. 10.2.68..................................

ad. 2001 No. 319

r. 10.2.69..................................

ad. 2001 No. 319

r. 10.2.70..................................

ad. 2001 No. 319

 

am. 2002 No. 16

r. 10.2.71..................................

ad. 2001 No. 319

 

am. 2002 No 16 and 41

r. 10.2.72..................................

ad. 2001 No. 319

r. 10.2.73..................................

ad. 2001 No. 319

r. 10.2.73A...............................

ad. 2002 No. 41

r. 10.2.73B................................

ad. 2002 No. 41

Division 16

 

r. 10.2.74..................................

ad. 2001 No. 319

 

am. 2002 No 16 and 41

r. 10.2.75..................................

ad. 2001 No. 319

 

am. 2002 No. 41

r. 10.2.76..................................

ad. 2001 No. 319

r. 10.2.77..................................

ad. 2001 No. 319

 

rs. 2002 No. 41

r. 10.2.78..................................

ad. 2001 No. 319

 

am. 2002 No. 16

r. 10.2.79..................................

ad. 2001 No. 319

 

am. 2002 No 16 and 41; 2003 No. 368

r. 10.2.80..................................

ad. 2001 No. 319

r. 10.2.81..................................

ad. 2001 No. 319

 

rs. 2003 No. 369

r. 10.2.82..................................

ad. 2001 No. 319

 

am. 2002 No. 16

r. 10.2.83..................................

ad. 2001 No. 319

r. 10.2.84..................................

ad. 2001 No. 319

r. 10.2.85..................................

ad. 2001 No. 319

r. 10.2.86..................................

ad. 2001 No. 319

r 10.2.87...................................

ad 2001 No 319

 

am 2002 No 16

 

rep F2018L00515

r. 10.2.87A...............................

ad 2003 No 31

Division 17

 

r. 10.2.88..................................

ad. 2001 No. 319

r. 10.2.89..................................

ad. 2001 No. 319

r. 10.2.90..................................

ad. 2001 No. 319

 

am. 2002 No. 16

r. 10.2.91..................................

ad. 2001 No. 319

Division 18

 

r. 10.2.92..................................

ad. 2001 No. 319

 

am. 2002 No. 16

r. 10.2.93..................................

ad. 2001 No. 319

 

am. 2002 No. 16

r. 10.2.94..................................

ad. 2001 No. 319

 

am. 2002 No. 16

r. 10.2.94A...............................

ad. 2002 No. 41

r. 10.2.94B................................

ad. 2002 No. 41

r. 10.2.95..................................

ad. 2001 No. 319

 

am. 2002 No. 16

r. 10.2.96..................................

ad. 2001 No. 319

r. 10.2.97..................................

ad. 2001 No. 319

r. 10.2.98..................................

ad. 2001 No. 319

r. 10.2.98A...............................

ad. 2002 No. 16

Division 19

 

r. 10.2.99..................................

ad. 2001 No. 319

Division 20

 

r. 10.2.100................................

ad. 2001 No. 319

r. 10.2.101................................

ad. 2001 No. 319

 

am. 2002 No. 16

r. 10.2.102................................

ad. 2001 No. 319

 

am. 2002 No. 41

r. 10.2.103................................

ad. 2001 No. 319

r. 10.2.104................................

ad. 2001 No. 319

Division 21

 

r. 10.2.105................................

ad. 2001 No. 319

r. 10.2.106................................

ad. 2001 No. 319

r. 10.2.107................................

ad. 2001 No. 319

r. 10.2.108................................

ad. 2001 No. 319

r. 10.2.109................................

ad. 2001 No. 319

r. 10.2.110................................

ad. 2001 No. 319

r. 10.2.111................................

ad. 2001 No. 319

r. 10.2.112................................

ad. 2001 No. 319

r. 10.2.113................................

ad. 2001 No. 319

r. 10.2.114................................

ad. 2001 No. 319

r. 10.2.115................................

ad. 2001 No. 319

Division 22

 

r. 10.2.116................................

ad. 2001 No. 319

r. 10.2.117................................

ad. 2001 No. 319

Division 23

 

r. 10.2.118................................

ad. 2001 No. 319

Division 24

 

r. 10.2.119................................

ad. 2001 No. 319

Division 24A

 

Division 24A............................

ad. 2002 No. 16

r. 10.2.119A.............................

ad. 2002 No. 16

r. 10.2.119B..............................

ad. 2002 No. 41

r. 10.2.119C..............................

ad. 2002 No. 41

Division 25

 

Division 25...............................

ad. 2001 No. 319

r. 10.2.120................................

ad. 2001 No. 319

Division 25A

 

Division 25A............................

ad. 2002 No. 16

r. 10.2.120A.............................

ad. 2002 No. 16

Division 25B

 

Division 25B.............................

ad. 2002 No. 16

r. 10.2.120B..............................

ad. 2002 No. 16

 

am. 2002 No. 41

Division 26

 

Division 26...............................

rep F2018L00515

r. 10.2.121................................

ad. 2001 No. 319

 

rep F2018L00515

Division 27

 

r. 10.2.122................................

ad. 2001 No. 319

 

rep. 2002 No. 16

 

ad. 2002 No. 41

r. 10.2.123................................

ad. 2001 No. 319

r. 10.2.124................................

ad. 2001 No. 319

 

rs. 2002 No. 16

 

am. 2002 No. 41

r. 10.2.125................................

ad. 2001 No. 319

r. 10.2.126................................

ad. 2001 No. 319

r. 10.2.127................................

ad. 2001 No. 319

r. 10.2.128................................

ad. 2001 No. 319

r. 10.2.129................................

ad. 2001 No. 319

r. 10.2.130................................

ad. 2001 No. 319

r. 10.2.131................................

ad. 2001 No. 319

r. 10.2.132................................

ad. 2001 No. 319

r. 10.2.133................................

ad. 2001 No. 319

r. 10.2.134................................

ad. 2001 No. 319

r. 10.2.135................................

ad. 2001 No. 319

Division 27A

 

Division 27A of Part 10.2.........

ad. 2002 No. 41

r. 10.2.135A.............................

ad. 2002 No. 41

Division 28

 

r. 10.2.136................................

ad. 2001 No. 319

r. 10.2.137................................

ad. 2001 No. 319

r. 10.2.138................................

ad. 2001 No. 319

 

am. 2002 No. 41

Division 29

 

Division 29 of Part 10.2............

ad No 16, 2002

r 10.2.139.................................

ad No 16, 2002

r 10.2.140.................................

ad No 16, 2002

r 10.2.141.................................

ad No 16, 2002

r 10.2.142.................................

ad No 16, 2002

r 10.2.143.................................

ad No 16, 2002

r 10.2.144.................................

ad No 16, 2002

r 10.2.145.................................

ad No 16, 2002

r 10.2.146.................................

ad No 16, 2002

 

am. 2002 No. 41

Division 30

 

Division 30 of Part 10.2............

ad No 16, 2002

r 10.2.147.................................

ad No 16, 2002

r 10.2.148.................................

ad No 16, 2002

 

am No. 41, 2002

r 10.2.149.................................

ad No 16, 2002

r 10.2.150.................................

ad No 16, 2002

r 10.2.151.................................

ad No 16, 2002

 

am. 2002 No. 41

r 10.2.152.................................

ad No 16, 2002

r 10.2.153.................................

ad No 16, 2002

r 10.2.154.................................

ad No 16, 2002

r 10.2.155.................................

ad No 16, 2002

r 10.2.156.................................

ad No 16, 2002

 

am. 2002 No. 41

r 10.2.157.................................

ad No 16, 2002

r 10.2.158.................................

ad No 16, 2002

r 10.2.159.................................

ad No 16, 2002

r 10.2.160.................................

ad No 16, 2002

r 10.2.161.................................

ad No 16, 2002

r 10.2.162.................................

ad No 16, 2002

r 10.2.163.................................

ad No 16, 2002

r 10.2.164.................................

ad No 16, 2002

r 10.2.165.................................

ad No 16, 2002

r 10.2.166.................................

ad No 16, 2002

r 10.2.167.................................

ad No 16, 2002

r 10.2.168.................................

ad No 16, 2002

r 10.2.169.................................

ad No 16, 2002

 

am. 2002 No. 41

r 10.2.170.................................

ad No 16, 2002

Division 31

 

Division 31 of Part 10.2............

ad No 16, 2002

r 10.2.171.................................

ad No 16, 2002

r 10.2.172.................................

ad No 16, 2002

r 10.2.173.................................

ad No 16, 2002

r 10.2.174.................................

ad No 16, 2002

r 10.2.175.................................

ad No 16, 2002

Division 32

 

Division 32 of Part 10.2............

ad No 16, 2002

r 10.2.176.................................

ad No 16, 2002

r 10.2.177.................................

ad No 16, 2002

r 10.2.178.................................

ad No 16, 2002

r 10.2.179.................................

ad No 16, 2002

Division 33

 

Division 33 of Part 10.2............

ad No 16, 2002

r 10.2.180.................................

ad No 16, 2002

r 10.2.181.................................

ad No 16, 2002

r 10.2.182.................................

ad No 16, 2002

r 10.2.183.................................

ad No 16, 2002

r 10.2.184.................................

ad No 16, 2002

r 10.2.185.................................

ad No 16, 2002

r 10.2.186.................................

ad No 16, 2002

r 10.2.187.................................

ad No 16, 2002

r 10.2.188.................................

ad No 16, 2002

r 10.2.189.................................

ad No 16, 2002

 

am F2018L01144

r 10.2.190.................................

ad No 16, 2002

r 10.2.191.................................

ad No 16, 2002

r 10.2.192.................................

ad No 16, 2002

r 10.2.193.................................

ad No 16, 2002

Division 34

 

Division 34 of Part 10.2............

ad No 16, 2002

r 10.2.194.................................

ad No 16, 2002

Division 35

 

Division 35 of Part 10.2............

ad No 16, 2002

r 10.2.195.................................

ad No 16, 2002

Division 36

 

Division 36 of Part 10.2............

ad No 16, 2002

r 10.2.196.................................

ad No 16, 2002

Division 37

 

Division 37 of Part 10.2............

ad No 16, 2002

r 10.2.197.................................

ad No 16, 2002

 

am 2002 No. 41

r 10.2.198.................................

ad No 16, 2002

 

am 2002 No. 41

Division 38

 

Division 38 of Part 10.2............

ad No 16, 2002

r 10.2.199.................................

ad No 16, 2002

Division 39

 

Division 39 of Part 10.2............

ad No 16, 2002

r 10.2.200.................................

ad No 16, 2002

 

am. 2002 No. 41

Division 40...............................

ad No 16, 2002

 

rep F2022L01627

r 10.2.201.................................

ad No 16, 2002

 

am No 126, 2002

 

rep F2022L01627

r 10.2.201A..............................

ad No 126, 2002

 

rep F2022L01627

Division 41

 

Division 41 of Part 10.2............

ad No 16, 2002

r 10.2.202.................................

ad No 16, 2002

 

am. 2003 No. 368

Division 42

 

Division 42 of Part 10.2............

ad No 16, 2002

r 10.2.203.................................

ad No 16, 2002

Division 43

 

Division 43 of Part 10.2............

ad No 16, 2002

r 10.2.204.................................

ad No 16, 2002

Division 44

 

Division 44 of Part 10.2............

ad No 16, 2002

r 10.2.205.................................

ad No 16, 2002

Division 45

 

Division 45 of Part 10.2............

ad No 16, 2002

r 10.2.206.................................

ad No 16, 2002

 

am. 2002 No. 41

r 10.2.207.................................

ad No 16, 2002

 

rs. 2002 No. 41

Division 46

 

Division 46 of Part 10.2............

ad No 16, 2002

r 10.2.208.................................

ad No 16, 2002

r 10.2.209.................................

ad No 16, 2002

Division 47

 

Division 47 of Part 10.2............

ad. 2002 No. 41

r. 10.2.210................................

ad. 2002 No. 41

Division 48

 

Division 48 of Part 10.2............

ad. 2002 No. 41

r. 10.2.211................................

ad. 2002 No. 41

Division 49

 

Division 49 of Part 10.2............

ad. 2002 No. 41

r. 10.2.212................................

ad. 2002 No. 41

Division 50

 

Division 50 of Part 10.2............

ad. 2003 No. 85

r. 10.2.213................................

ad. 2003 No. 85

Division 51 of Part 10.2............

ad. 2003 No. 369

 

rep. 2005 No. 324

r. 10.2.214................................

ad. 2003 No. 369

 

rep. 2005 No. 324

Division 52

 

Division 52 of Part 10.2............

ad. 2004 No. 26

r. 10.2.215................................

ad. 2004 No. 26

Part 10.5

 

Part 10.5...................................

ad No. 208, 2004

r 10.5.01...................................

ad No. 208, 2004

 

am No. 399, 2004; No. 126, 2004

Part 10.15

 

Part 10.14 heading....................

rep No 193, 2011

Part 10.15 heading....................

ad No 193, 2011

r 10.14.01 heading....................

rep No 193, 2011

r 10.15.01 heading....................

ad No 193, 2011

r 10.14.02.................................

ad No 210, 2010

 

renum No 193, 2011

r 10.15.02 (prev r 10.14.02).....

renum No 193, 2011

r 10.14.03.................................

ad No 210, 2010

r 10.15.03 (prev r 10.14.03).....

renum No 193, 2011

r 10.14.04.................................

ad No 210, 2010

r 10.15.04 (prev r 10.14.04).....

renum No 193, 2011

r 10.14.05.................................

ad No 210, 2010

r. 10.15.05 (prev r 10.14.05)....

renum No 193, 2011

r 10.14.06.................................

ad No 210, 2010

r. 10.15.06 (prev r 10.14.06)....

renum No 193, 2011

Part 10.18

 

Part 10.18.................................

ad No 170, 2012

r 10.18.01.................................

ad No 170, 2012

 

rep 1 July 2013 (r 10.18.01(3))

Part 10.19

 

Part 10.19.................................

ad No 155, 2013

r 10.19.01.................................

ad No 155, 2013

Part 10.20.................................

ad No 3, 2015

 

rep F2017L00117

r 10.20.01.................................

ad No 3, 2015

 

rep F2017L00117

r 10.20.02.................................

ad No 3, 2015

 

rep F2017L00117

r 10.20.03.................................

ad No 3, 2015

 

rep F2017L00117

r 10.20.04.................................

ad No 3, 2015

 

rep F2017L00117

r 10.20.05.................................

ad No 3, 2015

 

rep F2017L00117

r 10.20.06.................................

ad No 3, 2015

 

rep F2017L00117

r 10.20.07.................................

ad No 3, 2015

 

rep F2017L00117

r 10.20.08.................................

ad No 3, 2015

 

rep F2017L00117

r 10.20.09.................................

ad No 3, 2015

 

rep F2017L00117

r 10.20.10.................................

ad No 3, 2015

 

rep F2017L00117

r 10.20.11.................................

ad No 3, 2015

 

rep F2017L00117

r 10.20.12.................................

ad No 3, 2015

 

rep F2017L00117

r 10.20.13.................................

ad No 3, 2015

 

rep F2017L00117

r 10.20.14.................................

ad No 3, 2015

 

rep F2017L00117

r 10.20.15.................................

ad No 3, 2015

 

rep F2017L00117

r 10.20.16.................................

ad No 3, 2015

 

rep F2017L00117

r 10.20.17.................................

ad No 3, 2015

 

rep F2017L00117

Part 10.21

 

Part 10.21.................................

ad No 157, 2015

r 10.21.01.................................

ad No 157, 2015

Part 10.22

 

Part 10.22.................................

ad No 135, 2015

r 10.22.01.................................

ad No 135, 2015

r 10.22.02.................................

ad No 135, 2015

Part 10.23

 

Part 10.23.................................

ad F2016L00514

r 10.23.01.................................

ad F2016L00514

Part 10.24

 

Part 10.24.................................

ad F2016L01657

r 10.24.01.................................

ad F2016L01657

Part 10.25

 

Part 10.25.................................

ad F2016L01926

r 10.25.01.................................

ad F2016L01926

r 10.25.02.................................

ad F2016L01926

Part 10.25

 

Part 10.25 (second occurring)...

ad F2017L00321

r 10.25.01 (second occurring)...

ad F2017L00321

Part 10.26

 

Part 10.26.................................

ad F2017L00455

r 10.26.01.................................

ad F2017L00455

Part 10.27

 

Part 10.27.................................

ad F2018L00515

r 10.27.01.................................

ad F2018L00515

r 10.27.02.................................

ad F2018L00515

r 10.27.03.................................

ad F2018L00515

r 10.27.04.................................

ad F2018L00515

Part 10.28

 

Part 10.28.................................

ad F2018L00743

r 10.28.01.................................

ad F2018L00743

Part 10.29

 

Part 10.29.................................

ad F2019L00539

r 10.29.01.................................

ad F2019L00539

r 10.29.02.................................

ad F2019L00539

r 10.29.03.................................

ad F2019L00539

r 10.29.04.................................

ad F2019L00539

Part 10.30

 

Part 10.30.................................

ad F2019L00538

r 10.30.01.................................

ad F2019L00538

Part 10.31

 

Part 10.31.................................

ad F2019L00392

r 10.31.01.................................

ad F2019L00392

Part 10.32

 

Part 10.32.................................

ad F2019L00537

r 10.32.01.................................

ad F2019L00537

Part 10.33

 

Part 10.33.................................

ad F2019L01526

r 10.33.01.................................

ad F2019L01526

r 10.33.02.................................

ad F2019L01526

Part 10.34

 

Part 10.34.................................

ad F2019L01474

r 10.34.01.................................

ad F2019L01474

Part 10.35

 

Part 10.35.................................

ad F2021L01531

r 10.35.01.................................

ad F2021L01531

Part 10.37

 

Part 10.37.................................

ad F2019L01533

r 10.37.01.................................

ad F2019L01533

Part 10.38

 

Part 10.38.................................

ad F2020L00942

r 10.38.01.................................

ad F2020L00942

Part 10.39

 

Part 10.39.................................

ad F2021L01080

r 10.39.01.................................

ad F2021L01080

Part 10.40

 

Part 10.40.................................

ad F2020L01586

r 10.40.01.................................

ad F2020L01586

r 10.40.02.................................

ad F2020L01586

Part 10.41

 

Part 10.41.................................

ad F2021L01072

r 10.41.01.................................

ad F2021L01072

Part 10.42

 

Part 10.42.................................

ad F2021L00127

r 10.42.01.................................

ad F2021L00127

Part 10.43

 

Part 10.43.................................

ad F2020L01654

r 10.43.01.................................

ad F2020L01654

Part 10.45

 

Part 10.45.................................

ad F2021L00660

r 10.45.01.................................

ad F2021L00660

Part 10.46.................................

ad F2021L01801 (disallowed)

r 10.46.01.................................

ad F2021L01801 (disallowed)

r 10.46.02.................................

ad F2021L01801 (disallowed)

Part 10.47

 

Part 10.47.................................

ad F2021L01608

r 10.47.01.................................

ad F2021L01608

Part 10.48

 

Part 10.48 (first occurring)........

ad F2022L01614

r 10.48.01 (first occurring).......

ad F2022L01614

Part 10.49

 

Part 10.48 (second occurring)...

ad F2022L01689

 

renum F2023L01458

Part 10.49 (prev Part 10.48 (second occuring))

 

r 10.48.01 (second occurring)...

ad F2022L01689

 

renum F2023L01458

r 10.49.01 (prev r 10.48.01 (second occuring))

 

Part 10.50

 

Part 10.50.................................

ad F2023L00990

r 10.50.01.................................

ad F2023L00990

Chapter 12

 

Part 12.4

 

r 12.4.04...................................

am F2023L01423

Part 12.6

 

r 12.1.01...................................

ed C124

r 12.06.01A..............................

ad No 184, 2010

Part 12.7

 

Division 2

 

r 12.7.06...................................

ad No 85, 2003

 

am No 368, 2003

Part 12.8

 

Division 1

 

r 12.8.02...................................

am No 227, 2007; No 175, 2009

r 12.8.03...................................

am F2022L01689

Division 2

 

r 12.8.06...................................

am No 227, 2007

r 12.8.08...................................

am No 319, 2001

Schedule 1

 

Schedule 1................................

am No 319, 2001; No 194, 2003; No 208, 2004; No 399, 2004; No 195, 2007; No 198, 2009; No 387, 2009; No 152, 2013; F2016L01926; F2019L00392; F2020L01610; F2022L01689

Schedule 2

 

Form 105..................................

rs No 198, 2009

Form 2M01...............................

ad No 399, 2004

 

rep No 152, 2013

Form 2M02...............................

ad No 399, 2004

 

rep No 152, 2013

Form 2M03...............................

ad No 399, 2004

 

rep No 152, 2013

Form 309..................................

rep No 195, 2007

Form 311..................................

rep No 195, 2007

Form 312..................................

rep No 195, 2007

Form 316..................................

rep No 194, 2003

Form 350..................................

rep No 195, 2007

Form 504..................................

rep No 399, 2004

Form 505..................................

rep No 399, 2004

Form 506..................................

rep No 399, 2004

Form 507..................................

rep No 399, 2004

Form 507A...............................

rep No 399, 2004

Form 508..................................

rep No 399, 2004

Form 509..................................

rep No 399, 2004

Form 509C................................

rep F2016L01926

Form 509D...............................

rep No 399, 2004

Form 509F................................

rep No 399, 2004

Form 509G...............................

rep No 399, 2004

Form 509H...............................

am No 16, 2002

 

rs No 325, 2007

 

am Act No 22, 2020; F2020L01654; F2021L00660; F2022L01689

Form 5249................................

rep F2022L01689

Form 519..................................

rep No 399, 2004

Form 521..................................

rep F2016L01926

Form 522..................................

rep No 399, 2004

Form 523..................................

rep No 399, 2004

Form 524..................................

rep No 399, 2004

Form 525..................................

rep No 399, 2004

Form 529..................................

am No 325, 2007

 

rs No 198, 2009

Form 529A...............................

rep F2016L01926

Form 529B................................

rep F2016L01926

Form 530..................................

rep F2016L01926

Form 531A...............................

rep F2016L01926

Form 531B................................

am No 325, 2007

 

rep F2016L01926

Form 531C................................

rep F2016L01926

Form 532..................................

rep F2016L01926

Form 533..................................

rep No 114, 2012

Form 534..................................

rep No 114, 2012

Form 540..................................

rep No 399, 2004

Form 545..................................

rep No 399, 2004

Form 546..................................

rep No 114, 2012

Form 551..................................

ed C124

Form 586..................................

ad F2022L01689

Form 588..................................

rs F2022L01689

Form 603..................................

rs F2018L01144

Form 604..................................

rs F2018L01144

Form 605..................................

rs F2018L01144

Form 701..................................

ad No 387, 2009

Form 587..................................

am F2020L01610

Form 588..................................

ad F2020L01610

Form 589..................................

ad F2020L01610

Form 702..................................

rep No 319, 2001

Form 703..................................

rep No 319, 2001

Form 704..................................

rep No 319, 2001

Form 705..................................

rep No 319, 20019

Form 707..................................

rep No 319, 2001

Form 708..................................

rep No 319, 2001

Form 709..................................

rep No 319, 2001

Form 710..................................

rep No 319, 2001

Form 711..................................

rep No 319, 2001

Form 712..................................

rep No 319, 2001

Form 713..................................

rep No 319, 2001

Form 714..................................

rep No 319, 2001

Form 715..................................

rep No 319, 2001

Form 716..................................

rep No 319, 2001

Form 717..................................

rep No 319, 2001

Form 718..................................

rep No 319, 2001

Form 719..................................

rs No 319, 2001

Form 719A...............................

rs No 319, 2001

 

am No 16, 2002; No 26, 2004

Form 719B................................

rs No 319, 2001

Form 720..................................

rs No 319, 2001

Form 721..................................

rs No 319, 2001

 

am No 26, 2004

Form 802..................................

rep No 319, 2001

Form 802A...............................

rep No 319, 2001

Form 803..................................

rep No 319, 2001

Form 803C................................

rep No 319, 2001

Form 804..................................

rep No 319, 2001

Form 805..................................

rep No 319, 2001

Form 806..................................

rep No 319, 2001

Form 807..................................

rep No 319, 2001

Form 807A...............................

rep No 319, 2001

Form 808..................................

rep No 319, 2001

Form 809..................................

rep No 319, 2001

Form 810..................................

rep No 319, 2001

Form 811..................................

rep No 319, 2001

Form 812..................................

rep No 319, 2001

Form 902..................................

rep No 319, 2001

Form 903A...............................

rep No 208, 2004

Form 903B................................

rep No 198, 2009

Form 904..................................

rep No 198, 2009

Form 905A...............................

rep No 399, 2004

Form 907..................................

rep No 208, 2004

Form 908..................................

rep No 399, 2004

Form 910..................................

rep F2019L00392

Schedule 2A

 

Schedule 2A..............................

ad No 319, 2001

Form 1......................................

ad No 319, 2001

Form 2......................................

ad No 319, 2001

Form 3......................................

ad No 319, 2001

Form 4......................................

ad No 319, 2001

Form 5......................................

ad No 319, 2001

Form 6......................................

ad No 319, 2001

Form 7......................................

ad No 319, 2001

Form 8......................................

ad No 319, 2001

Form 9......................................

ad No 319, 2001

Form 10....................................

ad No 319, 2001

Schedule 3

 

Schedule 3................................

am No 319, 2001; No 398, 2004

Schedule 4

 

Schedule 4................................

am No 319, 2001; No 398, 2004; No 332, 2010; F2018L01144

Schedule 5A..............................

rep No 194, 2007

Schedule 5B..............................

ad No 160, 2005

 

am No 126, 2006

 

rep No 193, 2007

Schedule 5C

 

Schedule 5C..............................

ad No 126, 2006

 

am F2023L01458

Schedule 6

 

Schedule 6................................

am No 318, 2001; No 319, 2001; No 362, 2006; No 272, 2010; F2018L01144; F2019L01641; F2022L00469

Schedule 7

 

Schedule 7................................

am F2020L01610

Schedule 7A

 

Schedule 7A..............................

ad No 171, 2012

 

am F2023L01458

Schedule 8

 

Schedule 8................................

am No 319, 2001

 

ed C124

 

am F2022L00469

Schedule 8A

 

Schedule 8A..............................

am No 325, 2007

Schedule 8AA

 

Schedule 8AA...........................

ad No 88, 2010

 

am No 43, 2012; F2016L01902; F2022L01627

Schedule 8AB

 

Schedule 8AB...........................

ad No 88, 2010

Schedule 8AC

 

Schedule 8AC...........................

ad No 88, 2010

Schedule 8AD

 

Schedule 8AD...........................

ad No 88, 2010

 

am No 43, 2012

Schedule 8AE

 

Schedule 8AE...........................

ad No 88, 2010

Schedule 8B..............................

ad No 15, 2002

 

rep F2023L01458

Schedule 8C

 

Schedule 8C..............................

ad No 26, 2004

 

am No 70, 2009

 

am No 190, 2013; F2023L01458

Schedule 8D

 

Schedule 8D..............................

ad No 3, 2015

 

rep F2017L00117

 

ad F2021L01531

 

am F2023L01458

Schedule 9

 

Schedule 9 heading...................

am No 319, 2001

 

rs 2012 No 43

Schedule 9................................

am No 319, 2001; No 26, 2004; No 325, 2007

 

rs No 43, 2012

Schedule 10

 

Schedule 10..............................

ad No 319, 2001

 

am No 16, 2002

 

rs No 31, 2005

 

am No 155, 2013; F2018L01144; F2019L00539; F2022L00469; F2022L01689

Schedule 10A

 

Schedule 10A heading...............

am No 16, 2002

 

rs No 94, 2008; No 135, 2010; No 42, 2012

Schedule 10A............................

ad No 319, 2001

 

am No 16, 2002; No 41, 2002; No 31, 2003; No 369, 2003; No 31, 2005; No 94, 2008; No 158, 2008; No 135, 2010; No 301, 2010; No 42, 2012; No 155, 2013; No 175, 2014; No 91, 2015; F2016L00710; F2022L00469; F2023L01458

Schedule 10AA

 

Schedule 10AA.........................

ad No 94, 2008

 

am No 301, 2010; No 175, 2014

Schedule 10B heading...............

am No 16, 2002

 

rep No 31, 2005

 

ad No 158, 2008

 

rep No 91, 2015

Schedule 10B............................

ad No 319, 2001

 

am No 16, 2002; No 41, 2002; No 26, 2004

 

rep No 31, 2005

 

ad No 158, 2008

 

am No 194, 2008; No 55, 2010; No 66, 2011

 

rep No 91, 2015

Schedule 10BA

 

Schedule 10BA.........................

ad No 324, 2005 (md)

 

am F2018L01144; F2022L00469; F2023L01458

Schedule 10C

 

Schedule 10C heading...............

am F2023L01458

Schedule 10C............................

ad No 319, 2001

 

am No 16, 2002; No 41, 2002

 

rep No 31, 2005

 

ad No 135, 2010

 

am F2023L01458

Schedule 10D

 

Schedule 10D............................

ad No 135, 2010

 

am No 155, 2013; F2019L00539

Schedule 10E

 

Schedule 10E............................

ad No 135, 2010

 

am No 274, 2011; F2018L01144

Schedule 10F

 

Schedule 10F............................

ad F2022L00469

Schedule 11

 

Schedule 11..............................

am No 208, 2001

 

rep No 319, 2001

Schedule 10D heading...............
(second occurring)

rs and renum F2016L01926

Schedule 10D............................
(second occurring)

ad No 319, 2001
am No 31, 2003; F2016L01926

Schedule 11 (prev Schedule 10D
second occurring)

 

Schedule 13

 

Schedule 13..............................

ad F2016L01926


 



AustLII: Copyright Policy | Disclaimers | Privacy Policy | Feedback